  1. 1. Magotteaux, By Plus Office BUILDING CONSULTANCY
  2. 2. PROJECt SELECtIOn FEnCHURCH FaCtORy (Suzhou, China) greenfield project (offices, production & clean rooms) - Client: Fenchurch Suzhou Filters Co., Ltd. - Designer: PLUS office architects - Status: Completed in 2007 - Surface: 4,800 m² agFa IMagIng (Wuxi, China) tender & construction follow-up - Client: Agfa Imaging Co., Ltd. (part of AGFA Group) - Designer: Aermei & PLUS office - Status: Completed in 2009 - Surface: 8,300 m² VandEWIELE (Wuxi, China) project coordination during design & construction - Client: Vandewiele N.V. - Designer: PLUS office architects - Status: Completed in 2005 - Surface: 12,300 m² aRPadIS CHEMICaL PLant (Nanjing, China) greenfield project (offices, production & laboratory) - Client: Arpadis Custom Processing Co., Ltd. - Designer: PLUS office & NEC Nanjing - Status: Stage 3 - construction - Surface: 7,100 m²
  3. 3. PROJECt SELECtIOn EdEn CHOCOLatES (Suzhou, China) greenfield project (offices, laboratory & production) - Client: Eden Chocolates - Designer: PLUS office architects - Status: Completed in 2009 - Surface: 9,000 m² MagOttEaUX (Suzhou, China) greenfield project (offices & production) - Client: Magotteaux Alloyed Material Co., Ltd. - Designer: PLUS office architects - Status: Completed in 2006 - Surface: 5,100 m² MORgan FaCtORy (Suzhou, China) greenfield project (offices & production) - Client: Morgan Crucibles Co., Ltd. - Designer: PLUS office architects - Status: Completed in 2008 - Surface: 8,100 m² SHangHaI RICE MILL (Shanghai, China) master plan - Client: Shanghai Rice Mill Company - Designer: PLUS office architects - Status: Completed in 2007 (master plan) - Surface: 180,000 m² 13
  4. 4. FEnCHURCH MEdICaL Location: Suzhou, China Assignment: Private selection Client: Fenchurch Suzhou Filters Co., Ltd. Team: PLUS office architects Status: Completed date: 2006 - 2007 Surface: 4,800 m² Fenchurch detail of facade 27
  5. 5. FEnCHURCH MEdICaL office area
  6. 6. FEnCHURCH MEdICaL general view 29
  7. 7. N FEnCHURCH MEdICaL SNEDE SNEDE 1 2 GEVEL N SNEDE SNEDE 2 1 GEVEL 1 2 3 4 5 6 7 8 9 10 C C C C ZW ZW GEVEL GEVEL GEVEL GEVEL NO NO B B B B A A A A 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 NIVEAU +1 NIVEAU +3 SNEDE SNEDE SNEDE SNEDE GEVEL GEVEL 1 1 2 2 Z Z 0 1 2 5m 0 1 2 5m N N SNEDE SNEDE SNEDE SNEDE 1 2 1 2 GEVEL GEVEL C C C C ZW ZW GEVEL GEVEL GEVEL GEVEL NO NO B B B B A A A A 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 NIVEAU +0 NIVEAU +2 SNEDE SNEDE SNEDE SNEDE 1 1 GEVEL GEVEL 2 2 Z Z 0 1 2 5m 0 1 2 5m layout of the offices and the production areas
  8. 8. FEnCHURCH MEdICaL FEnCHURCH MEdICaL production hall 31
  9. 9. FENCHURCH by PLUS FEnCHURCH MEdICaL 4th floor clean room
  10. 10. FEnCHURCH MEdICaL view towards the GM’s office (bridge construction) east facade 33
  11. 11. EdEn CHOCOLatES Complex material flows and procedures are moulded into one Location: solution. The central core contains the “production knowledge” Suzhou, China and is surrounded by a mulit-functional space for storage and production. Client: Eden Chocolates Co., Ltd. The shape of the outer parameter is controlled by optimal ac- cess points and turning circles. A route brings visitors along Team: interesting learning zones, gardens and meeting area`s into the PLUS office architects core of the building. Status: Completed in 2009 date: February 2008 - September 2009 Surface: 9,100 m² west elevation
