  1. 1. MARINE FACADE RESIDENTIAL PROJECT www.rencons.com
  2. 2. EXECUTIVE SUMMARY Strategic project on Vasilievsky Island, initiated by the St. Petersburg Government in 2006 Reclamation area - 476 hectares of the Gulf of Finland It is historically formed as a prestigious place for living due to its specific privacy and well-developed infrastructure, numerous parks and breathtaking panoramic views. Renaissance Holding is going to construct here the new residential waterfront community offering a unique lifestyle with both urban infrastructure providing a vibrant hub of all the amenities, and sea- side promenade for relaxing way of life. RenaissanceConstruction_EXECUTIVESUMMERY Gross Building Area m2 - 818 032 Gross Apartment Area m2 - 572 621 Commercial premises m2 – 38 297 Total number of parking places 5 010 MARINE FACADE RESIDENTIAL PROJECT O1
  3. 3. PROJECT ACCESSIBILITY www.rencons.com 02
  4. 4. PROJECT ACCESSIBILITY PUBLIC TRANSPORTATION • Vasileostrovskaya metro station 5 km • Primorskaya metro station 3 km • Sportivnaya metro station 5.5 km • Marine Facade (2018) metro station 1 km • Shkiperskaya (2018) metro station 2.5 km • Bolshoy Prospect (2018) metro station 4.5 km • Pulkovo International Airport (LED) 30 km • New Sea Passenger Terminal 1.5 km Major TrafFIc Channels: • WSHD 1 km • Tuchkov Bridge 5.5 km • Birzhevoy Bridge 6.5 km • Dvortsovy Bridge 10 km • Blagoveshenskiy Bridge 7 km • Serny Island Bridge (proposed) 5 km • Novo-Admiralteiskiy Bridge (proposed) 5.5 km RenaissanceConstruction_PROJECTACCESSIBILITY MARINE FACADE RESIDENTIAL PROJECT O2
  5. 5. Primorskaya Sportivnaya 2 Shkiperskaya Vasileostrovskaya Bolshoy prospect 1-2 WHSD NORTHERN PART WHSD CENTRAL PART WHSD SOUTHERN PART MARINE FACADE Serny Island Bridge Novoadmiralteysky Bridge airPORT SEA PORT city center SEA PORT MARINE FACADE RESIDENTIAL PROJECT O2 MARINE FACADE city center St. Petersburg the Gulf of Finland AIRPORT Vasilievsky Island RenaissanceConstruction_PROJECTACCESSIBILITY 20 min
  6. 6. MARINE FACADE RESIDENTIAL PROJECT O2 Kyrortny Primorsky Kirovsky Krasnoselsky Frunzensky Moskovsky Pulkovo airport 90-120 60-90 50-60 60-90 60-90 50-60 90-120 30-40 5-10 5-10 15-20 30-40 10-15 15-20 Estimated Drive Time after WHSD Completion District Current drive time, min WHSD drive time,min RenaissanceConstruction_PROJECTACCESSIBILITY The WHSD completion (2016) will bring the following effect: Transport connection between the north-western, the cen- tral and southern regions of the city. Solution for temporary transport isolation of Vasilievsky Is- land from other regions of St. Petersburg. Guarantee of transport accessibility. WHSD Project. Central Part
  7. 7. RECLAMATION www.rencons.com 03
  8. 8. Reclamation RenaissanceConstruction_RECLAMATION MARINE FACADE RESIDENTIAL PROJECT O3 The New Lands In 2013 Renaissance joined The Marine Façade project of additional expansion of St. Petersburg by reclaiming new territories in the Gulf of Finland. The masterplan was developed jointly with the leading Russian, European and USA experts. Renaissance will reclaim four plots with total area of 87+ ha that will accommodate new residential communities. The project in- cludes construction of engineering infrastructure, social facilities and roads. Talus defence wall Coastal defence options
  9. 9. MARINE FACADE. AERIAL VIEW [SOUTH] MARINE FACADE RESIDENTIAL PROJECT O3 RenaissanceConstruction_RECLAMATION
