Filming Schedule

Scenes(with respect to   Details                              Date
the storyboard)
Scene 7,11 & 16          Live footage of Billy Lockett-       Thursday 1st November
                         (Leicester-The Donkey)               Starts at 8:30PM
                         Two cameras at different
                         angles, main focus being the
                         artist not the audience or
                         band.
Scene 1,2,6,13,17 & 18   Filming the male character           Friday 2nd November
                         with a guitar down a street to       Start at 11:00AM
                         meet his girlfriend/partner.
                         This can be cut into these
                         scenes as oppose to filming
                         each one separately.
Scenes 3 & 4             Filming in the club/pub.             Friday 9th November
                         Two separate groups, girls and       Start at 7:00PM
                         boys, they meet at the bar.
                         Long shot of the groups. Close
                         up of the two main characters.
Scene 5                  The two characters walking in        Saturday 10th November
                         a field, holding hands. Close up     Start at 12:00PM
                         of their faces and an extreme
                         close up of their hands. Mid
                         shot of them, maybe a wide
                         shot of the location.
Scene 8,9,10 & 12        The footage of the two               Sunday 11th November
                         characters moving into a             Start at 11:00AM
                         house, and all the scenes that
                         involves filming in this location.
Scenes 14 & 15           Filming the two scenes. Scene        Saturday 17th November
                         15 involves possible stop            Start at 1:00PM
                         motion, we will film this as well
                         as taking pictures on a camera,
                         incase the stop motion doesn’t
                         work.
Editing Schedule

Details                                         Date
Upload all footage into the project and         Monday 19th November
collect together all clips.
Put the clips in order of the scenes and cut    Wednesday 21st November
them to a desired length.
Refine the footage and add the soundtrack.      Friday 23rd November
Begin to look closely at the timings and how    Tuesday 27th November
they synch to the clips.
Continue with the timings and synching of       Thursday 29th November
the clips.
Finish synching the clips and timings of the    Friday 30th November
music.
Edit in the transitions between clips and add   Tuesday 4th December
desired effects to the video.
Finish all the editing                          Thursday 6th December

More Related Content

What's hot

Filming day
Filming dayFilming day
Filming dayab8179
 
Location stills for our music video
Location stills for our music videoLocation stills for our music video
Location stills for our music videoCaintlinRenwick
 
Shooting Schedule
Shooting Schedule Shooting Schedule
Shooting Schedule jojo6774
 
Evaluating Question 7
Evaluating Question 7Evaluating Question 7
Evaluating Question 7Ryan Jamniuk
 
1998 - The Unfinished Revolution - Engelbart & Rulifson
1998 - The Unfinished Revolution - Engelbart & Rulifson1998 - The Unfinished Revolution - Engelbart & Rulifson
1998 - The Unfinished Revolution - Engelbart & RulifsonDoug Engelbart Institute
 
Music Video Treatment
Music Video TreatmentMusic Video Treatment
Music Video Treatmentwrij93
 
First stage of filming
First stage of filmingFirst stage of filming
First stage of filmingKatie Leese
 
First treatment
First treatmentFirst treatment
First treatmentJayden2431
 
From the start
From the startFrom the start
From the startnbolus2
 
A2 Media Filming diary
A2 Media Filming diaryA2 Media Filming diary
A2 Media Filming diarylibbyannjones
 
Modified Treatment
Modified TreatmentModified Treatment
Modified Treatmentwrij93
 

What's hot (20)

Filming day
Filming dayFilming day
Filming day
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Location stills for our music video
Location stills for our music videoLocation stills for our music video
Location stills for our music video
 
Schedule
ScheduleSchedule
Schedule
 
Shooting plan 4
Shooting plan 4Shooting plan 4
Shooting plan 4
 
Shooting Schedule
Shooting Schedule Shooting Schedule
Shooting Schedule
 
Shooting plan 2
Shooting plan 2Shooting plan 2
Shooting plan 2
 
Pp production log_template
Pp production log_templatePp production log_template
Pp production log_template
 
