Successfully reported this slideshow.
Real	
  Time	
  Trend	
  &	
  Failure	
  
Analysis	
  using	
  
Test	
  Trend	
  Analyzer	
  (TTA)	
  
Anand	
  Bagmar	
  ...
Reality	
  in	
  Organiza.ons	
  
Product	
  1	
  

Product	
  3	
  

Product	
  2	
  

Product	
  4	
  
Test	
  Trend	
  Analyzer	
  	
  
(TTA)	
  
TTA	
  –	
  Test	
  Trend	
  Analyzer	
  -­‐	
  Vision	
  
•  A	
  single	
  point,	
  visual	
  solu0on	
  to	
  gauge	
 ...
Collect	
  Test	
  Run	
  data	
  in	
  TTA	
  
•  Automa.c	
  Upload	
  
•  Manual	
  Upload	
  
CI	
  Integra.on	
  

Test	
  Framework	
  

Job(s)	
  Triggered	
  
CI	
  job	
  triggered	
  	
  

Build	
  Tool	
  
	
  

	
  
Test	
  Command	
  	
  
	
  
	
  
Clean	
  /	
  Compile	
  /	...
CI	
  job	
  triggered	
  	
  

Build	
  Tool	
  
Ant	
  /	
  Maven	
  /	
  Gradle	
  /	
  
Test	
  Command	
  	
  
	
  Ma...
For	
  Different	
  Sub	
  –	
  Projects	
  	
  
Tests	
  Summary	
  
%	
  of	
  Tests	
  Passed	
  

%	
  of	
  Tests	
  F...
Test	
  Status	
  for	
  a	
  Single	
  Project	
  
Project-­‐ABC	
  

10%	
  

2%	
  

%	
  of	
  tests	
  passed	
  
%	
...
For	
  Tech-­‐Ops	
  /	
  IT	
  
Machine	
  U0liza0on	
  for	
  Test	
  Execu0on	
  

No.	
  of	
  hours	
  

12	
  
10	
 ...
How	
  to	
  use	
  TTA	
  
•  Copyright	
  2013	
  ThoughtWorks,	
  Inc.	
  	
  
•  Distributed	
  under	
  the	
  Apache...
•  Contact:	
  
–  Send	
  an	
  email	
  to	
  da@thoughtworks.com	
  
–  @BagmarAnand	
  
Copyright	
  2013	
  ThoughtWo...
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh
Upcoming SlideShare
Loading in …5
×

Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh

683 views

Published on

Published in: Technology
  • Be the first to like this

Real time trend and failure analysis using TTA-Anand Bagmar & Aasawaree Deshmukh

  1. 1. Real  Time  Trend  &  Failure   Analysis  using   Test  Trend  Analyzer  (TTA)   Anand  Bagmar   Aasawaree  Deshmukh  
  2. 2. Reality  in  Organiza.ons  
  3. 3. Product  1   Product  3   Product  2   Product  4  
  4. 4. Test  Trend  Analyzer     (TTA)  
  5. 5. TTA  –  Test  Trend  Analyzer  -­‐  Vision   •  A  single  point,  visual  solu0on  to  gauge  the  health  of  your  product  por:olio   using  Test  Automa.on  results    by  means  of  –   –  Compara.ve  views     –  Trends  analysis   –  Failure  analysis   •  and  providing   –  Drill-­‐down  reports   –  Customizable  reports   •  So  that     –  Different  stakeholders  can  get  single  click  view  of  the  health  status  and  poten.al   issues   –  A  project  team  can  decide  if  automa.on  is  useful  or  not.   –   automated  data  colla.on  and  trending  to  avoid  manual  data  aggrega.on  and   interpreta.on   •  With  the  stakeholders  being   –  –  –  –  Developers   QA   QA  Leads  /  Manager  /  Directors   Tech-­‐Ops  
  6. 6. Collect  Test  Run  data  in  TTA   •  Automa.c  Upload   •  Manual  Upload  
  7. 7. CI  Integra.on   Test  Framework   Job(s)  Triggered  
  8. 8. CI  job  triggered     Build  Tool       Test  Command         Clean  /  Compile  /  Setup       Run  Tests         Return  to  CI      
  9. 9. CI  job  triggered     Build  Tool   Ant  /  Maven  /  Gradle  /   Test  Command      Make  /  Rake  …     Clean  /  Compile  /  Setup     xUnit  /  testNG  /  …   Run  Tests     Java  /  C#  /  Perl  /  Python  /  Ruby  …     Send  results  to  TTA     Return  to  CI   GO  /  Hudson  /  Jenkins  /  Bamboo  /  ..    
  10. 10. For  Different  Sub  –  Projects     Tests  Summary   %  of  Tests  Passed   %  of  Tests  Failed   %  of  Errors   90   89   74   67   10   3   Project  1   12   5   Project  2   8   4   Project  3   2   8   Project  4  
  11. 11. Test  Status  for  a  Single  Project   Project-­‐ABC   10%   2%   %  of  tests  passed   %  of  tests  failed   88%   %  of  tests  not   completed  
  12. 12. For  Tech-­‐Ops  /  IT   Machine  U0liza0on  for  Test  Execu0on   No.  of  hours   12   10   8   6   4   2   0   Project  1   Project  2   Project  3   Machine  1   10   4   2   Machine  2   12   8   4   Machine  3   6   0   9   Machine  4   7   9   5  
  13. 13. How  to  use  TTA   •  Copyright  2013  ThoughtWorks,  Inc.     •  Distributed  under  the  Apache  2.0  License   •  Available  on  github  at:     –  hdps://github.com/anandbagmar/da   •  Instruc.ons  available  on  github  wiki  at:   –  hdps://github.com/anandbagmar/da/wiki    
  14. 14. •  Contact:   –  Send  an  email  to  da@thoughtworks.com   –  @BagmarAnand   Copyright  2013  ThoughtWorks,  Inc.   Apache  2.0  License  

×