Quantitative Risk …
• Assessment
– Beliefs: what do we believe about the risk?
• Analysis
– Effects: what does it mean to the overall project?
• Awareness
– Actions: what should we do about it?
experience; questioning; expressing risk;
using historical data; confidence in process; methodology
Value from our:
“adding them up” – logical consequence of assessmentsValue from our:
communicating; understanding; experience; methodologyValue from our:
Assessment → Analysis → Awareness
• Never been done before
• Challenging conditions
• Uncertain regulations
• Early phase
• Been done before
• Easy conditions
• Established regulations
• Mid-execution
P10
P50
P90
Base
P10
P50
P90
Base
• “Cheaper but
more risky”
• “More expensive,
less risky”
Assessment → Analysis → Awareness
• Techniques to help assessment
Credit: from Centrica Energy’s PACE guidelines.
Quantitative Risk …
• Assessment
– Beliefs: what do we believe about the risk?
• Analysis
– Effects: what does it mean to the overall project?
• Awareness
– Actions: what should we do about it?
“adding them up” – logical consequence of assessments
experience; questioning; expressing risk;
using historical data; confidence in process; methodology
communicating; understanding; experience; methodology
Value from our:
discussion; organised thought; committing to “paper”Benefit:
Value from our:
Value from our:
ownership of risks and actions; demonstrate active managementBenefit:
Benefit: logical, repeatable, indisputable
Quantitative Risk …
• Given the risk as we have expressed it:
– How valuable is response x?
– How much overall contingency is likely needed?
– Where is it likely needed?
– And when?
– What’s our biggest risk at P50?
– At P90?
– What contractual incentivisations are appropriate?
Where is it likely needed?
WE DON’T KNOW
“I don’t know”
1 – Deterministic
2 – Single +/-
3 – Individual +/-
4 – Explicit causes
Base estimate 16.4 MMUSD
1 – Deterministic
• No expression of risk
1 – Deterministic
• As a breakdown, but still no expression of risk
Base
estimate
(MMUSD)
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 16.4
1 – Deterministic
• Logic is important (cost and schedule)
P10 Base P90
Base estimate 12 16.4 25 MMUSD
P10 P50 P90
Base
2 – Single +/-
• Express risk with a single distribution
P10 Base P90
Base estimate 12 16.4 25 MMUSD
P10 P50 P90
Base
P10 Base
(MMUSD)
P90
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 12 16.4 25
P10 P50 P90
Base
2 – Single +/-
• Breakdown, but still single +/-
P10 Base
(MMUSD)
P90
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 12 16.4 25
P10 P50 P90
Base
2 – Single +/-
• Use the uniform distribution, or better
Single value 1-point estimate
More knowledge /
less uncertainty
Beta Pert
(larger shape parameter,
default shape parameter of 4)
3-point estimate
Triangle / Trigen 3-point estimate
Beta Pert
(smaller shape parameter)
3-point estimate
Uniform 2-point estimate
Less knowledge /
more uncertainty
Credit: from Centrica Energy’s QRA training manual
P10 Base
(MMUSD)
P90
Bulks 1.7 2.3 3.5
Fabrication 4.2 5.7 8.7
Transportation 1.4 1.9 2.9
Heavy lift vessel 1.2 1.6 2.4
Hook-up and
commissioning
3.1 4.3 6.6
Project services 0.4 0.6 0.9
Total 12 16.4 25
- % + %
Base
P10 P50 P90
Base
2 – Single +/-
• Assume same proportional uncertainty, with single common cause
P10 Base
(MMUSD)
P90
Bulks 1.7 2.3 3.5
Fabrication 4.2 5.7 8.7
Transportation 1.4 1.9 2.9
Heavy lift vessel 1.2 1.6 2.4
Hook-up and
commissioning
3.1 4.3 6.6
Project services 0.4 0.6 0.9
Total 12 16.4 25
- % + %
Base
P10 P50 P90
Base
3 – Individual +/- on each element
• Can express multiple common causes
Base
(MMUSD)
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 16.4
- % + %
Base
- % + %
Base
P10
P50
P90
Base
Base
(MMUSD)
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 16.4
- % + %
Base
- % + %
Base
P10
P50
P90
Base
4 – Explicit risk elements
• Specify “causes” explicitly, and how response could reduce risk
Base
(MMUSD)
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 16.4
- % + %
Base
- % + %
Base
P10
P50
P90
Base
MitigateBase
(MMUSD)
Bulks 2.3
Fabrication 5.7
Transportation 1.9
Heavy lift vessel 1.6
Hook-up and
commissioning
4.3
Project services 0.6
Total 16.4
- % + %
Base
- % + %
Base
P10
P50
P90
Base
Mitigate
Quantitative Risk …
• Assessment
– Beliefs: what do we believe about the risk?