  12. 12. EdEn CHOCOLatES OPERATIONAL CORE AREA OFFICE & UTILITIES PRODUCTION & WAREHOUSING CAR & TRUCK AREA GOODS PRODUCTS PACKAGING LIQUID CHOCOLATE Fire truck road DOCK LOBBY UNLOAD DOCK UTILITY AREA LOAD VISITORS SHOP WAREHOUSE WAREHOUSE GOODS IN GOODS OUT GUESTS LOBBY PREPARE KITCHEN LABORATORY (2F) GARBAGE PRODUCTION 01 PRODUCTION 02 CLEAN EQUIPM. Fire truck road first floor layout
  13. 13. EdEn CHOCOLatES visitors office people supply & cleaning workers material flow 17
  14. 14. EDEN material flow chart: truck to truck imported Dark & Milk Liquid chocolate blocks local or imported fresh products Alcohol Chocolate, sourced on pallets: 18 x fillings, nuts,... Packaging material transport locally 750 kg / pallet Unload, Visual Check & unload,unpack, 20 Ton Liquid Chocolate Tank Buffer area visual check AIR LOCK Quality Testing area storage Outside Packaging material Storage Raw Ma- Cold room fresh Rubbish Storage warehouse terials (pallets) and products buffer filling products 1 month buffer RM umwrap & pre- Short Time rubbish / unwrap / buffer Storage pre-filling products pare AIR LOCK ?? ?? ???? prepare pro- Storage un- Filling preparation Fresh product cess & buffer Batch tempering Rework Area Melting tanks wrapped chocolate (blending/ weigh- kitchen tanks ing) 1 shift washing station Line 1 (Mouleerlijn) Line 2 enrobing Line 3 future Line 4 future process sing packing buffer naked product store cold room volume Packaging assem- bling line Packag- check & Air Lock ing automated check with rejector packing line(boxing and &metal detector flowpacking palets fresh product cold Air Lock storage finished storage out room products buffer 2 months send out-visual check-packing area Legend transportation methods normal truck load- load ing area loading dock Forklift Pallet truck (manual) Stainless steel container ? Plates in box ? fresh products pallets for export transport transported on a trolley export or local or local Pumped in Pipeline EdEn CHOCOLatES
  15. 15. EdEn CHOCOLatES guest area
  16. 16. EdEn CHOCOLatES general view west facade 19
  17. 17. EdEn CHOCOLatES 1 1 2 2 3 3 detail curtain wall
  18. 18. EdEn CHOCOLatES 4th floor guest area & roof garden of Eden
  19. 19. EdEn CHOCOLatES GM office 23
  20. 20. MORgan CRUCIBLES The total ground floor is occupied by production & warehouse. Location: Offices and canteen are on upper floors, creating a sharp, Suzhou, China horizontal hygienic separation within one building. Client: Morgan Crucibles Co., Ltd. The rooftop, designed as a secluded garden, will give visual and recreational quality to the location. Skylights bring light Team: into the production and allow visitors to cath a glimpse of the PLUS office architects production process. Status: Completed in 2008 date: January 2007 - April 2008 Surface: 8,100 m² visualisation
  21. 21. MORgan CRUCIBLES Production tower skylight office production & warehouse 37
  22. 22. MagOttEaUX MatERIaLS The building is readable as a minimal, fixed structure, which is Location: then filled up with sectional doors, ventilation louvres, cladding Suzhou, China materials... . This makes future reorganisations more flexible. Assignment: the head of the building, facing south, is cladded with perforated Private tender procedure aluminium sheets, filtering the sun towards the offices behind the wall and at the same time feature a billboard towards the street. Client: Magotteaux Alloyed Materials Co., This building shows clearly its solid structure, evocing an impres- Ltd. sion of strength. Team: PLUS office architects Status: Completed in 2007 date: February 2006 - February 2007 Surface: 5,000 m² corner detail of the west facade
