  1. 1. ARCE PROJECT IES Alpujarra
  2. 2. INDEX Presentation of IES ALPUJARRA. Energy expenditure expressed economically.  Electricity.  Paper.  Fuels. Mistakes and other possible alternatives in our high school.
  3. 3. IES ALPUJARRA Soto Carmona’s build
  4. 4. Energy expensure
  5. 5. Electricity12001000 1st month 800 2nd 600 month 3rd 400 month 200 4th month 0 1st 3rd term term
  6. 6. Paper140012001000800 Paper, envelopes etc600400200 0 S O N D J F M A M J
  7. 7. Fuels3000250020001500 Boiler1000500 0 September January - - January September
  8. 8. Energy mistakes Poor insulation of windows. Poor condition of the radiators and the heating. Poor condition of wiring and light of classrooms. Waste of light energy. Loss of electricity due to the computers which are broken.
  9. 9. Alternatives of mistakes Poor insulation of windows 1. Old windows are not usually adjusted and subsequently the heat loss. 2. New windows will protect the heat.
  10. 10.  Poor conditions of the radiators and theheating. 1. New radiators consume less energy than old radiators. 2. Another option is other ways of heating as for example air conditioning.
  11. 11.  Poor conditions of lighting and light of classrooms. The poor conditions of lighting apart from being dangerous, causes electricity is not properly driven.
  12. 12.  Waste of light energy. Instaling a window over a door would increase light quality.
  13. 13.  Loss of electricity due to the computers which are broken. 1. Computers which are damged are consuming energy although they are not working. 2. New and modern computers consume less energy.
  14. 14. A point positiveOur corridor is very bright. It have numerous windows on the roof.
  15. 15. Our project We think the roof is a large surface and it is not properly used. We could install solar panels on it, since our high school has a great location to take advantage of sun. We could isntall 470 solar panels on the roof, these panels would reduce our spending an average of 75%.
  16. 16. By:  David Díez Fernández  Alfredo Jaraba Vigil  Pablo Carmona Sánchez Fº Javier Pérez Rodríguez

×