Balancing Your Portfolio
In The Digital Age
Portfolio Management Conference
23 May 2019
Simon Harwood, DirectLine Group
Introducing
Simon Harwood
Head of Portfolio Management, Business Planning & PMO
Technology Services, DirectLine Group
23-May-19 2
The content of this presentation and any views or opinions expressed are those of the presenter only.
The Exam Question
3
Costs
Risks /
Issues
Achieve strategic
goals
Optimise value
Maximise
benefits …
quickly
Changing
Priorities
23-May-19
Portfolio management … the theory
4
Manage risks
Vision Corporate
goals &
strategy
Deliver
benefits
Achieve
goals
Portfolio governanceCreate
strategic
plan
Construct &
prioritise
portfolio
Review
portfolio
Assess
performance
of portfolio
Develop, monitor & control the portfolio
(Manage & deliver the programmes & projects)
Reporting on the portfolio
Management of
different
delivery methods
According to the APM BoK …
Portfolio management is the selection, prioritisation and control of an
organisation's projects and programmes in line with its strategic objectives
and capacity to deliver. The goal is to balance change initiatives and
business-as-usual while optimising return on investment.
This is a continuous process to achieve the evolving strategy of the
organisation.
23-May-19
Portfolio management … the reality
523-May-19
Triangulating the Portfolio
6
High Level Intentions
• List of Programmes / Projects
• Budget allocations
Bottoms Up Programme /
Project Demand
• Individual plans by internal skill
and 3rd Party by month
• FTE Demand & £ views
Resource Supply
• Planned capacity by skill and
3rd Party by month
• FTE Supply & £ views
23-May-19
Prioritising & Scheduling
723-May-19
On-going
Understanding Capacity & Framework
23-May-19 8
Headcount
FTE
Available
FTE
Resource Pool
Current
Change
Capacity (FTE)
per month
Change
Capacity (£k)
Forecast
Annual cost
(£k)
May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20
Business Group 1 6.00 702 6.00 6.00 6.00 6.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00
Business Group 2 3.00 324 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Business Group 3 7.00 756 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Business Group 4 5.00 540 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Business Group 5 8.00 864 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Technology Group 1 7.00 756 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Technology Group 2 5.00 540 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Technology Group 3 10.00 1,080 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Technology Group 4 4.00 405 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Technology Group 5 3.00 324 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Technology Group 6 1.00 1,166 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3rd Party 1 1,000 0 0 25 25 0 0 0 0 0 0 0 0 0 0 0
3rd Party 2 500 0 0 0 0 0 40 40 20 10 10 10 10 5 5 0
3rd Party 3 750 0 0 0 0 0 0 0 0 10 10 20 10 10 0 0
Understanding Estimating
Need to understand:
• Effort
which enables costs
• Duration
• Assumptions
• Impact on BAU / run
• Benefits
 Leads to an understanding of
confidence
 Is a living exercise
23-May-19 9
Understanding Demand & Scheduling
