•    Name: Arc. A. Aliyu Osezay (CEO Ceezali Ltd, Abuja-Nigeria)•    Project: Masaka-Mpape, Abuja Road (and Adjoining Dist...
Summary:•  The proposed Masaka-Mpape, Abuja Ring Road is to serve as a   connecting route from Masaka in Nasarawa State vi...
road	  	  layout	  
Objective:•   To decongest Abuja-Keffi Road which is causing a colossal loss of lives    as a result of incessant traffic ...
•    The high density of the population along Abuja-Keffi road axis contributes     significantly to the chaotic traffic s...
•    The construction of the proposed Masaka-Mpape Ring Road will achieve     the following.      1. Provide an alternativ...
district	  layout	  
Name of Project:•   MASAKA-MPAPE, ABUJA RING ROAD(and Adjoining Districts)Location:•   The Road starts from Masaka, Nasara...
satellite	  map	  
Project Implementation:•    The Federal Government of Nigeria is responsible for the Implementation    of the Project.Tota...
If you have questions, comments or suggestion, please don’t                       hesitate to contact:                    ...
Ceezali
Ceezali
Upcoming SlideShare
Loading in …5
×

Ceezali

1,410 views

Published on

Published in: Business, Economy & Finance
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,410
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
18
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ceezali

  1. 1. PRESENTED BY :ARC. A. A. OSEZAY (M.D) CEEZALI
  2. 2. •  Name: Arc. A. Aliyu Osezay (CEO Ceezali Ltd, Abuja-Nigeria)•  Project: Masaka-Mpape, Abuja Road (and Adjoining Districts)•  PROJECT NEEDS: Equipment: Dozers, Graders, Loaders, Batching Plant, Asphalt Plant and Pavers. Financing: Ceezali Ltd, First Bank Plc, FCT, and Investors. Partners: Ceezali Ltd, First Bank Plc and FCT.
  3. 3. Summary:•  The proposed Masaka-Mpape, Abuja Ring Road is to serve as a connecting route from Masaka in Nasarawa State via Mpape to Abuja. The total length of the road is approximately 26 km; and the duration of the road project is 2 years. d   c   b a
  4. 4. road    layout  
  5. 5. Objective:•  To decongest Abuja-Keffi Road which is causing a colossal loss of lives as a result of incessant traffic accidents; loss of man-hour in productivity; and stress, arising from locked-up traffic. The traffic logjam on this road deteriorates during the morning and evening rush hours.
  6. 6. •  The high density of the population along Abuja-Keffi road axis contributes significantly to the chaotic traffic situation.
  7. 7. •  The construction of the proposed Masaka-Mpape Ring Road will achieve the following. 1. Provide an alternative route for commuters and travelers. 2. Minimize security threats posed by the over-flow of heavy traffic around the Three Arms Zone, where the seat of government is located 3. Open up vast area for the development of additional Districts.
  8. 8. district  layout  
  9. 9. Name of Project:•  MASAKA-MPAPE, ABUJA RING ROAD(and Adjoining Districts)Location:•  The Road starts from Masaka, Nasarawa State via Mpape to Abuja, FCT d   a   a
  10. 10. satellite  map  
  11. 11. Project Implementation:•  The Federal Government of Nigeria is responsible for the Implementation of the Project.Total Project Cost:•  N24Billion ($150Million)Project Structure:•  DBT(Design Build and Transfer)Economic Benefit:•  The project will generate 500 employment during the construction period•  Open up new Districts to attract investors•  Generate more revenue to the Federal Capital Territory of Nigeria
  12. 12. If you have questions, comments or suggestion, please don’t hesitate to contact: Ceezali Limited, No 24, Thabatsaka, By Britsh Village, Wuse II, Abuja FCT, Nigeria Tel: +2348033325553, +2348078756968 www.ceezali.com ceo@ceezali.com

×