Rooftop Solar System in Raheja Eternity, Mumbai

Download to read offline

In phases, they installed 85 kW Rooftop solar system. And they are proud to say that there was a reduction in energy consumption from more than 830 units per day to 340 units per day within a span of six months.

During recent summer, the electricity bill even came down even to Rs. 5000 from the initial bill of Rs.3,59,000 a year ago. And at the same time, the maintenance charges came down to around to Rs.10,500 per quarter in place of Rs.54,000.

In phases, they installed 85 kW Rooftop solar system. And they are proud to say that there was a reduction in energy consumption from more than 830 units per day to 340 units per day within a span of six months.

During recent summer, the electricity bill even came down even to Rs. 5000 from the initial bill of Rs.3,59,000 a year ago. And at the same time, the maintenance charges came down to around to Rs.10,500 per quarter in place of Rs.54,000.

Advertisement
Advertisement

More Related Content

Slideshows for you (18)

Similar to Rooftop Solar System in Raheja Eternity, Mumbai (20)

Advertisement

More from ADDA (20)

Recently uploaded (20)

Advertisement

Rooftop Solar System in Raheja Eternity, Mumbai

  1. 1. Energy Conservation/ Renewal Energy Initiatives Raheja Eternity Housing Society, Thakur Village, Kandivali (East), Mumbai 400101. 108-09-2018 Presented for ADDA Rise High Awards 2018
  2. 2. 2
  3. 3. Introduction Salient Features: ❖ Building has 229 flats with three wings and 20 floors. ❖ It is located just adjacent to National Park. ❖ It has an over all area of 5,10,000 sq ft with two levels below ground level for parking. ❖ Occupancy started from April 2016. ❖ Society formed in December 2016. 308-09-2018
  4. 4. Introduction Salient Features (cont…) ▪ On the month of Society Formation, the monthly maintenance charge was Rs. 18000/-. • It was in fact extremely high. • On examining, found the high cost of maintenance was due to the combination of various factors. • One of the them found was on: • Very High Energy Consumption at more than 25000 units/month • As a result, Very High Energy Bill at more than Rs. 3,60,000/- per month To control this energy factor, Immediate Initiatives on Energy Conservation and Renewal Energy Generation was initiated . 408-09-2018
  5. 5. View of Raheja Eternity 508-09-2018
  6. 6. Wholesomeness of the Initiatives • Initiatives taken that resulted in following fruitful results: • As on date the energy scenario is: • Energy consumption came down from 25900 to 6800 units/month • Energy bill came down from Rs. 3,59,280/- to Rs. 20,000/- per month 608-09-2018
  7. 7. Energy Conservation 708-09-2018
  8. 8. Energy Conservation 808-09-2018
  9. 9. Savings from Energy Conservation 908-09-2018
  10. 10. Initiatives on Energy Conservation in Dec -16 Month Action Initiated Dec-16 Regulations of high wattage lights in parking area ❖There were 541 high wattage tube lights in two levels ❖All of them were switched on for 24 hours ❖Selectively regulated the timings ❖50% of them were used for 12 hours and the rest for 24 hours ❖Energy conservation was in the tune of 70 units per day 1008-09-2018
  11. 11. Initiatives on Energy Conservation in Jan & Feb-17 Month Action Initiated Jan-17 & Feb-17 Replacement of entire high wattage tube lights with LEDs in parking area ❖There were 541 high wattage tube lights in two levels ❖All of them were replaced with LED bulbs ❖Identified and Isolated unwanted electrical loads ❖Replacement took 2 months ❖Energy conservation was in the tune of 235 units per day 1108-09-2018
  12. 12. Initiatives on Energy Conservation in Mar-17 Month Action Initiated Mar-17 Replacement of entire high wattage lights with LEDs in Lift Passages ❖There were 360 high wattage tube lights in 60 passages ❖All of them were replaced with LED bulbs ❖Replacement took more than one months ❖Energy conservation was in the tune of 165 units per day 1208-09-2018