23-May-19 10
Business Group 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Business Group 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Business Group 3
Business Group 4 4.00 4.00
Business Group 5
Technology Group 1 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.25
Technology Group 2 0.25 0.25
Technology Group 3 3.00 3.00 3.00
Technology Group 4
Technology Group 5 0.25 2.00 2.00 0.50 0.50
Technology Group 6
3rd Party 1 25 25
3rd Party 2 10 10 10
3rd Party 3
Apr-20 May-20 Jun-20 Jul-20Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20Resource Pool May-19 Jun-19 Jul-19 Aug-19 Sep-19
Individual
Rolling Total
Business Group 1 6.50 5.50 5.50 5.50 6.50 8.50 8.50 7.50 9.50 9.50 8.50 8.50 8.00 8.00 6.00 112.00
Business Group 2 4.00 3.50 3.50 5.50 6.00 6.50 6.50 6.50 5.00 5.00 4.00 4.00 4.00 3.00 3.00 70.00
Business Group 3 7.00 7.00 7.00 9.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 8.00 8.00 7.00 5.00 135.00
Business Group 4 5.00 5.00 5.00 6.00 6.00 6.00 6.00 10.00 10.00 6.00 6.00 6.00 5.50 5.50 5.00 93.00
Business Group 5 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 10.00 12.00 10.00 10.00 8.00 130.00
Technology Group 1 8.50 8.00 8.00 8.00 8.00 9.00 9.00 9.00 9.00 8.25 8.00 8.00 5.00 4.00 3.50 113.25
Technology Group 2 5.25 5.25 5.00 6.00 6.00 6.50 6.50 7.00 7.00 7.00 7.00 7.00 6.25 6.00 5.25 93.00
Technology Group 3 10.00 10.00 10.00 10.50 10.50 13.25 13.25 14.00 11.00 11.00 11.00 11.00 11.00 10.50 10.25 167.25
Technology Group 4 4.00 4.00 4.00 4.00 4.00 4.25 4.25 4.00 7.00 7.00 8.00 7.00 7.00 4.00 4.00 76.50
Technology Group 5 3.00 3.25 3.00 3.00 3.00 5.25 5.25 3.50 3.50 3.00 4.00 5.00 5.00 3.00 3.00 55.75
Technology Group 6 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 15.00
3rd Party 1 0 0 25 25 0 0 0 0 0 0 0 0 0 0 0 50.00
3rd Party 2 0 0 0 0 0 40 40 20 10 10 10 10 5 5 0 150.00
3rd Party 3 0 0 0 0 0 0 0 0 10 10 20 10 10 0 0 60.00
Apr-20 May-20 Jun-20 Jul-20Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20Resource Pool May-19 Jun-19 Jul-19 Aug-19 Sep-19
Aggregated
Understanding Supply vs Demand
23-May-19 11
Heatmap Using Planned Capacity
TS Resource Pool
Change
Capacity (FTE)
per month
Change
Capacity (£k)
Average
Monthly
Demand (FTE)
May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20
Business Group 1 6.00 7.47 108% 92% 92% 92% 108% 106% 106% 94% 119% 119% 106% 106% 100% 100% 100%
Business Group 2 3.00 4.67 133% 117% 117% 183% 200% 217% 217% 217% 167% 167% 133% 133% 133% 100% 100%
Business Group 3 7.00 9.00 100% 100% 100% 129% 157% 157% 157% 157% 157% 157% 157% 114% 114% 100% 71%
Business Group 4 5.00 6.20 100% 100% 100% 120% 120% 120% 120% 200% 200% 120% 120% 120% 110% 110% 100%
Business Group 5 8.00 8.67 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 125% 150% 125% 125% 100%
Technology Group 1 7.00 7.55 121% 114% 114% 114% 114% 129% 129% 129% 129% 118% 114% 114% 71% 57% 50%
Technology Group 2 5.00 6.20 105% 105% 100% 120% 120% 130% 130% 140% 140% 140% 140% 140% 125% 120% 105%
Technology Group 3 10.00 11.15 100% 100% 100% 105% 105% 133% 133% 140% 110% 110% 110% 110% 110% 105% 103%
Technology Group 4 4.00 5.10 100% 100% 100% 100% 100% 142% 142% 133% 233% 233% 267% 233% 233% 133% 133%