Shooting plan 3
Shooting plan 3Shooting plan 3
Shooting plan 3
 
Shooting plans 1
Shooting plans 1Shooting plans 1
Shooting plans 1
 
Evaluating Question 7
Evaluating Question 7Evaluating Question 7
Evaluating Question 7
 
1998 - The Unfinished Revolution - Engelbart & Rulifson
1998 - The Unfinished Revolution - Engelbart & Rulifson1998 - The Unfinished Revolution - Engelbart & Rulifson
1998 - The Unfinished Revolution - Engelbart & Rulifson
 
Music Video Treatment
Music Video TreatmentMusic Video Treatment
Music Video Treatment
 
First stage of filming
First stage of filmingFirst stage of filming
First stage of filming
 
First treatment
First treatmentFirst treatment
First treatment
 
From the start
From the startFrom the start
From the start
 
A2 Media Filming diary
A2 Media Filming diaryA2 Media Filming diary
A2 Media Filming diary
 
Modified Treatment
Modified TreatmentModified Treatment
Modified Treatment
 
Location 3
Location 3Location 3
Location 3
 
Se7en
Se7enSe7en
Se7en
 

Viewers also liked

Agenda semanal sede a del 15 al 19 de septiembre
Agenda semanal sede a del 15 al 19  de septiembreAgenda semanal sede a del 15 al 19  de septiembre
Agenda semanal sede a del 15 al 19 de septiembreYamile
 
Testimonial_Infinity
Testimonial_InfinityTestimonial_Infinity
Testimonial_InfinityEd Morrison
 
Magazine Surface - Torréfaction locale pour un plancher durable - Alain Fortier
Magazine Surface - Torréfaction locale pour un plancher durable - Alain FortierMagazine Surface - Torréfaction locale pour un plancher durable - Alain Fortier
Magazine Surface - Torréfaction locale pour un plancher durable - Alain FortierAlain Fortier
 
Nguyen thi kim tien
Nguyen thi kim tienNguyen thi kim tien
Nguyen thi kim tienchunghia
 
15 de Setembro - Dia do Musicoterapeuta
15 de Setembro - Dia do Musicoterapeuta15 de Setembro - Dia do Musicoterapeuta
15 de Setembro - Dia do MusicoterapeutaKELLY BESSA
 

Viewers also liked (12)

Agenda semanal sede a del 15 al 19 de septiembre
Agenda semanal sede a del 15 al 19  de septiembreAgenda semanal sede a del 15 al 19  de septiembre
Agenda semanal sede a del 15 al 19 de septiembre
 
Gata 1
Gata 1Gata 1
Gata 1
 
Practica 28
Practica 28Practica 28
Practica 28
 
Uesme
UesmeUesme
Uesme
 
About cathy
About cathyAbout cathy
About cathy
 
Testimonial_Infinity
Testimonial_InfinityTestimonial_Infinity
Testimonial_Infinity
 
Magazine Surface - Torréfaction locale pour un plancher durable - Alain Fortier
Magazine Surface - Torréfaction locale pour un plancher durable - Alain FortierMagazine Surface - Torréfaction locale pour un plancher durable - Alain Fortier
Magazine Surface - Torréfaction locale pour un plancher durable - Alain Fortier
 
Nguyen thi kim tien
Nguyen thi kim tienNguyen thi kim tien
Nguyen thi kim tien
 
Teste
TesteTeste
Teste
 
Sem título 1
Sem título 1Sem título 1
Sem título 1
 
Frys
FrysFrys
Frys
 
15 de Setembro - Dia do Musicoterapeuta
15 de Setembro - Dia do Musicoterapeuta15 de Setembro - Dia do Musicoterapeuta
15 de Setembro - Dia do Musicoterapeuta
 

More from chloef123

Analysis of Album Covers
Analysis of Album CoversAnalysis of Album Covers
Analysis of Album Coverschloef123
 
Filming and Editing Schedules
Filming and Editing SchedulesFilming and Editing Schedules
Filming and Editing Scheduleschloef123
 
Digital Technology
Digital TechnologyDigital Technology
Digital Technologychloef123
 
Storyboard first draft
Storyboard first draftStoryboard first draft
Storyboard first draftchloef123
 
