1. Filming Schedule
Scenes(with respect to Details Date
the storyboard)
Scene 7,11 & 16 Live footage of Billy Lockett- Thursday 1st November
(Leicester-The Donkey) Starts at 8:30PM
Two cameras at different
angles, main focus being the
artist not the audience or
band.
Scene 1,2,6,13,17 & 18 Filming the male character Friday 2nd November
with a guitar down a street to Start at 11:00AM
meet his girlfriend/partner.
This can be cut into these
scenes as oppose to filming
each one separately.
Scenes 3 & 4 Filming in the club/pub. Friday 9th November
Two separate groups, girls and Start at 7:00PM
boys, they meet at the bar.
Long shot of the groups. Close
up of the two main characters.
Scene 5 The two characters walking in Saturday 10th November
a field, holding hands. Close up Start at 12:00PM
of their faces and an extreme
close up of their hands. Mid
shot of them, maybe a wide
shot of the location.
Scene 8,9,10 & 12 The footage of the two Sunday 11th November
characters moving into a Start at 11:00AM
house, and all the scenes that
involves filming in this location.
Scenes 14 & 15 Filming the two scenes. Scene Saturday 17th November
15 involves possible stop Start at 1:00PM
motion, we will film this as well
as taking pictures on a camera,
incase the stop motion doesn’t
work.
2. Editing Schedule
Details Date
Upload all footage into the project and Monday 19th November
collect together all clips.
Put the clips in order of the scenes and cut Wednesday 21st November
them to a desired length.
Refine the footage and add the soundtrack. Friday 23rd November
Begin to look closely at the timings and how Tuesday 27th November
they synch to the clips.
Continue with the timings and synching of Thursday 29th November
the clips.
Finish synching the clips and timings of the Friday 30th November
music.
Edit in the transitions between clips and add Tuesday 4th December
desired effects to the video.
Finish all the editing Thursday 6th December