Technology Group 5 3.00 3.72 100% 108% 100% 100% 100% 175% 175% 117% 117% 100% 133% 167% 167% 100% 100%
Technology Group 6 1.00 1.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heatmap Using Current Capacity
TS Resource Pool
Change
Capacity (FTE)
per month
Change
Capacity (£k)
Average
Monthly
Demand (FTE)
May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20
Business Group 1 6.00 7.47 108% 92% 92% 92% 108% 142% 142% 125% 158% 158% 142% 142% 133% 133% 100%
Business Group 2 3.00 4.67 133% 117% 117% 183% 200% 217% 217% 217% 167% 167% 133% 133% 133% 100% 100%
Business Group 3 7.00 9.00 100% 100% 100% 129% 157% 157% 157% 157% 157% 157% 157% 114% 114% 100% 71%
Business Group 4 5.00 6.20 100% 100% 100% 120% 120% 120% 120% 200% 200% 120% 120% 120% 110% 110% 100%
Business Group 5 8.00 8.67 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 125% 150% 125% 125% 100%
Technology Group 1 7.00 7.55 121% 114% 114% 114% 114% 129% 129% 129% 129% 118% 114% 114% 71% 57% 50%
Technology Group 2 5.00 6.20 105% 105% 100% 120% 120% 130% 130% 140% 140% 140% 140% 140% 125% 120% 105%
Technology Group 3 10.00 11.15 100% 100% 100% 105% 105% 133% 133% 140% 110% 110% 110% 110% 110% 105% 103%
Technology Group 4 4.00 5.10 100% 100% 100% 100% 100% 106% 106% 100% 175% 175% 200% 175% 175% 100% 100%
Technology Group 5 3.00 3.72 100% 108% 100% 100% 100% 175% 175% 117% 117% 100% 133% 167% 167% 100% 100%
Technology Group 6 1.00 1.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
What about working with Agile teams?
12
Sprint
Ref
19_10
19_11
19_12
19_13
19_14
19_15
19_16
19_17
19_18
19_19
19_20
19_21
19_22
19_23
19_24
19_25
19_26
20_01
20_02
20_03
20_04
20_05
20_06
20_07
20_08
Sprint
Start
09-May-19
23-May-19
06-Jun-19
20-Jun-19
04-Jul-19
18-Jul-19
01-Aug-19
15-Aug-19
29-Aug-19
12-Sep-19
26-Sep-19
10-Oct-19
24-Oct-19
07-Nov-19
21-Nov-19
05-Dec-19
19-Dec-19
02-Jan-20
16-Jan-20
30-Jan-20
13-Feb-20
27-Feb-20
12-Mar-20
26-Mar-20
09-Apr-20
Sprint
End
22-May-19
05-Jun-19
19-Jun-19
03-Jul-19
17-Jul-19
31-Jul-19
14-Aug-19
28-Aug-19
11-Sep-19
25-Sep-19
09-Oct-19
23-Oct-19
06-Nov-19
20-Nov-19
04-Dec-19
18-Dec-19
01-Jan-20
15-Jan-20
29-Jan-20
12-Feb-20
26-Feb-20
11-Mar-20
25-Mar-20
08-Apr-20
22-Apr-20
Release
08-Jun-19
06-Jul-19
03-Aug-19
31-Aug-19
28-Sep-19
09-Nov-19
07-Dec-19
11-Jan-20
01-Feb-20
29-Feb-20
28-Mar-20
Team 1
MVP1
MVP2
MVP6
MVP8
Team 2
MVP5
MVP4
MVP3
MVP10
Backlog Estimate
MVP7 8
MVP9 5
MVP11 6
MVP12 7
MVP13 4
UAT Go LiveRegressionDevelopAnalysis
Team 1 Day Rate Units Cost per Sprint
Scrum Master 650 10 6,500
Business Analyst 600 10 6,000
Business Analyst 625 10 6,250
Developer 525 10 5,250
Developer 550 10 5,500
Developer 550 10 5,500
Tester 475 10 4,750
Tester 450 10 4,500
Environments 3,500 1 3,500
Management 5,000 1 5,000
52,750 full or @ 85% 44,838
23-May-19
Bringing it together / maintaining it
Proactive
stakeholder
management
Living
demand
capture &
prioritisation
Closely
monitor
delivery
progress
Monthly
reforecasting
(Capacity &
Demand)
1323-May-19
What has my experience taught me?
23-May-19 14
1. Understand the individuals
2. Assume nothing
3. Be inquisitive
4. Communicate, communicate, communicate some more
5. The principles of balancing your portfolio in the Digital
Age isn’t any different to how it’s always been!

