Challenges in rig moving by captain zarir irani

1,318 views

Published on

Challenges in rig moving by captain zarir irani independent rig movers in dubai

Published in: Services
  • Be the first to comment

Challenges in rig moving by captain zarir irani

  1. 1. Challenges in rig towing operations Nllrnuxwrx Ann nmmm m mmm. _ Captain Zarir Irani. NAMS-CMS. FIIMS. FICS. AFNI. MBA. HCMM _ vwvw. conste| |atIonms. com 1;: WWW-'““'i"°5"“’°Y°"'""3‘-°°'" Constellation, Dubai onice: +911 4 4232334 HP - +971 so 3979 103 wvvw. offshoremarineservices. net
  2. 2. Details of Recent incidents INDLFLNDENCE AND mrmucr IN SUlV['lNG Year MODU Location Details 2000 R&B Falcon Wetnam Towline break from 3days near tropical storm KAIME from Singapore Roger Morwel Brazil to Ruby field no permission to seek sheber-POB 4U executed-flooded LQ and preload tank. Nabers Dolphen 11.1 S. Africa Damage to demuck during tow from GCM to Brazil. 2001 Work for S. Africa jacking system and leg guide heavy weather damage on dry from N5 to Singapore on GIANT 3- seafor3 B tie bars on leg 3 fractures so leg resting on GAlNT3. Noble India Lost substructure and derrick in bad weather-Ztowline break. grounded. Jemmy Puckez GSF key Med Lost 2 towlines-heavy weather damage-2 months repairs. Singapore. 2002 Jagson lntl India Zlegmat connections failed under tow in bad weather with mat down-jack system failed. Deepsea Madrill 2005 GPS Dubai S. Africa Lost 3 legs after rounding Cape in dry tow. Odn Liberty 2007 Nabors Dolphin GoM Sinking under tow grounded in shallow water. 111 2006 Premium Deep Singapore Tug electrical blackout Singapore Strats and full astern on pon engine into sg-damaged nell-duck Driller S TEMPS and large host above M Ks team-1 Atlantic HLV Antora loss propulsion broached rail motion, rig lost . over turned By Zarir lrani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM. Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103 Damage Major Major Severe Major Severe Severe Severe Severe Severe. Total loss.
  3. 3. of‘ “An N‘ Z. ('5 ’f @ lv4w= x7:«1AM>llrli}*4.i. mIv<: . co~; , 47 . -9 Name Mr. Gu|1 Penrod52/Petrel Sea Geam Roger Buttin 3 dresser 2 Estrebila Weather Triton2 in sea Oboliyn Field 83 Sigfool 2 underwater—CTL Kayas 302 Year Details of Recent incidents Age Location 2 7 nk nk 1 0 1 12 8 7 Gulf of Mexico Gulf of Mexico North Sea West Africa Gulf of Mexico Gulf of Mexico Gulf of Mexico Indian ocean Gulf of Mexico Gulf of Mexico By Zarir lrani. NAMS-CMS. FIIMS, FICS, AFNI, MBA, HCMM. Constellation, Dubai office +971 4 4232884HP - +971 50 8979 103 Description. Punch through-titled 9 degrees-later capsized in Hurricane Audray Punch-through and capsized moving on then hit by Hurricane Betsy. Jack tie bar broke when jacking down due to brittle fracture. Legs penetrated faster than jacking due to weak clay then capsized/ sank Overturned due to soils failure. Hit sea bed with mat in Hurrycane, the cap sized. One leg broke through 22ft-jacking up-damaged jacking system and chord- crew Stbd leg broke through/ capsized preloading at 4m airgap off Bombay. 2 bow legs broke through while preloading-21 degree list-one corner of null 10ft Bow legs punch—through 2m whilst preloading-legs bent—| isted CTL
  4. 4. Year MODU Location 2007 West larissa Indonesia (sea drill S) Maesk Malaysia Completer Ensco 51 Malaysia Noble caes van Diemon Arabian Gulf Smill Lisa Irish Sea Jack-Up Irish Sea Transocean Malaysia Transocean Suez Santa Fe 124 2008 Transocean Malaysia GSF 136 Rowan W. Africa Gorilla VII Seadrill Bass Strait West Thillion Australia 2009 Vantage Ivory Coast Sapphire Transocean Malaysia Trident Details punch-through al jacket-all 3 legs damaged Port leg puch-through-contact with platform Port leg braces buckle and guide damage-bow leg pinion damage port leg braces buckle-rig repositioned-bow leg brace buckle Scour induced punch«through-Crane driver rescues 29 Rig sudden loss of trim whilst jacking down-crane overboard -one fatabity High RPSs when jacking up on location —| eg braces damaged Stbd leg braces damaged when jacking up at location after RPD problems Major punch-through whilst preloading-rig to 11 degrees-damage damage to all three legs. Punch-through 20ft-heavy connect with platform sudden loss of trim whilst preloading—broke X joints on 2 faces of stbd leg. Punch-through-leg snapped. Port leg damaged at stand«off-all three legs broken By Zarir lrani, NAMS-CMS, FIIMS, FICS, AFNI, MBA , HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103 Details of Recent incidents Damage Severe Major Major Major Major Major Major Major Major Major Severe Major Severe
