Lean manufacturing 01

1,105 views

Published on

Time lost due to type diffrent types of waste

Published in: Education, Business, Technology
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,105
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

Lean manufacturing 01

  1. 1. WEL COME TO THE LEAN MANUFACTURING SHOW
  2. 2. 5 4 3 2 1
  3. 3. 1
  4. 4. 1 2 3 Waste of Correction Waste of Over-production Waste of Motion IDENTIFICATION OF WASTE There are 7 Types of Waste in manufacturing process. 4 Waste of Material Movement 5 Waste of Waiting 6 Waste of Inventory 7 Waste of Processing
  5. 5. WASTE OF CORRECTION
  6. 6. WASTE OF OVER PRODUCTION
  7. 7. WASTE OF MOTION
  8. 8. WASTE OF MATERIAL MOVEMENT
  9. 9. WASTE OF WAITING
  10. 10. WASTE OF INVENTORY
  11. 11. WASTE OF PROCESSING
  12. 12. Can we reduce our Wastages? Yes , By reducing wastes,We can Yes , By reducing wastes,We can Reduce process cost & Increase Customer satisfication Let,s Do it
  13. 13. Nothing is impossible. Because , IMPOSSIBLE It,Self says that , I M POSSIBLE
  14. 14. THANK YOU

×