ADTEC Pre No.23 July 09

  1. 1. LAPORAN KEMAJUAN PROJEK NO.23 ‘JULAI 2009’ PROJEK ADTEC TAIPING PEMILIK KEMENTERIAN SUMBER MANUSIA PEGARAH PROJEK JABATAN KERJA RAYA MALAYSIA KONTRAKTOR R&B KAMALBINA SDN. BHD
  2. 2. LOKASI PROJEK ADTEC TAIPING
  3. 3. AS RAMA PEREMPUAN AS RAMA LELAKI DEWAN MAKAN GARAJ M&E KENDERAAN PLANT ROOM 2 KELAS F TNB KUARTERS KOMPOS IT PLAS TIK S ERAMIK S UB B , C, C&D S TATION S URAU KELAS G BENGKEL TEK. MAKLUMAT MIKRO ELEKTRONIK & JAMIN KUALITI M&E PLANT ROOM BANGUNAN 1 PENTADBIRAN PUS AT S UMBER KAFETERIA LOBI UTAMA DEWAN BES AR DEWAN KULIAH PELAN TAPAK ADTEC TAIPING
  4. 4. KEMAJUAN KERJA FIZIKAL TARIKH LAPORAN : 10 JULAI 2009 JADUAL : 95.18 % SEBENAR : 95.42 % KESELURUHAN : 0.24 %
  5. 5. KEMAJUAN KERJA KEWANGAN TARIKH LAPORAN : 10 JULAI 2009 JADUAL : 94.99 % SEBENAR : 94.97 % KESELURUHAN : -0.02 %
  6. 6. Graf Kemajuan Kerja Fizikal Sehingga 10/7/2009 (EOT 1) 100.00 % Ke m. Fiz ikal 90.00 Se be nar 95.42% 80.00 % Ke m. Fiz ikal 70.00 Jadual EO T 95.18% 60.00 Peratus % 50.00 40.00 30.00 %Ke . Fizikal Ja m dual Asal %Ke . Fizikal Se nar m be 20.00 %Ke . Fizikal Ja m dual EOT NO.1 10.00 0.00 16- 05- 25- 06- 24- 07- 20- 08- 13- 09- 18-10- 09- 11- 05- 12- 12- 01- 21-02- 27- 03- 15-04- 29- 05- 08-07- 15-07- 22- 08- 19- 09- 28- 10- 04- 12- 08- 01- 12- 02- 11-03- 15- 04- 16- 05- 12- 06- 10-07- 13-08- 14-11-08 07 07 07 07 07 07 07 07 08 08 08 08 08 08 08 08 08 08 08 09 09 09 09 09 09 09 09 %Kem. Fizikal Jadual Asal 0.00 0.48 1.04 2.56 4.19 6.12 7.70 9.98 13.53 18.44 20.82 23.34 26.09 29.06 30.76 33.81 36.84 41.32 43.00 47.08 60.55 70.88 84.22 99.14 100.00 %Kem. Fizikal Sebenar 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46 67.03 68.03 73.45 80.28 87.59 95.42 %Kem. Fizikal Jadual EOT NO.1 0.00 2.59 5.28 7.56 9.30 11.64 13.12 15.62 18.74 22.53 26.73 29.56 32.40 35.71 37.09 41.47 45.77 46.74 50.89 55.19 58.46 67.03 68.03 73.45 79.69 85.16 95.18 100.00 Bulan
  7. 7. KEMAJUAN KERJA FIZIKAL - DEWAN BESAR BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 94.21% 96.74% 2.53% JULAI 09’ 98.28% 99.36% 1.08% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 98.46% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 92.70% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS NA NA DUST CONTROL NA NA PA 100.00% 93.51% PROCESS NA NA COOLING SMATV 100.00% 99.29% CCTV NA NA ICT 100.00% 99.25%
  8. 8. DEWAN BESAR
  9. 9. DEWAN BESAR
  10. 10. KEMAJUAN KERJA FIZIKAL – LOBI BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.68% 99.72% 0.04% JULAI 09’ 99.95% 100.00% 0.05% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 98.80% 100.00% AIR COND NA NA SUBMAIN CABLE 97.69% 100.00% FIRE FIGHTING NA NA DB 75.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 94.22% 100.00% LPG INSTALL. NA NA MAIN S/BOARD NA NA COMPRES. AIR NA NA LPS NA NA DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV NA NA CCTV 100.00% 98.70% ICT NA NA
  11. 11. LOBI UTAMA
  12. 12. KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMA BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 98.54% 98.19% -0.35% JULAI 09’ 99.93% 99.94% 0.01% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 90.81% 100.00% DB 75.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 99.82% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 75.00% 100.00% COMPRES. AIR NA NA LPS 98.84% 98.00% DUST CONTROL NA NA PA 84.88% 93.10% PROCESS NA NA COOLING SMATV NA NA CCTV NA NA ICT 90.38% 99.00%
  13. 13. DEWAN KULIAH UTAMA
  14. 14. KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 97.50% 98.54% 1.04% JULAI 09’ 99.42% 99.83% 0.42% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 98.77% 100.00% AIR COND 98.33% 100.00% SUBMAIN CABLE 96.40% 100.00% FIRE FIGHTING 84.79% 100.00% DB 85.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 85.00% 100.00% COMPRES. AIR NA NA LPS 93.29% 98.29% DUST CONTROL NA NA PA 91.27% 94.22% PROCESS NA NA COOLING SMATV 100.00% 99.63% CCTV NA NA ICT 28.81% 81.00%