  10. 10. MARINE FACADE. AERIAL VIEW [NORTH] MARINE FACADE RESIDENTIAL PROJECT O3 RenaissanceConstruction_RECLAMATION
  11. 11. SITE PARAMETERS www.rencons.com 04
  12. 12. SITE PARAMETERS MARINE FACADE RESIDENTIAL PROJECT O4 10 11 12 13 Plot Total plot area sq.m. Facilities area (school and kindergar- ten) Dwelling area sq.m. Footprint sq.m. GBA sq.m. GAA sq.m. Parking GBA sq.m. Qty of parking spaces 96694 14400 82294 12216 332367 189276 57966 1656 105914 34100 71814 12650 300066 165172 50584 1445 78034 24300 53734 12470 225871 123588 37849 1081 53924 12800 41124 9300 173388 94585 28967 828 COAST LINE 1740 m 10 11 12 PLOT PARK ZONE 11 HA 13
  13. 13. Plot 12 Initial Data www.rencons.com 05 12 PLOT 6.1.Meteorological Input & Geolocation 6.2.City Planning Requirements 6.3.Engineering infRastructure
  14. 14. MARINE FACADE RESIDENTIAL PROJECT O5 PLOT 12 INITIAL DATA 5.1.Meteorological Input & Geolocation Daylight The St. Petersburg Marine project is a 48 building mixed use devel- opment spread over 1.5 square kilometers on the shore of the Baltic Sea. RWDI was retained to provide microclimate consulting services related to snow drifting and also the availability of daylight at the building facades. This report focusses solely on the results of the daylight availability analysis. The site is directly exposed to the Baltic Sea to the west and south. A harbour is located to the north of the development, and low- and mid-rise residential buildings prevail to the east. Wind Summer Winds (May – October) Winter Winds (November – April) Wind Speed Probability (%) (km/h) Summer Winter Calm 7.5 4.5 1-10 36.2 28.3 11-20 39.6 40.7 21-30 14.3 21.3 31-40 2.1 4.5 >40 0.2 0.8 RenaissanceConstruction_PLOT12
  15. 15. MARINE FACADE RESIDENTIAL PROJECT O5 5.2.City Planning Requirements Building height restrictions 75m 57m 48m 5.3.Engineering infastructure Engineering network requirements plot utilities unit quantity 10 heat supply water supply wastewater disposal electricity supply Gcal/hr m3/d m3/d kW 16.6 2109.97 2090.71 5561,49 iv q 2025 11 heat supply water supply wastewater disposal electricity supply Gcal/hr m3/d m3/d kW 18.4 2451.19 2432.7 6105.27 iv q 2021 heat supply water supply wastewater disposal electricity supply Gcal/hr m3/d m3/d kW 14.3 1684.68 1666.42 4547.95 iv q 201912 heat supply water supply wastewater disposal electricity supply 13 Gcal/hr m3/d m3/d kW 8.7 871.87 863.82 3007.36 iv q 2025 RenaissanceConstruction_PLOT12
  16. 16. MARKET ANALISYS www.rencons.com 06 6.1. ST.PETERsBURG market 6.2. Vasilievsky district MARKET
  17. 17. Supply trends on primary housing market in St. Petersburg by class from 2012-2015, % ST.PETERsBURGRealEstateMarketAnalysisO6 45.1 35.3 6.113.5 2012 2015*20142013 42.1 37.5 15.0 5.5 40.4 6.2 38.6 14.9 42.9 7.216.0 33.9 SUPPLY Demand trends on primary housing market in St. Petersburg by class from 2012-2015, % DEMAND 2012 2013 54.536.5 2.7 6.3 43.445.5 3.47.7 47.042.1 3.37.6 43.245.3 2.68.9 2014 2015* Econom class Comfort class Business class Elite class *projection based on Q1-Q3 2015 figures