• Analysis
– Effects: what does it mean to the overall project?
• Awareness
– Actions: what should we do about it?
overall cost distribution, considered as a whole
“adding them up” – logical consequence of assessments
experience; questioning; expressing risk;
using historical data; confidence in process; methodology
what could cause deviation from base estimates; how much;
(+ why, who, when)
discussion; organised thought; committing to “paper”
communicating; understanding; experience; methodology
overall level of risk; value of response; (+ visibility, management)
ownership of risks and actions; demonstrate active management
Value from our:
Ask about:
Benefit:
Ask about:
Value from our:
Ask about:
Value from our:
Benefit:
Benefit:
logical, repeatable, indisputable
“I don’t know”
• As long as we are clear about the assumptions we are making,
the QRA is useful
• QRA is challenged by challenging its assumptions
• Level of detail not so important
– The right level is where the team are thinking about the risk.
INDEPENDENCE I
Independence – problem 1
• Roll a die
Independence – problem 1
• Roll 2 dice
• Roll 3 dice
Independence – problem 1
• and more …
• Independence + abundance = certainty
• Allows us to spread risk
– e.g. insurance, acquisitions, diversification, portfolio
management
• “Central Limit Theorem”
– (but it isn’t)
• Important to recognise common causes
Recognise common causes
INDEPENDENCE II
Independence – problem 2
P90 = 98 would be 135
Independence – problem 2
Credit: from Centrica Energy’s PACE guidelines
Independence – problem 2
Credit: from Centrica Energy’s PACE guidelines
Attempts to split the P90
(Costs in £m)
QRA output:
Base Mean P70 P90 P70 P90 P70 P90 P70 P90
Facilities
Long lead items 92.7 102.6 104.8 105.6 105.3 109.3 102.1 103.5 121.0 125.6
EPIC installation 278.7 403.9 431.3 443.1 414.5 430.4 420.0 434.4 363.7 377.6
CAR insurance 9.3 15.8 17.4 18.6 16.2 16.8 16.9 18.2 12.1 12.6
Drilling
10 wells complete 716.6 876.4 922.4 953.5 899.4 933.8 898.3 934.7 935.2 971.0
Overall project
Pre-define 46.5 46.5 46.5 46.5 47.7 49.5 45.3 45.6 60.7 63.0
JV costs 35.1 53.8 57.9 62.6 55.2 57.3 56.4 61.4 45.8 47.6
Project services 21.4 27.2 27.8 28.8 27.9 29.0 27.1 28.2 27.9 29.0
Total capital expenditure
TOTAL 1,200 1,526 1,566 1,626 1,566 1,626 1,566 1,626 1,566 1,626
Sum of individual lines: 1,200 1,526 1,608 1,659 1,566 1,626 1,566 1,626 1,566 1,626
Allocated by
mean proportion:
… or allocated by
percentile proportion:
… or allocated by
base proportion:
Credit: from Centrica Energy’s QRA training manual
Splitting the P90
• Use conditional averages, conditional on the overall outcome
• P90 factiles are conditional on overall outcome
being (on average) its P90
– Factiles of individual costs sum to the P90 total cost
– Factiles show what each element is “doing” (on average), when
total cost is P90 (on average)
– Condition is based on largest possible subset
• Any split or breakdown
– We can “account for” the risk
– Helps with validation (or invalidation) with the team
– Used by GDF Suez, ConocoPhillips, Centrica …
Splitting the P90
• The total contingency can be shown (on average) against the
individual costs
Splitting the P90
• The total contingency can also be shown against different types of
risk
Splitting the P90
• The contribution of risks to the overall project cost or schedule can
be calculated
Splitting the P90
• The total contingency can be shown (on average) phased over time
Quantitative Risk …
• Assessment
– Beliefs: what do we believe about the risk?
• Analysis
– Effects: what does it mean to the overall project?
• Awareness
– Actions: what should we do about it?
overall cost distribution, considered as a whole
“adding them up” – logical consequence of assessments
experience; questioning; expressing risk;
using historical data; confidence in process; methodology
what could cause deviation from base estimates; how much; (+ why,
who)
discussion; organised thought; committing to “paper”
communicating; understanding; experience; methodology
overall level of risk; value of response; (+ visibility, management)
ownership of risks and actions; demonstrate active management
Value from our:
Ask about:
Benefit:
Ask about:
Value from our:
Ask about:
Value from our:
Benefit:
Benefit:
logical, repeatable, indisputable
White Box by BOLD