  15. 15. PUSAT SUMBER / PERPUSTAKAAN
  16. 16. KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & BANGUNAN PENGURUSAN SUMBER MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 96.42% 96.51% 0.09% JULAI 09’ 99.37% 99.66% 0.29% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 99.00% AIR COND 95.34% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 92.57% 87.38% DB 85.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 96.42% 98.00% LPG INSTALL. NA NA MAIN S/BOARD 75.00% 100.00% COMPRES. AIR NA NA LPS 87.80% 96.95% DUST CONTROL NA NA PA 21.28% 91.07% PROCESS NA NA COOLING SMATV 100.00% 99.57% CCTV 100.00% 99.90% ICT 78.44% 92.00%
  17. 17. BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
  18. 18. KEMAJUAN KERJA FIZIKAL - KAFETARIA BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.58% 99.23% -0.35% JULAI 09’ 100.00% 99.85% -0.15% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 78.00% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. 83.70% 92.00% LUMINAIRE 100.00% 100.00% LPG INSTALL. 82.56% 90.00% MAIN S/BOARD NA NA COMPRES. AIR NA NA LPS 100.00% 93.78% DUST CONTROL NA NA PA 100.00% 92.30% PROCESS NA NA COOLING SMATV 100.00% 99.43% CCTV NA NA ICT 0.00% 100.00%
  19. 19. KAFETERIA
  20. 20. KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI BANGUNAN MAKLUMAT MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 98.05% 98.01% -0.05% JULAI 09’ 99.85% 99.70% -0.15% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00 % 100.00 % AIR COND 94.61% 100.00% SUBMAIN CABLE 100.00 % 100.00% FIRE FIGHTING 83.25% 100.00% DB 100.00 % 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00 % 100.00% LPG INSTALL. NA NA MAIN S/BOARD 75.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 98.22% DUST CONTROL NA NA PA 100.00% 95.30% PROCESS NA NA COOLING SMATV 100.00% 99.79% CCTV 100.00% 99.30% ICT 89.88% 82.28%
  21. 21. BENGKEL TEKNOLOGI MAKLUMAT
  22. 22. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN BANGUNAN TERMAJU (PLASTIK) MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 98.42% 98.30% -0.12% JULAI 09’ 99.99% 99.61% -0.38% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 98.20% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 90.15% 100.00% DB 75.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 75.00% 95.00% COMPRES. AIR 93.26% 95.00% LPS 100.00% 98.22% DUST CONTROL NA NA PA 98.80% 95.87% PROCESS 91.12% 39.45% COOLING SMATV 76.76% 98.87% CCTV 100.00% 99.32% ICT 97.03% 81.86%
  23. 23. BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)
  24. 24. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN BANGUNAN TERMAJU (KOMPOSIT) MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 98.46% 98.41% -0.05% JULAI 09’ 99.87% 99.64% -0.23% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 89.89% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR 93.26% 95.00% LPS 100.00% 96.25% DUST CONTROL 87.72% 96.58% PA 100.00% 94.94% PROCESS 91.30% 22.05% COOLING SMATV 79.29% 98.24% CCTV 100.00% 99.20% ICT 97.00% 80.81%
  25. 25. BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)
  26. 26. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN BANGUNAN TERMAJU (SERAMIK) MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 97.15% 97.14% -0.02% JULAI 09’ 99.20% 99.60% 0.40% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 96.66% 100.00% SUBMAIN CABLE 99.29% 100.00% FIRE FIGHTING 86.34% 100.00% DB 78.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 85.00% 100.00% COMPRES. AIR 93.26% 95.00% LPS 100.00% 98.05% DUST CONTROL 92.74% 95.59% PA 100.00% 95.15% PROCESS 47.25% 39.45% COOLING SMATV 77.45% 97.54% CCTV 100.00% 99.34% ICT 100.00% 82.44%