  13. 13. Initiatives on Energy Conservation in Apr-17 Month Action Initiated Apr 17 Modification in Electric Circuit in stairs ❖There were 60 high wattage tube lights in stair cases ❖All of them were replaced with LED bulbs ❖Stair case lights were attached to the passage lights , running for 24 hours. ❖Modified the circuit and isolated the operation of stair lights ❖Regulated the time of operation of stair bulbs ❖Energy conservation was in the tune of 25 units per day 1308-09-2018
  14. 14. Initiatives on Energy Conservation in May-17 Month Action Initiated May 17 Energy Conservation in Elevators ❖There are nine large elevators . ❖Each Elevator had 6 high wattage tube lights. ❖Total there were 54 tube lights in 9 elevators, replaced with LEDs ❖Introduced sleep mode in the elevator electric circuit. ❖With this mode, lights are automatically switched off , if the lift is not used for more than a minute. ❖Energy conservation was in the tune of 87 units per day 1408-09-2018
  15. 15. Initiatives on Energy Conservation in June-17 Month Action Initiated June 17 Energy Conservation through Rooftop Solar ❖First phase of Rooftop Solar System( 65kw) commissioned. ❖The power generation is connected to Tata Power Grid. ❖During the month, there has been reduction in monthly energy bill by Rs. 50,000/- . ❖Renewal Energy generation through Solar System started. 1508-09-2018
  16. 16. Initiatives on Energy Conservation in July-17 Month Action Initiated July 17 & Aug 17 Energy Conservation through Installation of Motion Sensors & Second Phase of Solar System ❖Second phase of Rooftop Solar System(16.5 kw) erection started. ❖Meanwhile, installed 55 motion sensors on stairs for further conservation of energy. ❖Renewal Energy Generation further saved is 15 units/day 1608-09-2018
  17. 17. Initiatives on Energy Conservation in Sept-17 Month Action Initiated Sept 17 ❑ Energy Conservation through Installation of Second Phase of Solar System. ❑ Commissioned the 16.5 kw Solar System on 26/9/17. ❖With total installed capacity of 81.5 kw Solar System, the peak generation was 377 kwh ( units) per day. 1708-09-2018
  18. 18. Rooftop Solar & Residents’ Involvement 1808-09-2018
  19. 19. Execution Staff Involvement: The in-house staff were fully involved in executing: ❖ Removal of high wattage tube lights fittings. ❖ Fixing fittings for more than 600 LED bulbs ❖ Fixing of more than 55 Motion Sensors ❖ Regular weekly cleaning of Solar Panels ❖ Monitoring daily generation of energy from Solar 1908-09-2018
  20. 20. Execution Residents’ Involvement: There has been deep involvement of residents at different stages for: ➢ Procurement of LED products & Fittings ➢ Preparation of specs for Rooftop Solar and getting them vetted through TERI, Delhi and awarding the job. ➢ Obtaining approval from M/s Tata Power prior to installation of Solar System. ➢ Replacement with LED bulbs and erection of Rooftop Solar. Moreover, nothing would have been possible without the approval of residents in AGMs. 2008-09-2018
  21. 21. Reduction in CO2 Emission (Tons/Month) 2108-09-2018
  22. 22. Month wise Energy Consumption since inception(units) 2208-09-2018
  23. 23. Impact • Environmental: ➢Reduction in Emission of CO2 by 66% ➢Reduction on Energy Consumption by 74% • Social: ➢Highly impacted to the residents near by to replicate such steps on Energy Conservation ➢Society Children have been highly energised and self motivated to sustain the movement. • Financial: ➢Saving in terms of monthly energy bills by 94% ➢One of the major contributors in the Reduction of Maintenance Bill by 78%, from Rs. 18000/- per month in Dec 16 to 4000/- per month as on date. 2308-09-2018
  24. 24. Thank you very much Raheja Eternity, Thakur Village, Mumbai 2408-09-2018

×