More Related Content

Similar to Balancing Your Portfolio In The Digital Age

Business Plan - Term Project
Business Plan - Term ProjectBusiness Plan - Term Project
Business Plan - Term ProjectKevin Swenson
 
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdfjesatol449
 
Presentasi tugas akhir
Presentasi tugas akhirPresentasi tugas akhir
Presentasi tugas akhirDedi Dedi
 
The regulatory response jeff balchin
The regulatory response   jeff balchinThe regulatory response   jeff balchin
The regulatory response jeff balchinScott Donald
 
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...QueBIT Consulting
 
Monthly Corporate Evaluation PowerPoint Presentation Slides
Monthly Corporate Evaluation PowerPoint Presentation SlidesMonthly Corporate Evaluation PowerPoint Presentation Slides
Monthly Corporate Evaluation PowerPoint Presentation SlidesSlideTeam
 
Joint Planning PowerPoint Presentation Slides
Joint Planning PowerPoint Presentation Slides Joint Planning PowerPoint Presentation Slides
Joint Planning PowerPoint Presentation Slides SlideTeam
 
Financial Literacy for Digital Marketing Firms
Financial Literacy for Digital Marketing FirmsFinancial Literacy for Digital Marketing Firms
Financial Literacy for Digital Marketing FirmsSummit CPA Group
 
Employee Effective Attitude Survey in Sree Ramakrisha Alloys
Employee Effective Attitude Survey in Sree Ramakrisha AlloysEmployee Effective Attitude Survey in Sree Ramakrisha Alloys
Employee Effective Attitude Survey in Sree Ramakrisha AlloysMohan Kanni
 
Venture Capital Fundraising PowerPoint Presentation Slides
Venture Capital Fundraising PowerPoint Presentation SlidesVenture Capital Fundraising PowerPoint Presentation Slides
Venture Capital Fundraising PowerPoint Presentation SlidesSlideTeam
 
Power financials - how we work
Power financials - how we workPower financials - how we work
Power financials - how we workSteve Power
 
Implementation of Six Sigma
Implementation of Six SigmaImplementation of Six Sigma
Implementation of Six SigmaUsman Ghani
 
Detailed Business Plan For Company Powerpoint Presentation Slides
Detailed Business Plan For Company Powerpoint Presentation SlidesDetailed Business Plan For Company Powerpoint Presentation Slides
Detailed Business Plan For Company Powerpoint Presentation SlidesSlideTeam
 
Emperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor Asset Management
 

Similar to Balancing Your Portfolio In The Digital Age (20)

Business Plan - Term Project
Business Plan - Term ProjectBusiness Plan - Term Project
Business Plan - Term Project
 
TeamSixBP
TeamSixBPTeamSixBP
TeamSixBP
 
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf
1 LGRRC-Tool-1-KM-Audit-Organizational-Capability-Assessment-2-1.pdf
 
Presentasi tugas akhir
Presentasi tugas akhirPresentasi tugas akhir
Presentasi tugas akhir
 
The regulatory response jeff balchin
The regulatory response   jeff balchinThe regulatory response   jeff balchin
The regulatory response jeff balchin
 
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
 
Monthly Corporate Evaluation PowerPoint Presentation Slides
Monthly Corporate Evaluation PowerPoint Presentation SlidesMonthly Corporate Evaluation PowerPoint Presentation Slides
Monthly Corporate Evaluation PowerPoint Presentation Slides
 
Joint Planning PowerPoint Presentation Slides
Joint Planning PowerPoint Presentation Slides Joint Planning PowerPoint Presentation Slides
Joint Planning PowerPoint Presentation Slides
 
Financial Literacy for Digital Marketing Firms
Financial Literacy for Digital Marketing FirmsFinancial Literacy for Digital Marketing Firms
Financial Literacy for Digital Marketing Firms
 
Cost reduction strategies
Cost reduction strategiesCost reduction strategies
Cost reduction strategies
 
Employee Effective Attitude Survey in Sree Ramakrisha Alloys
Employee Effective Attitude Survey in Sree Ramakrisha AlloysEmployee Effective Attitude Survey in Sree Ramakrisha Alloys
Employee Effective Attitude Survey in Sree Ramakrisha Alloys
 
ecoprobm 247540 Algorithm Investment Report
ecoprobm 247540 Algorithm Investment Reportecoprobm 247540 Algorithm Investment Report
ecoprobm 247540 Algorithm Investment Report
 
Venture Capital Fundraising PowerPoint Presentation Slides
Venture Capital Fundraising PowerPoint Presentation SlidesVenture Capital Fundraising PowerPoint Presentation Slides
Venture Capital Fundraising PowerPoint Presentation Slides
 
labgenomics 084650 Algorithm Investment Report
labgenomics 084650 Algorithm Investment Reportlabgenomics 084650 Algorithm Investment Report
labgenomics 084650 Algorithm Investment Report
 