  27. 27. BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)
  28. 28. KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN BANGUNAN KUALITI MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 96.50% 96.99% 0.48% JULAI 09’ 98.70% 99.63% 0.94% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 98.98% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 97.49% 100.00% FIRE FIGHTING 81.58% 100.00% DB 97.48% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 89.27% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 85.25% 100.00% COMPRES. AIR 93.26% 95.00% LPS 89.22% 97.89% DUST CONTROL 58.90% 96.91% PA 88.09% 93.93% PROCESS NA NA COOLING SMATV 100.00% 98.97% CCTV 100.00% 99.00% ICT 15.65% 81.61%
  29. 29. BENGKEL KEJ. JAMINAN KUALITI
  30. 30. KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO BANGUNAN ELEKTRONIK MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 95.58% 95.59% 0.01% JULAI 09’ 98.23% 98.62% 0.39% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 99.00% AIR COND 97.16% 100.00% SUBMAIN CABLE 99.95% 100.00% FIRE FIGHTING 80.91% 100.00% DB 96.10% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR 93.26% 95.00% LPS 99.48% 98.16% DUST CONTROL NA NA PA 97.01% 94.88% PROCESS NA NA COOLING SMATV 100.00% 99.30% CCTV 100.00% 98.91% ICT 98.34% 92.94%
  31. 31. BENGKEL MIKRO ELEKTRONIK
  32. 32. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 100.00% 100.00% 0.00% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING NA NA DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 97.60% DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV 100.00% 98.74% CCTV 100.00% 99.82% ICT 100.00% 100.00%
  33. 33. KUARTERS KELAS ‘B’
  34. 34. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 100.00% 100.00% 0.00% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING NA NA DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 97.66% DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV 100.00% 98.55% CCTV NA NA ICT 100.00% 99.06%
  35. 35. KUARTERS KELAS ‘C’
  36. 36. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’ BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 100.00% 100.00% 0.00% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING NA NA DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 90.00% COMPRES. AIR NA NA LPS 100.00% 97.96% DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV 100.00% 98.74% CCTV NA NA ICT 100.00% 100.00%
  37. 37. KUARTERS KELAS ‘C’ + ‘D’
  38. 38. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 98.63% 98.85% 0.12% JULAI 09’ 99.99% 100.00% 0.01% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND NA NA SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING NA NA DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 90.00% COMPRES. AIR NA NA LPS 99.02% 98.32% DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV 100.00% 99.83% CCTV NA NA ICT 99.42% 99.34%
  39. 39. KUARTERS KELAS ‘F’ ( 4 TINGKAT )
  40. 40. KUARTERS KELAS ‘F’ ( 5 TINGKAT )
  41. 41. KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G (1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT) BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.57% 99.58% 0.01% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND NA NA SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING NA NA DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 98.32% DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV 100.00% 99.83% CCTV NA NA ICT 100.00% 98.37%
  42. 42. KUARTERS KELAS ‘G’ ( 5 TINGKAT )
  43. 43. KUARTERS KELAS ‘G’ ( 4 TINGKAT )