More Related Content

Similar to User friendly risk management - Simon White

2002, Advanced Schedule RiskPresentation Lisbon.ppt
2002, Advanced Schedule RiskPresentation Lisbon.ppt2002, Advanced Schedule RiskPresentation Lisbon.ppt
2002, Advanced Schedule RiskPresentation Lisbon.pptAsBali1
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo
 
Decision and risk analysis
Decision and risk analysisDecision and risk analysis
Decision and risk analysisIndra Biswakarma
 
Claims club, London - September 2016
Claims club, London - September 2016Claims club, London - September 2016
Claims club, London - September 2016Browne Jacobson LLP
 
gestion logistique selon la norme ISO 28000
gestion logistique selon la norme ISO 28000gestion logistique selon la norme ISO 28000
gestion logistique selon la norme ISO 28000Abderrahim Meftah
 
Terry Johns: Uncertainty - understanding the impact and the importance of rec...
Terry Johns: Uncertainty - understanding the impact and the importance of rec...Terry Johns: Uncertainty - understanding the impact and the importance of rec...
Terry Johns: Uncertainty - understanding the impact and the importance of rec...Association for Project Management
 
Failure Mode and Effect Analysis
Failure Mode and Effect AnalysisFailure Mode and Effect Analysis
Failure Mode and Effect Analysistulasiva
 
The Art and Science Behind Successful Risk Workshops
The Art and Science Behind Successful Risk WorkshopsThe Art and Science Behind Successful Risk Workshops
The Art and Science Behind Successful Risk WorkshopsAcumen
 
12 Project Risk and uncertainty.ppt .
12 Project Risk and uncertainty.ppt     .12 Project Risk and uncertainty.ppt     .
12 Project Risk and uncertainty.ppt .Athar739197
 
Decision Making for Clinical Trial Supply
Decision Making for Clinical Trial SupplyDecision Making for Clinical Trial Supply
Decision Making for Clinical Trial SupplyN-SIDE
 
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...Association for Project Management
 
30.11.2011 Best practice mining risk management cradle to grave, John Wheadon
30.11.2011 Best practice mining risk management cradle to grave, John Wheadon30.11.2011 Best practice mining risk management cradle to grave, John Wheadon
30.11.2011 Best practice mining risk management cradle to grave, John WheadonThe Business Council of Mongolia
 

Similar to User friendly risk management - Simon White (20)

Mg6088 spm unit-3
Mg6088 spm unit-3Mg6088 spm unit-3
Mg6088 spm unit-3
 
Where did it go wrong?
Where did it go wrong?Where did it go wrong?
Where did it go wrong?
 