Used, Develop and Challenged Conventions of my Media Product
Used, Develop and Challenged Conventions of my Media ProductUsed, Develop and Challenged Conventions of my Media Product
Used, Develop and Challenged Conventions of my Media Productchloef123
 
What I Have Learnt About Technology
What I Have Learnt About Technology What I Have Learnt About Technology
What I Have Learnt About Technology chloef123
 
Different Layout for Front Cover
Different Layout for Front CoverDifferent Layout for Front Cover
Different Layout for Front Coverchloef123
 
Different layouts for Front Cover
Different layouts for Front CoverDifferent layouts for Front Cover
Different layouts for Front Coverchloef123
 
Different Fonts for Title
Different Fonts for TitleDifferent Fonts for Title
Different Fonts for Titlechloef123
 
Music magazine questionnaire
Music magazine questionnaireMusic magazine questionnaire
Music magazine questionnairechloef123
 

More from chloef123 (11)

Analysis of Album Covers
Analysis of Album CoversAnalysis of Album Covers
Analysis of Album Covers
 
Filming and Editing Schedules
Filming and Editing SchedulesFilming and Editing Schedules
Filming and Editing Schedules
 
Digital Technology
Digital TechnologyDigital Technology
Digital Technology
 
Storyboard first draft
Storyboard first draftStoryboard first draft
Storyboard first draft
 
Used, Develop and Challenged Conventions of my Media Product
Used, Develop and Challenged Conventions of my Media ProductUsed, Develop and Challenged Conventions of my Media Product
Used, Develop and Challenged Conventions of my Media Product
 
What I Have Learnt About Technology
What I Have Learnt About Technology What I Have Learnt About Technology
What I Have Learnt About Technology
 
Different Layout for Front Cover
Different Layout for Front CoverDifferent Layout for Front Cover
Different Layout for Front Cover
 
Different layouts for Front Cover
Different layouts for Front CoverDifferent layouts for Front Cover
Different layouts for Front Cover
 
Different Fonts for Title
Different Fonts for TitleDifferent Fonts for Title
Different Fonts for Title
 
Music magazine questionnaire
Music magazine questionnaireMusic magazine questionnaire
Music magazine questionnaire
 
Technology
TechnologyTechnology
Technology
 

Filming and editing schedule

  • 1. Filming Schedule Scenes(with respect to Details Date the storyboard) Scene 7,11 & 16 Live footage of Billy Lockett- Thursday 1st November (Leicester-The Donkey) Starts at 8:30PM Two cameras at different angles, main focus being the artist not the audience or band. Scene 1,2,6,13,17 & 18 Filming the male character Friday 2nd November with a guitar down a street to Start at 11:00AM meet his girlfriend/partner. This can be cut into these scenes as oppose to filming each one separately. Scenes 3 & 4 Filming in the club/pub. Friday 9th November Two separate groups, girls and Start at 7:00PM boys, they meet at the bar. Long shot of the groups. Close up of the two main characters. Scene 5 The two characters walking in Saturday 10th November a field, holding hands. Close up Start at 12:00PM of their faces and an extreme close up of their hands. Mid shot of them, maybe a wide shot of the location. Scene 8,9,10 & 12 The footage of the two Sunday 11th November characters moving into a Start at 11:00AM house, and all the scenes that involves filming in this location. Scenes 14 & 15 Filming the two scenes. Scene Saturday 17th November 15 involves possible stop Start at 1:00PM motion, we will film this as well as taking pictures on a camera, incase the stop motion doesn’t work.
  • 2. Editing Schedule Details Date Upload all footage into the project and Monday 19th November collect together all clips. Put the clips in order of the scenes and cut Wednesday 21st November them to a desired length. Refine the footage and add the soundtrack. Friday 23rd November Begin to look closely at the timings and how Tuesday 27th November they synch to the clips. Continue with the timings and synching of Thursday 29th November the clips. Finish synching the clips and timings of the Friday 30th November music. Edit in the transitions between clips and add Tuesday 4th December desired effects to the video. Finish all the editing Thursday 6th December