  5. 5. R&B Ward 1998 Bow leg punch—through in 250ft WD—3|egs dam -‘rm aged approx 6months repairs , . By Zarir lrani, NAMS—CMS, FIIMS, FICS, AFNI, MBA , HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103
  6. 6. Punch-through during preload-bow leg snapped off. gr‘ M ta} Atwood Beacon 2004 L. ’ ‘ ‘x T a@ By Zarir lrani, NAMS-CMS, FIIMS, FICS, AFNI, MBA , HCMM Constellation, Dubai office: +971 4 4232884HP — +971 50 8979 103
  7. 7. A "Punch Through is a generic term often loosely applied to an event where significant vertical footing d‘ placements are observed over a relatively short period of time. During these events differential footing penetrations usually occur which may dramatically effect the stability of the unit. fl sttlement and Punch Yhrou The most common cause of foundation failures of this type are due to the presence of a relatively thin layer of strong soil overlying a softer / weaker soil upon its initial installation a unit may be temporarally supported by the upper soil layer Subsequently, during the preloading process or under storm conditions imposed on the rig the upper layer of strong soil may become overstressed and one or more of the legs may penetrate into the underlying weaker strata The settlement of these legs may be rapid and will continue until adequate load bearing strata is reached, Should the the hull bouyancy point he reached before the pcntrating can or cans reach load bearing strata then penetartion will also stop. As the hard layer of strata causing the temporary footing “hang up" is penetrated it is common for one leg to sink in to the softer soils more rapidly than the others, which can remain at the hang up level As the unit lists the Centre of Gravity shifts, resulting in additional load being transferrd to the penetrating leg ls), this causes penetration to continue and sometimes accelerate untill sufficient bearing capacity strata or adequate hull buoyancy is reached. During this event there is a high chance the excessive horizontal leg loads may develop, Depending on the air gap and water depth at the time the punch through occurs, the length of unsupported leg and strength of the unit, local or total failure of the leg may occur In both shallow and deep water Environments the consequences of unpredictable spudcan penetration during installation of the unit on a location should be minimised by maintain g theunit at minimal airgap during preloading During peloading where the potential for foundation failure has been identified in advance, in may be necessary to begin the preloading operation with the hull in the water at draft It is unusual to be able to achieve sufficient pieload capability in this condition and further preloading at airgap may be required once a firm foundation has been reached
  8. 8. David Stbd leg punch-through all three legs broken 2 ~ T a W Persian Gulf l "‘l ' 1 _. ' i‘ i I _ / _ l iv - . .z''g . ' * __| . ‘ _ - i _ ( i 1:! " - ‘. b- . : . . I ' 1 1174 T“ ’ " " / ‘er-. ‘. I ‘. .4 -—/ . I , . i l ‘vl F - (‘V By Zarir Irani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103
  9. 9. Rack Phase Difference (RPD) LEG OFFSET (SPLAY) — When the spud can is subject to a lateral (horizontal) or sideways load this will also cause RPD. Simi| ar to the other categories of RPD. the offset of the spud can results in misalignment between the downward force exerted on the leg and reaction force from the seabed. While all three categories produce an uneven loading in the leg, this case is easy to visualize as large bending load due to a sideways force. ‘F c" m -'; l :1 t 5‘? ~ . l:l_ F‘ I7?’ ET: ‘,4 Offset due to Pre-existing Hole Offset due to Rapid Penetration By Zarir lrani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103 ' ”' I _’. UT
