CASE bim forum 2011 final

7,615 views

Published on

Published in: Technology, Business
0 Comments
15 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
7,615
On SlideShare
0
From Embeds
0
Number of Embeds
537
Actions
Shares
0
Downloads
0
Comments
0
Likes
15
Embeds 0
No embeds

No notes for slide
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • Add image of false joint and rubber embed
  • CASE bim forum 2011 final

    1. 1. Lessons in Digital Collaboration<br />Building The Louisiana Sports Hall of Fame<br />Federico Negro // www.case-inc.com // 19 July 2011<br />
    2. 2. Project Background<br />Image courtesy Trahan Architects<br /><ul><li> Client: State of Louisiana
    3. 3. Location: Natchitoches, Louisiana
    4. 4. Use:
    5. 5. Museum
    6. 6. Sports Hall of Fame
    7. 7. Size: 22,000 sf
    8. 8. Complexity:
    9. 9. A cast stone (concrete) internal skin made up of more than 1000 unique panels ranging from 2’ x 4’ to more than 16’ x 16’ in size</li></li></ul><li>Project Background<br />Image courtesy Trahan Architects<br /><ul><li> Contract Structure:
    10. 10. Design Bid Build
    11. 11. Skin Component:
    12. 12. Performance specification
    13. 13. BIM Requirement:
    14. 14. BIM required, but no architectural model was officially provided
    15. 15. Model of skin was provided in Rhino .3dm format
    16. 16. Structural Revit model provided</li></li></ul><li>Project Background - Design<br />
    17. 17. Architect’s Specifications – BIM Requirement<br />
    18. 18. Architect’s Specifications – File Formats<br />
    19. 19. Project Structure – Construction Phase<br />
    20. 20. Project Structure – CASE Involvement<br />
    21. 21. Project Structure – Fabrication Modeling<br />
    22. 22. Submittals – Sub-division Surface<br />
    23. 23. Submittals – Digital Notes<br />
    24. 24. Rationalization – Starting Point<br />
    25. 25. Rationalization – Break Up Form<br />
    26. 26. Rationalization – Break Up Form<br />
    27. 27. Rationalization – Break Up Form<br />
    28. 28. Rationalization – Break Up Form<br />
    29. 29. Rationalization – Break Up Form<br />
    30. 30. Rationalization – Analyze Given Surface<br />
    31. 31. Rationalization – Patch Lacerations<br />
    32. 32. Rationalization – Healed Surface<br />
    33. 33. Rationalization – Apply Joint Pattern<br />
    34. 34. Rationalization – Offset Pattern <br />
    35. 35. Rationalization – Panelize<br />
    36. 36. Rationalization – Panelize<br />
    37. 37. Rationalization – Panelize <br />
    38. 38. Rationalization – Surface Normals<br />
    39. 39. Rationalization – Geometric Failures<br />
    40. 40. Rationalization – Rationalized Back<br />
    41. 41. Rationalization – Closed Poly-Surface<br />
    42. 42. Rationalization – Actual Solid Panel<br />
    43. 43. Rationalization – Create Assembly<br />
    44. 44. Codification – Organize into Regions<br />
    45. 45. Rationalization – Panelize<br />
    46. 46. Coordinate – Analyze Clashes with Structure<br />
    47. 47. Coordinate – Analyze Panel Support Steel<br />
    48. 48. Coordinate – Panel Clearance Testing (QA)<br />
    49. 49. Codification – Panel Key<br />
    50. 50. Joining Panels – Too Small for Fabrication<br />
    51. 51. Coordinate – Integrate with Building Structure<br />
    52. 52. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    53. 53. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    54. 54. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    55. 55. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    56. 56. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    57. 57. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    58. 58. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    59. 59. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    60. 60. Design – Connection & Support Steel<br />Image courtesy METHOD Design<br />
    61. 61. Design – Connection & Support Steel<br />
    62. 62. Codification – Installation Sequencing<br />
    63. 63. Shop Ticket - Automation<br />
    64. 64. Shop Ticket - Automation<br />
    65. 65. Shop Ticket - Automation<br />
    66. 66. Shop Ticket - Automation<br />
    67. 67. Shop Ticket - Automation<br />
    68. 68. Panel Documentation – Connection Schedule<br />
    69. 69. Shop Ticket – Final Documentation<br />
    70. 70. Steel Documentation – Shop Drawings<br />
    71. 71. Fabrication – Milling Test Forms<br />
    72. 72. Fabrication – Half Molds Arrive at Shop<br />
    73. 73. Fabrication – Mold Preparation<br />
    74. 74. Fabrication – Final Two-Part Mold<br />
    75. 75. Fabrication – Dry Patch & Tamping<br />
    76. 76. Fabrication – Finish Mock Up<br />
    77. 77. Mock Up – False Joint & Curvature<br />
    78. 78. Other Trades – BIM Development<br />
    79. 79. Other Trades – Electrical Finish Integration<br />
    80. 80. Other Trades – HVAC Integration<br />
    81. 81. Other Trades – FP Integration<br />
    82. 82. Query Model for Other Benefits - Sequencing<br />Cubic footage by region and by panel allows the CM and installer to plan a sequence of construction based on actual panel weights<br />
    83. 83. BIM Model – Coordination Protocols<br />
    84. 84. Trade Coordination – Panel vs. Steel<br />
    85. 85. Trade Coordination – FP Routing<br />
    86. 86. Trade Coordination – HVAC Routing<br />
    87. 87. BIM Model – Web-Based Issue Tracking<br />
    88. 88. BIM Model – Top View<br />
    89. 89. BIM Model – Front View<br />
    90. 90. BIM Model – Field Verification & Install<br />
    91. 91. BIM Model – Field Verification & Install<br />
    92. 92. Thank You.<br />www.case-inc.com<br />info@case-inc.com<br />212-255-5483<br />Image courtesy Trahan Architects<br />

    ×