Master Data Management 1-2-3
Download PPT to animate and read comments panel

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
687
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Data from vendors & partners (outside) / asset teams & central repository (inside) is interpreted locally
    From time to time (after project closure, or before a lease sale, etc.) data is promoted or staged:
    A data custodian / DM team ensures their accuracy and sends bad data back for clean-up (UWI naming & CRS the most common issue, as are shot point or log trace errors)
    If clean then data are referenced to the master data repository (aka. Archive)
    This is the good copy in corporate central repository that can be re-used by all:
    This goes along with a metadata repository management to help find same
    Viewing portal relies on that for distribution across teams or to partners and agencies
    Add geoportal stack (GIS / interoperabilty on master data, static and dynamic viewers as needed)
    Rarely starts with this situation, one usually folds an existing system into a new framework:
    Agree on a ‘freeze date’ to start migrating all data to an isolated testing environment
    Migrate the data and create/adjust/improve all the workflows to meet business needs
    Agree on a ‘go live date’ when:
    All workflows are deemed by asset/function teams to work
    Old test environment becomes new production environment
    Old production is kept as fail-over just in case something fails
    Add ‘delta’ (incremental data accumulated since freeze date)
    New environment fully functional, then retire the old environment
  • MDM_123

    1. 1. 1 Master Data Mgmt. blueprint Project data/ Interp. Project data/ Interp. Archive / Master “Gold Copy” Seismic / Daily Prod Data Freeze Data Migrate Add Delta New Server Project Data / Interpret Staging Server Seismic / Daily Prod Static WMS Dynamic WFS GIS / Interoperability Viewing portal (click to animate slide show read more in notes panel)

    ×