  23. 23. MagOttEaUX MatERIaLS visualisation
  24. 24. MagOttEaUX MatERIaLS detail of cladding wall 45
  25. 25. aRPadIS CHEMICaLS A greenfield project for a paint producing factory. blocks, painted Location: in colours derived from the company logo, are combined with Nanjing, China windows and gates, creating a pixelated facade. Assignment: The independent office building is insulated and blends into the Private selection total site. the necessary fire fighting water pond becomes a water element in the garden. Client: Arpadis Co., Ltd. Team: PLUS office architects date: January 2009 - May 2010 Surface: 7,000 m² visualisation 47
  26. 26. office area INTERVENTION 1A OFFICE FLOOR 02
  27. 27. EXPO 2010 Belgian Pavilion World Expo 2010 06.03.2009 43 The pavilion hoovers over a plaza, creating an partly covered Location: outdoor space. The object contains a bar, restaurant and exposi- Shanghai, China tion room and Assignment: Competition: 1 of 5 finalists Client: Belgian Government Team: Plus office, Buro II, Schuiten, Tjadri, Belien, Cceed visualisation 49
  28. 28. Belgian Pavilion CONCEPT SCHEMES Belgian Pavilion World Expo 2010 World Expo 2010 EXPO 2010 06.03.2009 06.03.2009 6 7 ICONIC BUILDING IAGONAL CIRCULATION EXPANDED PUBLIC DOMAIN ICONIC BUILDING DIAGONAL CIRCULATION EXPANDED PUBLIC DOMAIN DYNAMIC CIRCULATION ICONIC BUILDING EXPANDED PUBLIC DOMAIN concept scheme of the Belgian pavilion (1 of 5 finalists)
  29. 29. Belgian Pavilion EXPO 2010 World Expo 2010 06.03.2009 42 visualisation 51
  30. 30. EXPO 2010 View from Lupu Bridge
  31. 31. PROJECt IndEX year client master stage 1 stage 2 stage 3 machine interior plan concept design construct installation decoration `09 - ... Fenchurch Medical Filters Ph. 3 • • • • • • `09 - ... Arpadis Processing • • • • • `09 - … Rubi Technologies • • • • `09 - `09 Belgian Pavilion Shanghai Expo • • `08 - `09 Eden Chocolates • • • • • `08 - `09 Agfa Imaging • • • `08 - `08 University Leuven (KUL) • • • `07 - `09 Bekaert Textiles • • • • • `07 - `08 Morgan Crucibles • • • • • • `07 - `08 Concordia • • • • • • `07 - `08 Shanghai Rice Mill • • `06 - `08 Fenchurch Medical Filters Ph. 2 • • • • • • `06 - `07 ABM-Antriebe • • • • • `06 - `07 Magotteaux • • • • • `05 - `06 Van De Wiele • • • • • •
  32. 32. PROJECt IndEX year client location client activity size `09 - ... Fenchurch Medical Filters phase. 3 Suzhou SND medical 1500 m² `09 - ... Arpadis Processing Nanjing NCIP chemical 7000 m² `09 - … Rubi Technologies Suzhou SIP tool production 16,000 m² `09 - `09 Belgian Pavilion Shanghai Expo Shanghai (1 of 5 finalists) entertainment 5000 m² `08 - `09 Eden Chocolates Suzhou SND food 9000 m² `08 - `09 Agfa Imaging Wuxi WND imaging materials 8000 m² `08 - `08 University Leuven (KUL) Nanjing Expo exposition structure 100 m² `07 - `09 Bekaert Wuxi WND textile 6000 m² `07 - `08 Morgan Suzhou SIP crucibles 8000 m² `07 - `08 Concordia Suzhou SIP textile 2500 m² `07 - `08 Shanghai Rice Mill Shanghai food 180,000 m² `06 - `08 Fenchurch Medical Filters Ph. 2 Suzhou SND medical 4800 m² `06 - `07 ABM-Antriebe Suzhou SIP auto industry 1800 m² `06 - `07 Magotteaux Suzhou SIP alloyed materials 5300 m² `05 - `06 Van De Wiele Wuxi WND machinery production 12,300 m² 53
  33. 33. CENTRAL PLAZA, TOWER A, ROOM 804 SUXIU ROAD 388, SUZHOU SIP, 25021 +86(0)51262953515 +86(0)51262953515 info@plusoffice.asia - www.plusoffice.eu BUILDING CONSULTANCY

×