Revised Wasp Overview

1,130 views

Published on

THis is an overview of our facility in Ras Al Khaimah, UAE. Built for the purpose of fully commissioing all downhole completion products.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,130
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Revised Wasp Overview

  1. 1. WASP Oilfield Services Limited Completion Equipment Commissioning and Specialized Storage Services Copyright: WASP Oilfield Services Ltd. ‘Post Drilling and Pre-Production Phase’ Charlie SINCLAIR MD – Business Development “To prevent the unexpected, eliminate the un-inspected”
  2. 2. WASP Oilfield Services Limited Situated in the Ras Al Khaimah Free Trade Zone in RAK, on an 11,000m2 plot of land. ‘State-of-the-Art’ downhole completion equipment commissioning services ‘unique’ within the Middle East region. Inclusive of: Climate-Controlled Storage facilities/warehousing, with an added Copyright: WASP Oilfield Services Ltd. 4000m2 of yard space, is also part of the package . An Assembly Bay Test Tower and Gantry System. Multiple Offices for both Administrative and Warehouse needs.
  3. 3. WASP Oilfield Services Limited The Facility Copyright: WASP Oilfield Services Ltd. Front Yard
  4. 4. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Front Side of Facility
  5. 5. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Back Yard Area 4 x 20T A/Cs for Cold Storage Area
  6. 6. WASP Oilfield Services Limited Warehouse Staff Offices Copyright: WASP Oilfield Services Ltd. Administrative Staff Offices
  7. 7. WASP Oilfield Services Limited Test Bay Area Seen from Material Reception Area Copyright: WASP Oilfield Services Ltd. View of Monorail System above the Reception Area
  8. 8. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Overhead Monorail System
  9. 9. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Cold Storage Area
  10. 10. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Workshop and Tool Re-Dress Area
  11. 11. WASP Oilfield Services Limited End of Monorail at Dispatch Area Snap on/Snap off Bracket System Copyright: WASP Oilfield Services Ltd. Climate Controlled Storage Area
  12. 12. WASP Oilfield Services Limited Dispatch Area Copyright: WASP Oilfield Services Ltd. Fabrication Area
  13. 13. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Fall Arrestor System Tower Gantry
  14. 14. WASP Oilfield Services Limited Copyright: WASP Oilfield Services Ltd. Test Bay Area
  15. 15. WASP Oilfield Services Limited Slickline/Braided Line Drum Copyright: WASP Oilfield Services Ltd. Protective Guard Sub-Assembly and Slickline Hoists Assembly Hoist Line Drum
  16. 16. WASP Oilfield Services Limited Martin Decker 7 5/8” max OD Spinner Copyright: WASP Oilfield Services Ltd. 8.13” max OD Clincher ‘WinCatt’ Transducer ‘WinCatt’ Recorder 25K max ft/lbs – ‘FARR’ Hydraulic Power Tongs
  17. 17. WASP Oilfield Services Limited Adjustable Mousehole Fully Lowered Copyright: WASP Oilfield Services Ltd. Fully Raised
  18. 18. WASP Oilfield Services Limited Under “PSI Testing” Process Secured for safety Copyright: WASP Oilfield Services Ltd. Locked in ‘test’ mode
  19. 19. WASP Oilfield Services Limited Hydrotest Panel and Lift Items X Copyright: WASP Oilfield Services Ltd.
  20. 20. WASP Oilfield Services Limited Electro-Hydraulic Power Unit 2,000gal Hyd. Oil Reservoir Copyright: WASP Oilfield Services Ltd. 25KV Motors Electrical Control Panel Motor psi Gauges
  21. 21. WASP Oilfield Services Limited 1 2 3 4 Set Assembly downhole and rig up test lines. Pick up and move in from Reception Area. Lower in the Wellbore. Set up Adjustable mouse hole. 5 6 7 8 Copyright: WASP Oilfield Services Ltd. Ensure all lines are functioning. Lock Test Plate and secure Lower down on to Handling Assembly downhole. Bogie and move to Lay Down 9 area. After successful pressure test Utilizing the overhead Pulley pull out of Wellbore. System, move completed Assembly across and into the Climate Controlled Storage Facility.
  22. 22. WASP Oilfield Services Limited ‘Near’ Future plans: Develop a ‘unique’ electronic component tracking system. Build our own fully fitted machine shop. Copyright: WASP Oilfield Services Ltd. Fabricate our own ‘state-of-the-art’ shipping baskets. Create an R&D workshop for innovative completion design and tools.
  23. 23. WASP Oilfield Services Limited Operator’s completion equipment sent to RAK facility directly Sub-Assembly configuration identified for particular well requirements Pup Joint needs and procurement executed Copyright: WASP Oilfield Services Ltd. Identification of ancillary completion equipment performed and ordered Test Bay services for all psi testing and make-up/stack-up requirements Final documentation, storage, and/or delivery completed in advance of ‘in- field’ requirements
  24. 24. Copyright: WASP Oilfield Services Ltd. WASP Oilfield Services Limited
  25. 25. WASP Oilfield Services Limited In Summary: The ONLY ‘purpose built’ commissioning facility of its kind in the ME. Significantly reduces rig time Copyright: WASP Oilfield Services Ltd. Thereby reducing costly NPT Optimizes the offshore/onshore completion process Enhances HS&E

×