  18. 18. Residential projects located on Vasilievsky ISLAND 2 1 45 Econom class Comfort class Business class Elite class 3 6 7 8 9 12 13 14 10 Location chart of the properties for sale and mid-range projects on Vasilievsky Island Docklands Baltiisky monolit Towers of Bering Piter Construction Vasilievsky quarter FSBEU HPE «National mineral recourse University Gorny» Marine Rhapsody Rant «I am a romantic» Seven Suns Development Captain Nemo Leader Group Preobragensky Gart Samotsvety LenSpecSmuAino Lemminkainen Rus Fjord YIT Malyi prospect Vasilievsky Island, 60 Variant 11 The Residence Setl City Granville Solo 24 29 Dalpiterstroy V.D.RealEstateMarketAnalysisO6 RenaissanceConstruction_MARKETANALYSIS
  19. 19. SWOT 08 www.rencons.com
  20. 20. Strengths and Weaknesses of the Project MARINE FACADE RESIDENTIAL PROJECT O8 GREEN LIVING METRO&WHSD CITY CENTER FRONT LINE Strengths
  21. 21. Project concept 1 09 9.1. 3D visualisation 9.2. Masterplan 9.3. FUNCTIONAL ZONING 9.4. Floor plans 9.5. Parking scheme 9.6. Commercial properties 9.7. Facades and sections 9.8. Facilities for residents 9.9. SMART TECHNOLOGIES
  22. 22. MARINE FACADE. PROJECT VIEW MARINE FACADE RESIDENTIAL PROJECT 9.1
  23. 23. MARINE FACADE RESIDENTIAL PROJECT 9.1
  24. 24. MARINE FACADE RESIDENTIAL PROJECT 9.2 RenaissanceConstruction_PROJECTCONCEPT 9 5 3 7 7 2 7 7 2 8 5 7 3 7 1 1 2 6 1 1 2 8 7 3 7 2 5 29 7 3 5 47 MASTER PLAN Iconic Towers Residential Towers (Business Class) Residential Towers (Comfort Plus) Residential Towers (Comfort Class) Educational Facilities Central Axis Garden Duplex Retail Podium Waterfront Promenade City Park 3 6 4 1 9 8 5 7 10 2
  25. 25. MARINE FACADE RESIDENTIAL PROJECT 9.8 FACILITIES FOR RESIDENTS Competitive Advantage Development FOLD HOME Systems • Recreational facilities offering a fully personalized space • Individual pass cards are used to access FOLDHOME units • Using the use-pay system, residents may use their areas as they would their own private space PRIVATE CINEMA EVENT ROOM MUSIC ROOM PLAYGROUND
  26. 26. MARINE FACADE RESIDENTIAL PROJECT 9.9 SMART TECHNOLOGIES Membership FEE : 5000 Rub. Electric and water : 15 000 Rub. PAYMENT HISTORY For rent For sale PET DOCTORDOCTOR LIGHT ON CALL COMFORT & CONVENIENCE SAFETY & SECURITY SMART ECONOMY ENTERTAINMENT COMFORT & CONVENIENCE • Personalized climate settings • Place a service or assistance request • Order food delivery SAFETY & SECURITY • Check the status of home locks • Grant or remove access to the house • Receive alerts when leak is detected • Monitor the state of your home SMART ECONOMY • Manage lights from your device • Automate your lighting to respond to your schedule • Raise or dim any light with a single touch ENTERTAINMENT • Control of all of your entertainment gear • Personalized audio and video settings • Book facilities for residents RenaissanceConstruction_PROJECTCONCEPT
  27. 27. PR-MARKETING STRATEGY 12 12.1. CONSUMERS PSYCHOTYPES 12.2. BRAND CONCEPTION
  28. 28. MARINE FACADE RESIDENTIAL PROJECT 12.1 CONSUMERS PSYCOTYPES In the Terms of Customer Values CONSERVATIVE TRENDS SETTERS TREND FOLLOWERS tradition habit originality enjoyment prestige fashion intellectuals average man independent hedonists careerists copiers
  29. 29. MARINE FACADE RESIDENTIAL PROJECT 12.2 BRAND CONCEPTION BRAND PROCESS PHASING focus groups on-line benchmarketing 1 RESEARCH brand positioning brand stamp 2 CONSULTING 3 branding name sloganbrand idea logo design corporate identity testing 4 DESIGN 5 PROMOTION communication strategy the main project phases that will determine next phases
  30. 30. THANK YOU FOR YOUR ATTENTION www.rencons.com

×