APM Edinburgh risk management january 2017 final
APM Edinburgh risk management january 2017 finalAPM Edinburgh risk management january 2017 final
APM Edinburgh risk management january 2017 final
 
Cost estimating in these times of austerity
Cost estimating in these times of austerityCost estimating in these times of austerity
Cost estimating in these times of austerity
 
Risk Management as an enabler for project success
Risk Management as an enabler for project successRisk Management as an enabler for project success
Risk Management as an enabler for project success
 
Session 43 Michael Bruhn Barfod
Session 43 Michael Bruhn BarfodSession 43 Michael Bruhn Barfod
Session 43 Michael Bruhn Barfod
 
2002, Advanced Schedule RiskPresentation Lisbon.ppt
2002, Advanced Schedule RiskPresentation Lisbon.ppt2002, Advanced Schedule RiskPresentation Lisbon.ppt
2002, Advanced Schedule RiskPresentation Lisbon.ppt
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
 
Decision and risk analysis
Decision and risk analysisDecision and risk analysis
Decision and risk analysis
 
Claims club, London - September 2016
Claims club, London - September 2016Claims club, London - September 2016
Claims club, London - September 2016
 
gestion logistique selon la norme ISO 28000
gestion logistique selon la norme ISO 28000gestion logistique selon la norme ISO 28000
gestion logistique selon la norme ISO 28000
 
Terry Johns: Uncertainty - understanding the impact and the importance of rec...
Terry Johns: Uncertainty - understanding the impact and the importance of rec...Terry Johns: Uncertainty - understanding the impact and the importance of rec...
Terry Johns: Uncertainty - understanding the impact and the importance of rec...
 
Failure Mode and Effect Analysis
Failure Mode and Effect AnalysisFailure Mode and Effect Analysis
Failure Mode and Effect Analysis
 
The Art and Science Behind Successful Risk Workshops
The Art and Science Behind Successful Risk WorkshopsThe Art and Science Behind Successful Risk Workshops
The Art and Science Behind Successful Risk Workshops
 
12 Project Risk and uncertainty.ppt .
12 Project Risk and uncertainty.ppt     .12 Project Risk and uncertainty.ppt     .
12 Project Risk and uncertainty.ppt .
 
cheat sheet.ppt
cheat sheet.pptcheat sheet.ppt
cheat sheet.ppt
 
Decision Making for Clinical Trial Supply
Decision Making for Clinical Trial SupplyDecision Making for Clinical Trial Supply
Decision Making for Clinical Trial Supply
 
Hemp final
Hemp finalHemp final
Hemp final
 
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
A simple approach to contingency drawdown, presented by Ben Fry, 10th Oct 201...
 
30.11.2011 Best practice mining risk management cradle to grave, John Wheadon
30.11.2011 Best practice mining risk management cradle to grave, John Wheadon30.11.2011 Best practice mining risk management cradle to grave, John Wheadon
30.11.2011 Best practice mining risk management cradle to grave, John Wheadon
 

More from Association for Project Management

APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

More from Association for Project Management (20)

APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 
Sustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to knowSustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to know
 

Recently uploaded

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 

Recently uploaded (20)