  10. 10. :'o: : . . . u v‘ . .O. . . 1‘ 9010230310} . hazardous. When a jack up departs a location, depressions or "footprints” are left behind in the seabed. The form of the footprints depends on several variable factors, such as the soil conditions, the depth of the penetrations, the spud can geometry and the method in which the spud cans were extracted. The shape and time period, over which the footprints exist, will also be effected by the currents and sediment conditions in the local area. The presence of footprints at a location can pose a significant hazard to jack up rig operations with the positioning and preloading of a subsequent jack-up unit being difficult or even By Zarir Irani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM. Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103
  11. 11. rmmrmmn K4! urrmmtl mun-m . » n . EH 1! -4 . ‘. ,_. '.“ . ... ,.. ... ... : I ‘I 1, ‘w «am .2.r. .mx£ x pi)‘, l : '-i' i; ~.= .:n. v n; _u'. rt. fummi. m~i: tvli= ., : -rim. -.. mv: -,-. , nsuii. ‘t‘1I§7{&. i~li'll'l_g‘. ‘ . |: ll; l|l= ._lil9lIl; , rm -II uinua -= :r: l 4!‘5’: £,r,1;*; {4!i*lr! | any
  12. 12. lNUtI4§L': L| AL. ue= u:~u I S(M¥t: }I£4 Marine Operations of Self-Elevating Platforms Rack Phase Difference (RPD) Seabed Obstructions: Before lowering the legs of a Jacl<~up the local area must be . 5 . iiiiiiz I example: _ 3:; i. :i: a.. s.. u.2 S‘: 1 J. ‘ checked for obstructions that may be in the form of, for Pinnacle or ridged rock outcrops Pipelines or cables Coral reefs Wrecks etc Rock outcrops or coral can cause severe damage to the spud cans by concentrating the entire footing reaction on one small area. On several occasions pipelines and seabed templates have previously been damaged during jack up installation operations with very severe consequences. Mat supported units which are primary designed for soft seabeds, are particularly susceptible to damage from hard and uneven ground. This is due to the slender mat skirts that are designed to optimise resistance to sliding on soft clays during installation and storm conditions. By Zarir Irani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM. Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103
  13. 13. " Drilling Oct 2009 ___—1: lzeg fracture after punch-through By Zarir Irani, NAMS-CMS, FIIMS, F| CS, AFN| , MBA , HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103 —————— —, — —- : -—~ ~~. ’v. —— . — v_. , . - .4; . .4-1.—
  14. 14. l~«TVll‘xNl’>[r~LF mu 2 ‘Al tum; Km nvm~E By Zarir Irani, NAMS-CMS, FIIMS, FlCS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884 HP — +971 50 8979 103 -. -—J"Z
  15. 15. INDEPENDENCE AND EXPERIENCE | N Su xvmuc us‘. By Zarir Irani, NAMS-CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884 HP — +971 50 8979 103
  16. 16. |NI>Er£NDENc( mp zmumx IN sunvmnc. By Zarir Irani, NAMS-CMS, FIIMS, FICS, AFNI, MBA , HCMM Constellation, Dubai office: +971 4 4232884HP — +971 50 8979 103
  17. 17. INDEPINDEMJLAND zxi-uumci m 5URVlY| Nu By Zarir Irani, NAMS—CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP — +971 50 8979 103
  18. 18. By Zarir Irani, NAMS—CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP - +971 50 8979 103 'i ’ ‘ ‘. r— _ ‘W’
  19. 19. uuuuuuu nd. xANn xm-mu in summu. By Zarir Irani, NAMS—CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP — +971 50 8979 103 fi_‘ If ’ ‘ff’ --v i it-—'(-t-. -'1-1. : -
  20. 20. Lessons Learned: - Fewer people on wet tows — Better forecasting — Early evacuation i; By Zarir Irani, NAMS—CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation, Dubai office: +971 4 4232884HP — +971 50 8979 103 ! ~‘-"“ __‘ -_'i ll -7 ‘- _ A, .._—"
  21. 21. T4 ‘‘'‘%_. L ; .‘. T""- L I T imavsuixms AND Emiumcs IN suxvmuo THANK YOU FOR A PATIENT HEARING ! By Zarir Irani, NAMS—CMS, FIIMS, FICS, AFNI, MBA, HCMM Constellation. Dubai office: +971 4 4232884HP - +971 50 8979 103

×