Bourne elementary and ecc timeline v2

  1. 1. The Story of the Bournedale Elementary School MSBA partnered with Bourne and design team=$13M savings
  2. 2. Pre-MSBA: Building Plan & Oversight of Design Development at Local Level <ul><li>Bourne wanted to replace the Hoxie School (100 years old) & the Otis Memorial School (55 year old building located on Otis AFB) </li></ul><ul><li>“ Cape Villages” concept to reflect Cape Cod municipalities (Town of Barnstable=Hyannis, Osterville, Centerville, etc.) </li></ul><ul><li>Single story “houses” connected by long hallways </li></ul><ul><li>Segregate Pre-K/K/Grades 1-5 </li></ul><ul><li>Move 5 th grade into new elementary, out of new middle school </li></ul><ul><li>946 kids: Make building larger than current enrollment just in case of Otis AFB disposition </li></ul><ul><li>Siting: required a $4M MassHighway project for access </li></ul>
  3. 3. Bourne Original Design: “Cape Villages” Concept
  4. 4. Bourne Elementary & ECC: 2003 Scope and Budget <ul><li>Expanded for full day K (not previously offered, half day K for past 40 years) </li></ul><ul><li>Area: 135,000 sf </li></ul><ul><li>Budget: $26,850,000 </li></ul><ul><li>Debt Exclusion passed for $26.8 M in 2003 </li></ul>
  5. 5. Bourne Original “Cape Villages” Concept
  6. 6. <ul><li>Preliminary Estimate >>$30+ Million </li></ul><ul><li>District proposed change to MSBA Guidelines: </li></ul><ul><ul><li>Pre-K and K classroom sf = 1,100 (vs. 1,200 sf) </li></ul></ul><ul><ul><li>Classroom sf = 820 (vs. 900 sf) </li></ul></ul><ul><ul><li>Gym = 4,800 (vs. 6,000 sf) </li></ul></ul><ul><li>Area = 115,785 sf (down from 135,000 sf) </li></ul><ul><li>Maintained a smaller version of “Cape Villages” concept </li></ul><ul><li>However, total cost (bids): $40.1 Million </li></ul><ul><li>2 nd override vote failed and bids were rejected </li></ul>Revise the Dream: 2005 Cost Estimate
  7. 7. Bourne Revised “Cape Villages” Concept
  8. 8. <ul><li>Building reconfigured to traditional 2-story building with interior courtyard and double-loaded corridors </li></ul><ul><li>pK – 4 (with ½ day K). Kept 5 th grade in Middle School </li></ul><ul><li>Revised enrollment projections to 584 students (pk-4) </li></ul><ul><li>Area: 66,000 sf </li></ul><ul><li>Room and infrastructure for potential future expansion </li></ul><ul><li>Creative interior design maintains “village” concept </li></ul><ul><li>Estimate: $26.8 Million </li></ul><ul><li>Bids: $25.5 Million </li></ul><ul><li>Maintained master plan goal of replacing Hoxie and Otis Memorial Schools </li></ul>First plan fails at ballot box…2006 redesign
  9. 9. Bourne Redesigned Building: 2-story building with interior courtyard Potential Future Expansion Potential Future Expansion
  10. 10. Bourne Redesigned Building: Upper Level
  11. 11. Bourne Redesigned Building: Traditional 2-story building with interior courtyard Main Façade
  12. 12. Bourne Redesigned Building: Gymnasium: colors and shapes delineate gym classroom groupings
  13. 13. Bourne Redesigned Building: Cafetorium Entrance: Music Room is on Cafetorium Stage, separated by flexible wall
  14. 14. Bourne Redesigned Building: Use of Color for Way-finding

×