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 

User friendly risk management - Simon White

  • 1.
  • 2. Quantitative Risk … • Assessment – Beliefs: what do we believe about the risk? • Analysis – Effects: what does it mean to the overall project? • Awareness – Actions: what should we do about it? experience; questioning; expressing risk; using historical data; confidence in process; methodology Value from our: “adding them up” – logical consequence of assessmentsValue from our: communicating; understanding; experience; methodologyValue from our:
  • 3. Assessment → Analysis → Awareness • Never been done before • Challenging conditions • Uncertain regulations • Early phase • Been done before • Easy conditions • Established regulations • Mid-execution P10 P50 P90 Base P10 P50 P90 Base • “Cheaper but more risky” • “More expensive, less risky”
  • 4. Assessment → Analysis → Awareness • Techniques to help assessment Credit: from Centrica Energy’s PACE guidelines.
  • 5. Quantitative Risk … • Assessment – Beliefs: what do we believe about the risk? • Analysis – Effects: what does it mean to the overall project? • Awareness – Actions: what should we do about it? “adding them up” – logical consequence of assessments experience; questioning; expressing risk; using historical data; confidence in process; methodology communicating; understanding; experience; methodology Value from our: discussion; organised thought; committing to “paper”Benefit: Value from our: Value from our: ownership of risks and actions; demonstrate active managementBenefit: Benefit: logical, repeatable, indisputable
  • 6. Quantitative Risk … • Given the risk as we have expressed it: – How valuable is response x? – How much overall contingency is likely needed? – Where is it likely needed? – And when? – What’s our biggest risk at P50? – At P90? – What contractual incentivisations are appropriate?
  • 7. Where is it likely needed?
  • 9. “I don’t know” 1 – Deterministic 2 – Single +/- 3 – Individual +/- 4 – Explicit causes
  • 10. Base estimate 16.4 MMUSD 1 – Deterministic • No expression of risk
  • 11. 1 – Deterministic • As a breakdown, but still no expression of risk Base estimate (MMUSD) Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 16.4
  • 12. 1 – Deterministic • Logic is important (cost and schedule)
  • 13. P10 Base P90 Base estimate 12 16.4 25 MMUSD P10 P50 P90 Base 2 – Single +/- • Express risk with a single distribution P10 Base P90 Base estimate 12 16.4 25 MMUSD P10 P50 P90 Base
  • 14. P10 Base (MMUSD) P90 Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 12 16.4 25 P10 P50 P90 Base 2 – Single +/- • Breakdown, but still single +/- P10 Base (MMUSD) P90 Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 12 16.4 25 P10 P50 P90 Base
  • 15. 2 – Single +/- • Use the uniform distribution, or better Single value 1-point estimate More knowledge / less uncertainty Beta Pert (larger shape parameter, default shape parameter of 4) 3-point estimate Triangle / Trigen 3-point estimate Beta Pert (smaller shape parameter) 3-point estimate Uniform 2-point estimate Less knowledge / more uncertainty Credit: from Centrica Energy’s QRA training manual
  • 16. P10 Base (MMUSD) P90 Bulks 1.7 2.3 3.5 Fabrication 4.2 5.7 8.7 Transportation 1.4 1.9 2.9 Heavy lift vessel 1.2 1.6 2.4 Hook-up and commissioning 3.1 4.3 6.6 Project services 0.4 0.6 0.9 Total 12 16.4 25 - % + % Base P10 P50 P90 Base 2 – Single +/- • Assume same proportional uncertainty, with single common cause P10 Base (MMUSD) P90 Bulks 1.7 2.3 3.5 Fabrication 4.2 5.7 8.7 Transportation 1.4 1.9 2.9 Heavy lift vessel 1.2 1.6 2.4 Hook-up and commissioning 3.1 4.3 6.6 Project services 0.4 0.6 0.9 Total 12 16.4 25 - % + % Base P10 P50 P90 Base
  • 17. 3 – Individual +/- on each element • Can express multiple common causes Base (MMUSD) Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 16.4 - % + % Base - % + % Base P10 P50 P90 Base Base (MMUSD) Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 16.4 - % + % Base - % + % Base P10 P50 P90 Base
  • 18. 4 – Explicit risk elements • Specify “causes” explicitly, and how response could reduce risk Base (MMUSD) Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 16.4 - % + % Base - % + % Base P10 P50 P90 Base MitigateBase (MMUSD) Bulks 2.3 Fabrication 5.7 Transportation 1.9 Heavy lift vessel 1.6 Hook-up and commissioning 4.3 Project services 0.6 Total 16.4 - % + % Base - % + % Base P10 P50 P90 Base Mitigate