  44. 44. KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.83% 96.63% 0.01% JULAI 09’ 99.82% 100.00% 0.18% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 98.79% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 78.92% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. 83.70% 92.00% LUMINAIRE 100.00% 100.00% LPG INSTALL. 82.56% 90.00% MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 98.51% DUST CONTROL NA NA PA 96.95% 95.23% PROCESS NA NA COOLING SMATV 100.00% 99.43% CCTV NA NA ICT 100.00% 100.00%
  45. 45. DEWAN MAKAN
  46. 46. KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & B BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.39% 99.55% 0.16% JULAI 09’ 99.97% 100.00% 0.03% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 40.44% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 98.60% DUST CONTROL NA NA PA 93.00% 96.06% PROCESS NA NA COOLING SMATV 99.82% 99.31% CCTV 100.00% 99.78% ICT 100.00% 99.43%
  47. 47. ASRAMA LELAKI A & B
  48. 48. KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & D BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.44% 99.50% 0.06% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 100.00% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 92.70% 100.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 97.77% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 98.69% DUST CONTROL NA NA PA 94.38% 95.64% PROCESS NA NA COOLING SMATV 99.75% 99.31% CCTV 100.00% 99.75% ICT 100.00% 99.62%
  49. 49. ASRAMA PEREMPUAN C & D
  50. 50. KEMAJUAN KERJA FIZIKAL - SURAU BANGUNAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 96.94% 96.63% -0.31% JULAI 09’ 98.50% 99.90% 1.40% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND NA NA SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 100.00% 80.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 85.00% 100.00% COMPRES. AIR NA NA LPS 99.32% 97.61% DUST CONTROL NA NA PA 86.67% 92.79% PROCESS NA NA COOLING SMATV NA NA CCTV NA NA ICT NA NA
  51. 51. SURAU
  52. 52. KEMAJUAN KERJA FIZIKAL - ASTAKA BANGUNAN SOKONGAN MONTH PLANNED ACTUAL AHEAD / DELAY JUN 09’ 99.99% 99.83% -0.16% JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND NA NA SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 100.00% 80.00% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 100.00% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 100.00% 100.00% COMPRES. AIR NA NA LPS 100.00% 96.60% DUST CONTROL NA NA PA 98.28% 93.55% PROCESS NA NA COOLING SMATV NA NA CCTV NA NA ICT NA NA
  53. 53. BANGUNAN SOKONGAN ASTAKA
  54. 54. KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM BANGUNAN SOKONGAN MONTH PLANNED ACTUAL AHEAD / DELAY JULAI 09’ 100.00% 100.00% 0.00% ELECTRICAL PLANNED ACTUAL MECHANICAL PLANNED ACTUAL WIRING 100.00% 100.00% AIR COND 100.00% 99.53% SUBMAIN CABLE 100.00% 100.00% FIRE FIGHTING 78.13% 99.22% DB 100.00% 100.00% KITCHEN EQUIP. NA NA LUMINAIRE 96.52% 100.00% LPG INSTALL. NA NA MAIN S/BOARD 80.52% 100.00% COMPRES. AIR NA NA LPS NA NA DUST CONTROL NA NA PA NA NA PROCESS NA NA COOLING SMATV NA NA CCTV NA NA ICT NA NA
  55. 55. BANGUNAN SOKONGAN M&E PLANT ROOM – PUSAT SUMBER
  56. 56. BANGUNAN SOKONGAN M&E PLANT ROOM - BENGKEL
  57. 57. DECORATIVE FENCE
  58. 58. BANGUNAN SOKONGAN GARAJ KENDERAAN
  59. 59. ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK
  60. 60. RUMAH SAMPAH
  61. 61. LALUAN BERBUMBUNG
  62. 62. OPEN PLAZA
  63. 63. KERJA INFRA – JALAN UTAMA
  64. 64. GELANGGANG PERMAINAN
  65. 65. GELANGGANG PERMAINAN
  66. 66. PADANG PERMAINAN BOLA SEPAK
  67. 67. BENGKEL MIKRO - CLEANROON
  68. 68. M&E : AHU @ CLEAN ROOM
  69. 69. BENGKEL KEJ. BAHAN TERMAJU (SERAMIK) - EPOXY
  70. 70. PERABUT – PUSAT SUMBER
  71. 71. • SEKIAN TERIMA KASIH

×