Power financials - how we work
Power financials - how we workPower financials - how we work
Power financials - how we work
 
ZQK JV
ZQK JVZQK JV
ZQK JV
 
Implementation of Six Sigma
Implementation of Six SigmaImplementation of Six Sigma
Implementation of Six Sigma
 
TIP - Star Conference - october 2012
TIP - Star Conference - october 2012TIP - Star Conference - october 2012
TIP - Star Conference - october 2012
 
Detailed Business Plan For Company Powerpoint Presentation Slides
Detailed Business Plan For Company Powerpoint Presentation SlidesDetailed Business Plan For Company Powerpoint Presentation Slides
Detailed Business Plan For Company Powerpoint Presentation Slides
 
Emperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott Fund
 

More from Association for Project Management

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

More from Association for Project Management (20)

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 

Recently uploaded

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 

Recently uploaded (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 

Balancing Your Portfolio In The Digital Age

  • 1. Balancing Your Portfolio In The Digital Age Portfolio Management Conference 23 May 2019 Simon Harwood, DirectLine Group
  • 2. Introducing Simon Harwood Head of Portfolio Management, Business Planning & PMO Technology Services, DirectLine Group 23-May-19 2 The content of this presentation and any views or opinions expressed are those of the presenter only.
  • 3. The Exam Question 3 Costs Risks / Issues Achieve strategic goals Optimise value Maximise benefits … quickly Changing Priorities 23-May-19
  • 4. Portfolio management … the theory 4 Manage risks Vision Corporate goals & strategy Deliver benefits Achieve goals Portfolio governanceCreate strategic plan Construct & prioritise portfolio Review portfolio Assess performance of portfolio Develop, monitor & control the portfolio (Manage & deliver the programmes & projects) Reporting on the portfolio Management of different delivery methods According to the APM BoK … Portfolio management is the selection, prioritisation and control of an organisation's projects and programmes in line with its strategic objectives and capacity to deliver. The goal is to balance change initiatives and business-as-usual while optimising return on investment. This is a continuous process to achieve the evolving strategy of the organisation. 23-May-19
  • 5. Portfolio management … the reality 523-May-19
  • 6. Triangulating the Portfolio 6 High Level Intentions • List of Programmes / Projects • Budget allocations Bottoms Up Programme / Project Demand • Individual plans by internal skill and 3rd Party by month • FTE Demand & £ views Resource Supply • Planned capacity by skill and 3rd Party by month • FTE Supply & £ views 23-May-19
  • 8. Understanding Capacity & Framework 23-May-19 8 Headcount FTE Available FTE Resource Pool Current Change Capacity (FTE) per month Change Capacity (£k) Forecast Annual cost (£k) May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Business Group 1 6.00 702 6.00 6.00 6.00 6.00 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 6.00 Business Group 2 3.00 324 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Business Group 3 7.00 756 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 Business Group 4 5.00 540 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 Business Group 5 8.00 864 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 Technology Group 1 7.00 756 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 Technology Group 2 5.00 540 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 Technology Group 3 10.00 1,080 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 Technology Group 4 4.00 405 4.00 4.00 4.00 4.00 4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Technology Group 5 3.00 324 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 Technology Group 6 1.00 1,166 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3rd Party 1 1,000 0 0 25 25 0 0 0 0 0 0 0 0 0 0 0 3rd Party 2 500 0 0 0 0 0 40 40 20 10 10 10 10 5 5 0 3rd Party 3 750 0 0 0 0 0 0 0 0 10 10 20 10 10 0 0