  • 19. Quantitative Risk … • Assessment – Beliefs: what do we believe about the risk? • Analysis – Effects: what does it mean to the overall project? • Awareness – Actions: what should we do about it? overall cost distribution, considered as a whole “adding them up” – logical consequence of assessments experience; questioning; expressing risk; using historical data; confidence in process; methodology what could cause deviation from base estimates; how much; (+ why, who, when) discussion; organised thought; committing to “paper” communicating; understanding; experience; methodology overall level of risk; value of response; (+ visibility, management) ownership of risks and actions; demonstrate active management Value from our: Ask about: Benefit: Ask about: Value from our: Ask about: Value from our: Benefit: Benefit: logical, repeatable, indisputable
  • 20. “I don’t know” • As long as we are clear about the assumptions we are making, the QRA is useful • QRA is challenged by challenging its assumptions • Level of detail not so important – The right level is where the team are thinking about the risk.
  • 22. Independence – problem 1 • Roll a die
  • 23. Independence – problem 1 • Roll 2 dice • Roll 3 dice
  • 24. Independence – problem 1 • and more …
  • 25. • Independence + abundance = certainty • Allows us to spread risk – e.g. insurance, acquisitions, diversification, portfolio management • “Central Limit Theorem” – (but it isn’t) • Important to recognise common causes Recognise common causes
  • 27. Independence – problem 2 P90 = 98 would be 135
  • 28. Independence – problem 2 Credit: from Centrica Energy’s PACE guidelines
  • 29. Independence – problem 2 Credit: from Centrica Energy’s PACE guidelines
  • 30. Attempts to split the P90 (Costs in £m) QRA output: Base Mean P70 P90 P70 P90 P70 P90 P70 P90 Facilities Long lead items 92.7 102.6 104.8 105.6 105.3 109.3 102.1 103.5 121.0 125.6 EPIC installation 278.7 403.9 431.3 443.1 414.5 430.4 420.0 434.4 363.7 377.6 CAR insurance 9.3 15.8 17.4 18.6 16.2 16.8 16.9 18.2 12.1 12.6 Drilling 10 wells complete 716.6 876.4 922.4 953.5 899.4 933.8 898.3 934.7 935.2 971.0 Overall project Pre-define 46.5 46.5 46.5 46.5 47.7 49.5 45.3 45.6 60.7 63.0 JV costs 35.1 53.8 57.9 62.6 55.2 57.3 56.4 61.4 45.8 47.6 Project services 21.4 27.2 27.8 28.8 27.9 29.0 27.1 28.2 27.9 29.0 Total capital expenditure TOTAL 1,200 1,526 1,566 1,626 1,566 1,626 1,566 1,626 1,566 1,626 Sum of individual lines: 1,200 1,526 1,608 1,659 1,566 1,626 1,566 1,626 1,566 1,626 Allocated by mean proportion: … or allocated by percentile proportion: … or allocated by base proportion: Credit: from Centrica Energy’s QRA training manual
  • 31. Splitting the P90 • Use conditional averages, conditional on the overall outcome • P90 factiles are conditional on overall outcome being (on average) its P90 – Factiles of individual costs sum to the P90 total cost – Factiles show what each element is “doing” (on average), when total cost is P90 (on average) – Condition is based on largest possible subset • Any split or breakdown – We can “account for” the risk – Helps with validation (or invalidation) with the team – Used by GDF Suez, ConocoPhillips, Centrica …
  • 32. Splitting the P90 • The total contingency can be shown (on average) against the individual costs
  • 33. Splitting the P90 • The total contingency can also be shown against different types of risk
  • 34. Splitting the P90 • The contribution of risks to the overall project cost or schedule can be calculated
  • 35. Splitting the P90 • The total contingency can be shown (on average) phased over time
  • 36. Quantitative Risk … • Assessment – Beliefs: what do we believe about the risk? • Analysis – Effects: what does it mean to the overall project? • Awareness – Actions: what should we do about it? overall cost distribution, considered as a whole “adding them up” – logical consequence of assessments experience; questioning; expressing risk; using historical data; confidence in process; methodology what could cause deviation from base estimates; how much; (+ why, who) discussion; organised thought; committing to “paper” communicating; understanding; experience; methodology overall level of risk; value of response; (+ visibility, management) ownership of risks and actions; demonstrate active management Value from our: Ask about: Benefit: Ask about: Value from our: Ask about: Value from our: Benefit: Benefit: logical, repeatable, indisputable
  • 37. White Box by BOLD