Fall Real Estate Conference 2013 - Driskell

503 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
503
On SlideShare
0
From Embeds
0
Number of Embeds
139
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Fall Real Estate Conference 2013 - Driskell

  1. 1. City of Boulder 2013 “Breaking Ground” Overview David Driskell Executive Director, Community Planning + Sustainability
  2. 2. A Tale of Two Cities…
  3. 3. A Tale of Two Cities… sensitive infill transformative redevelopment
  4. 4. sensitive infill
  5. 5. 1600 Pearl 18,600 SF third story addition above existing building Ground floor retail / restaurant space Final construction phase
  6. 6. 1738 Pearl 3-story addition in existing parking lot 42,000 SF commercial, with ground floor retail / restaurant Approved by planning board / subject to call-up
  7. 7. 1301 Walnut 60,170 SF commercial Ground floor retail, with offices above and below (daylighted) By-right development / in review
  8. 8. 1707 Walnut Apartments Three-story infill redevelopment of former 7-11 26 rental apartments / below-grade parking Approved / in tech doc
  9. 9. 901 Pearl 21,000 SF commercial, with ground floor restaurant Four condominiums above Approved / in tech doc
  10. 10. 909 Walnut 18,400 SF commercial Ground floor restaurant, with offices above In site review
  11. 11. 11th and Pearl
  12. 12. 11th and Pearl 160,000 SF commercial Ground floor retail, public plaza, rooftop garden/restaurant New downtown cinema, office space, below grade parking Expected construction start early 2014
  13. 13. Downtown RTD Station Improvements Expanded bus service / BRT terminus + 15th Street enhancements + West Pearl streetscape
  14. 14. Civic Area Vision Plan Adopted September 2013
  15. 15. Civic Area Vision Plan Adopted September 2013
  16. 16. “Civic Use Pad” (next to St Julien)
  17. 17. 1750 14th Street 64,400 SF mixed use reuse / redevelopment 8,500 SF commercial / 1,600 SF “micro-office” 43 residential units / 3,800 SF “micro-lofts” In concept review
  18. 18. transformative redevelopment
  19. 19. 3100 Pearl 319 rental apartments (avg size: 800 SF) 396,900 SF total / 5,000 SF ground floor commercial Below grade parking (with parking maximums)
  20. 20. 3100 Pearl Pearl Boulevard RTD Bus Box
  21. 21. Pearl Parkway, Junction Place + Goose Creek Bridge New “multi-way boulevard” prototype New north-south multi-modal connection / Goose Creek crossing Shared street design on Junction Place New multi-use path connections, 30th to Foothills
  22. 22. Pearl Parkway, Junction Place + Goose Creek Bridge
  23. 23. Depot Square Below grade RTD bus facility Restored/repurposed historic depot with public plaza Shared street design connecting to new pocket park
  24. 24. Depot Square 150-room Hyatt Hotel 71 permanently affordable apartments 120,000 SF shared parking structure (wrapped by housing)
  25. 25. Depot Square
  26. 26. Steelyards Lofts 17 attached units First new residential in Boulder Junction north of Goose Creek Site review approved
  27. 27. Pearl Place (30th and Pearl) 120-room hotel / 200,000 SF office / 6,000 SF retail New multi-use path connection / daylighted creek / public space Completed concept review
  28. 28. 800 & 970 28th Street 800 28th St. -- 100 four-bedroom units / Fitness center and office 970 28th St. -- 150 one- and two-bedroom units / small retail
  29. 29. 28th and Canyon / Eads-Golden Buff Site Two hotels + 38,400 SF office building 360 hotel rooms total / below grade parking Ground floor retail / restaurant
  30. 30. 26th and Canyon / Village Shopping Ctr. Residence Inn 171 rooms / 116,000 SF Located in parking area in front of current Marriot Hotel In site review
  31. 31. “Baseline Zero” (Baseline @ 36) 180,000 SF office building / 70,000 SF, 100-key hotel Underground parking / restored riparian corridor Enhanced path connections / leading-edge green building In concept review
  32. 32. Boulder Foothills Hospital Expansion 200,000+ new SF Becoming main hospital facility for Boulder Under construction / completion in 2014
  33. 33. Gunbarrel Town Center Urban mixed use center 251 new housing units / 22,000 SF new retail + office Expected completion in 2015
  34. 34. Alexan Flatirons 12 residential buildings @ end of Spine Road 231 attached rental units, 1500 SF on-site retail + clubhouse Under construction
  35. 35. Avery Brewing Company 94,000 SF brewery operation 5,000 SF on-site restaurant In tech doc
  36. 36. Violet Crossing (Violet @ Broadway) 98 attached for-rent units / 89,350 SF Flood and multi-use path improvements Key property in North Boulder Under construction
  37. 37. 820 Lee Hill 31 single family homes (former County yards site) “Woonerf” street design / shared open space / 10th St. connection Site review approved
  38. 38. 1000 Rosewood 18 new small-lot homes and duplex Street facing with alley access / new street connections Under construction
  39. 39. Washington Village 33 co-housing units + 3000 SF office Restored / reused historic school and pocket park Phased construction; completion in 2016
  40. 40. Trailhead (4th Street) 23 single family homes / mix of sizes Site of former “Junior Academy” Phased development / site development underway
  41. 41. Kalmia Estates 29 single family homes 16 duplex units 14 four-plex units Under construction
  42. 42. Wonderland Creek Townhomes 40 attached townhome units 4 detached “Habitat for Humanity” affordable units Site review approved
  43. 43. City of Boulder 2013 “Breaking Ground” Overview David Driskell Executive Director, Community Planning + Sustainability We partner with our community to create a truly great and sustainable city, worthy of its setting

×