  • 9. Understanding Estimating Need to understand: • Effort which enables costs • Duration • Assumptions • Impact on BAU / run • Benefits  Leads to an understanding of confidence  Is a living exercise 23-May-19 9
  • 10. Understanding Demand & Scheduling 23-May-19 10 Business Group 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Business Group 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Business Group 3 Business Group 4 4.00 4.00 Business Group 5 Technology Group 1 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.25 Technology Group 2 0.25 0.25 Technology Group 3 3.00 3.00 3.00 Technology Group 4 Technology Group 5 0.25 2.00 2.00 0.50 0.50 Technology Group 6 3rd Party 1 25 25 3rd Party 2 10 10 10 3rd Party 3 Apr-20 May-20 Jun-20 Jul-20Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20Resource Pool May-19 Jun-19 Jul-19 Aug-19 Sep-19 Individual Rolling Total Business Group 1 6.50 5.50 5.50 5.50 6.50 8.50 8.50 7.50 9.50 9.50 8.50 8.50 8.00 8.00 6.00 112.00 Business Group 2 4.00 3.50 3.50 5.50 6.00 6.50 6.50 6.50 5.00 5.00 4.00 4.00 4.00 3.00 3.00 70.00 Business Group 3 7.00 7.00 7.00 9.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 8.00 8.00 7.00 5.00 135.00 Business Group 4 5.00 5.00 5.00 6.00 6.00 6.00 6.00 10.00 10.00 6.00 6.00 6.00 5.50 5.50 5.00 93.00 Business Group 5 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 10.00 12.00 10.00 10.00 8.00 130.00 Technology Group 1 8.50 8.00 8.00 8.00 8.00 9.00 9.00 9.00 9.00 8.25 8.00 8.00 5.00 4.00 3.50 113.25 Technology Group 2 5.25 5.25 5.00 6.00 6.00 6.50 6.50 7.00 7.00 7.00 7.00 7.00 6.25 6.00 5.25 93.00 Technology Group 3 10.00 10.00 10.00 10.50 10.50 13.25 13.25 14.00 11.00 11.00 11.00 11.00 11.00 10.50 10.25 167.25 Technology Group 4 4.00 4.00 4.00 4.00 4.00 4.25 4.25 4.00 7.00 7.00 8.00 7.00 7.00 4.00 4.00 76.50 Technology Group 5 3.00 3.25 3.00 3.00 3.00 5.25 5.25 3.50 3.50 3.00 4.00 5.00 5.00 3.00 3.00 55.75 Technology Group 6 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 15.00 3rd Party 1 0 0 25 25 0 0 0 0 0 0 0 0 0 0 0 50.00 3rd Party 2 0 0 0 0 0 40 40 20 10 10 10 10 5 5 0 150.00 3rd Party 3 0 0 0 0 0 0 0 0 10 10 20 10 10 0 0 60.00 Apr-20 May-20 Jun-20 Jul-20Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20Resource Pool May-19 Jun-19 Jul-19 Aug-19 Sep-19 Aggregated
  • 11. Understanding Supply vs Demand 23-May-19 11 Heatmap Using Planned Capacity TS Resource Pool Change Capacity (FTE) per month Change Capacity (£k) Average Monthly Demand (FTE) May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Business Group 1 6.00 7.47 108% 92% 92% 92% 108% 106% 106% 94% 119% 119% 106% 106% 100% 100% 100% Business Group 2 3.00 4.67 133% 117% 117% 183% 200% 217% 217% 217% 167% 167% 133% 133% 133% 100% 100% Business Group 3 7.00 9.00 100% 100% 100% 129% 157% 157% 157% 157% 157% 157% 157% 114% 114% 100% 71% Business Group 4 5.00 6.20 100% 100% 100% 120% 120% 120% 120% 200% 200% 120% 120% 120% 110% 110% 100% Business Group 5 8.00 8.67 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 125% 150% 125% 125% 100% Technology Group 1 7.00 7.55 121% 114% 114% 114% 114% 129% 129% 129% 129% 118% 114% 114% 71% 57% 50% Technology Group 2 5.00 6.20 105% 105% 100% 120% 120% 130% 130% 140% 140% 140% 140% 140% 125% 120% 105% Technology Group 3 10.00 11.15 100% 100% 100% 105% 105% 133% 133% 140% 110% 110% 110% 110% 110% 105% 103% Technology Group 4 4.00 5.10 100% 100% 100% 100% 100% 142% 142% 133% 233% 233% 267% 233% 233% 133% 133% Technology Group 5 3.00 3.72 100% 108% 100% 100% 100% 175% 175% 117% 117% 100% 133% 167% 167% 100% 100% Technology Group 6 1.00 1.