Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

IBM Maximo Asset Management Training - Asset and Work Management for Chang Shin Indonesia

696 views

Published on

Work Management is designed to cover all of the applications that would be necessary for maintenance/asset management professionals in their work roles.

The applications covered include the MAXIMO 7 Environment, Navigation, Locations, Assets (Equipment), Work Orders (creation, planning and reporting of actual charges) and Failure Classifications.

In addition, the Work Planning components are included which focuses on the roles of Maintenance Craft Leads, Planners and Supervisors.

Published in: Software
  • Be the first to comment

  • Be the first to like this

IBM Maximo Asset Management Training - Asset and Work Management for Chang Shin Indonesia

  1. 1. EAM Consultant: D u a n e A r i t o n a n g @ A r t D u a n e
  2. 2. Work Management is designed to cover all of the applications that would be necessary for maintenance/asset management professionals in their work roles. The applications covered include the MAXIMO 7 Environment, Navigation, Locations, Assets (Equipment), Work Orders (creation, planning and reporting of actual charges) and Failure Classifications. In addition, the Work Planning components are included which focuses on the roles of Maintenance Craft Leads, Planners and Supervisors. The content includes Job Plans, PM Records, Routes and Safety Plans.
  3. 3. According to the principles of Total Productive Maintenance (TPM), the most critical element in accomplishing those goals is the education, inclusion and responsibility of all related parties: management, supervisors, planners, mechanics and data entry personnel. It is imperative that users are properly trained to make data entries that accurately and consistently represent the activities of the Organization – JJ CSI. This TALIAN training introduces a new user to the powerful features available in Maximo. The data entered into MAXIMO 7.5 constitutes the source input for measuring maintenance success, as well as the source for establishment and evaluation of future policy improvement initiatives.
  4. 4. 1. Understand the purpose of the Work Order module and the general stages of the lifecycle process. 2. Identify the applications in the Work Order module that supports the phases in the lifecycle process. 3. Understand how Maximo applications can work together to manage maintenance work. 4. Planning Work Order 5. Scheduling Work Order 6. Assigning and dispatching Work Order 7. Work Order completion, Reporting and Closure process
  5. 5. Upon the successful completion of this training, the Maximo user will be able to:  Accurately and efficiently log into MAXIMO 7.5  Identify and Utilize Screen Form Conventions  Successfully navigate to any given Maximo Application or screen  Effectively query for Maximo Records  Understand how to enter Asset and Location records and their relationship to the Drilldown (Hierarchy)  Within the confines of the Organization’s Business Process understand how to create and maintain a Maximo Job Plan, PM and Work Order
  6. 6.  Efficiently plan the usage of labor, materials and tool resources to build effective Work Plans  Apply Failure Codes and Remarks to Work Orders  Electronically enter the actual resource usage and costs against Work Orders their associated Locations, Assets and general ledger accounts  Create and modify Job Plans  Identify the relationship between Job Plans and the:  PM and Work Order  Scheduling of Labor Resources  Reorder of Planned Materials
  7. 7. After attending the Maximo Work Management Training Workshop, you will have a solid understanding of IBM Maximo’s capabilities for managing maintenance and performing day-to-day work management transactions. This training workshop covers all elements of the work management process: identification, planning, scheduling, assignment, execution, completion and analysis.
  8. 8. The Maximo Work Management Training Workshop covers the following topic areas: 1. The Purpose of Maximo 2. Getting Started in Maximo 3. Screens and Navigation 4. Module / Application Overview 5. Searching and Querying 6. Assets vs. Locations in Maximo 7. Using the Asset / Location Hierarchy 8. Work Order Field Definitions 9. Creating Work Orders
  9. 9. 10.Typical Process (Statuses) 11.Reviewing Work Orders 12.Applying Planning Information to your Work Order (tasks, labor, materials and tools) 13.Assigning Actuals to your Work Order 14.Completing / Closing Work Orders 15.Creating Job Plans 16.Locating and Duplicating Job Plans from the Library 17.Creating Preventive Maintenance (PM) Records 18.Generating PMs 19.Case-Study
  10. 10. The Maximo Work Management training workshop covers the following applications and functionality: 1. Job Plans 2. Preventive Maintenance 3. Work Order Tracking 4. Labor Reporting 5. Quick Reporting 6. Assignment Manager 7. Assets 8. Locations 9. Classifications 10.Failure Codes 11.Labor 12.Crafts 13.Item Master 14.Service Items 15.Tools 16.Inventory
  11. 11. EAM Consultant: D u a n e A r i t o n a n g @ A r t D u a n e

×