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heatmap Using Current Capacity TS Resource Pool Change Capacity (FTE) per month Change Capacity (£k) Average Monthly Demand (FTE) May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Business Group 1 6.00 7.47 108% 92% 92% 92% 108% 142% 142% 125% 158% 158% 142% 142% 133% 133% 100% Business Group 2 3.00 4.67 133% 117% 117% 183% 200% 217% 217% 217% 167% 167% 133% 133% 133% 100% 100% Business Group 3 7.00 9.00 100% 100% 100% 129% 157% 157% 157% 157% 157% 157% 157% 114% 114% 100% 71% Business Group 4 5.00 6.20 100% 100% 100% 120% 120% 120% 120% 200% 200% 120% 120% 120% 110% 110% 100% Business Group 5 8.00 8.67 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 125% 150% 125% 125% 100% Technology Group 1 7.00 7.55 121% 114% 114% 114% 114% 129% 129% 129% 129% 118% 114% 114% 71% 57% 50% Technology Group 2 5.00 6.20 105% 105% 100% 120% 120% 130% 130% 140% 140% 140% 140% 140% 125% 120% 105% Technology Group 3 10.00 11.15 100% 100% 100% 105% 105% 133% 133% 140% 110% 110% 110% 110% 110% 105% 103% Technology Group 4 4.00 5.10 100% 100% 100% 100% 100% 106% 106% 100% 175% 175% 200% 175% 175% 100% 100% Technology Group 5 3.00 3.72 100% 108% 100% 100% 100% 175% 175% 117% 117% 100% 133% 167% 167% 100% 100% Technology Group 6 1.00 1.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
  • 12. What about working with Agile teams? 12 Sprint Ref 19_10 19_11 19_12 19_13 19_14 19_15 19_16 19_17 19_18 19_19 19_20 19_21 19_22 19_23 19_24 19_25 19_26 20_01 20_02 20_03 20_04 20_05 20_06 20_07 20_08 Sprint Start 09-May-19 23-May-19 06-Jun-19 20-Jun-19 04-Jul-19 18-Jul-19 01-Aug-19 15-Aug-19 29-Aug-19 12-Sep-19 26-Sep-19 10-Oct-19 24-Oct-19 07-Nov-19 21-Nov-19 05-Dec-19 19-Dec-19 02-Jan-20 16-Jan-20 30-Jan-20 13-Feb-20 27-Feb-20 12-Mar-20 26-Mar-20 09-Apr-20 Sprint End 22-May-19 05-Jun-19 19-Jun-19 03-Jul-19 17-Jul-19 31-Jul-19 14-Aug-19 28-Aug-19 11-Sep-19 25-Sep-19 09-Oct-19 23-Oct-19 06-Nov-19 20-Nov-19 04-Dec-19 18-Dec-19 01-Jan-20 15-Jan-20 29-Jan-20 12-Feb-20 26-Feb-20 11-Mar-20 25-Mar-20 08-Apr-20 22-Apr-20 Release 08-Jun-19 06-Jul-19 03-Aug-19 31-Aug-19 28-Sep-19 09-Nov-19 07-Dec-19 11-Jan-20 01-Feb-20 29-Feb-20 28-Mar-20 Team 1 MVP1 MVP2 MVP6 MVP8 Team 2 MVP5 MVP4 MVP3 MVP10 Backlog Estimate MVP7 8 MVP9 5 MVP11 6 MVP12 7 MVP13 4 UAT Go LiveRegressionDevelopAnalysis Team 1 Day Rate Units Cost per Sprint Scrum Master 650 10 6,500 Business Analyst 600 10 6,000 Business Analyst 625 10 6,250 Developer 525 10 5,250 Developer 550 10 5,500 Developer 550 10 5,500 Tester 475 10 4,750 Tester 450 10 4,500 Environments 3,500 1 3,500 Management 5,000 1 5,000 52,750 full or @ 85% 44,838 23-May-19
  • 13. Bringing it together / maintaining it Proactive stakeholder management Living demand capture & prioritisation Closely monitor delivery progress Monthly reforecasting (Capacity & Demand) 1323-May-19
  • 14. What has my experience taught me? 23-May-19 14 1. Understand the individuals 2. Assume nothing 3. Be inquisitive 4. Communicate, communicate, communicate some more 5. The principles of balancing your portfolio in the Digital Age isn’t any different to how it’s always been!