BAROMETRIC METHOD<br />By-<br />       ANKIT JAISWAL<br />       ANJUM FATIMA<br />       ANJANA<br />       ANIL KUMAR<br...
What is ARIMA Method?<br />2<br />
   ARIMA Method we can also called BOX-JENKIN TECHNIQUE . <br />   Box-Jenkins method of forecasting is used for short ter...
What is BAROMETRIC METHOD ?<br />4<br />
Techniques of Demand Forecasting<br />Trand projection<br />5<br />Baromatric Method<br />Econometric Method<br />
BAROMETRIC METHOD<br />The basic approach of barometer technique is to construct an index of relevant economic indicators ...
 The indicators used in Barometric Method<br />Leading indicators<br />Coincidental indicators<br />Lagging indicators<br ...
Leading indicators<br />consists of indicators which move up and down ahead of some other series.<br />E.g. => (i) index o...
Coincidental indicators<br />The ones that move up and down simultaneously with the level of economic activity. <br />E.g....
Lagging indicators<br />Lagging indicators consists of those indicators which follow a change after some time lag. <br />E...
BUSINESS  CYCLELeading indicators precede(Lead) Business cycles’ Turning points (i.e., peaks and troughs), coincident indi...
Barometric Example<br />Development and allotment of land by Delhi Development Authority to <br />    Group Housing Societ...
DISADVANTAGE<br />At best , Barometric forecasting is only 80 to 90 percent accurate in forecasting turning poing.<br />13...
THANK YOU<br />14<br />
Upcoming SlideShare
Loading in …5
×

Barometric method1

426 views

Published on

only barometric method

Published in: Education, Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
426
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Barometric method1

  1. 1. BAROMETRIC METHOD<br />By-<br /> ANKIT JAISWAL<br /> ANJUM FATIMA<br /> ANJANA<br /> ANIL KUMAR<br />ANSHITA SRIVASTAVA<br />1<br />
  2. 2. What is ARIMA Method?<br />2<br />
  3. 3. ARIMA Method we can also called BOX-JENKIN TECHNIQUE . <br /> Box-Jenkins method of forecasting is used for short term predictions.<br />3<br />
  4. 4. What is BAROMETRIC METHOD ?<br />4<br />
  5. 5. Techniques of Demand Forecasting<br />Trand projection<br />5<br />Baromatric Method<br />Econometric Method<br />
  6. 6. BAROMETRIC METHOD<br />The basic approach of barometer technique is to construct an index of relevant economic indicators and to forecast future trends on the basis of movements in the index of economic indicators.<br />6<br />
  7. 7.  The indicators used in Barometric Method<br />Leading indicators<br />Coincidental indicators<br />Lagging indicators<br />7<br />
  8. 8. Leading indicators<br />consists of indicators which move up and down ahead of some other series.<br />E.g. => (i) index of net business formation:<br />(ii) New building permits:<br />(iii) New orders for durable goods:<br />(iv) Corporate profit after tax, etc..<br />8<br />
  9. 9. Coincidental indicators<br />The ones that move up and down simultaneously with the level of economic activity. <br />E.g.=> (i) number of employees in the non- agricultural sector:<br />(ii) rate of unemployment:<br />(iii) sales recorded by the manufacturing, trading and the retail sectors etc.<br />9<br />
  10. 10. Lagging indicators<br />Lagging indicators consists of those indicators which follow a change after some time lag. <br />E.g. => (i) labour cost per unit of manufactured<br /> output:<br />(ii) Out Standing loans:<br />(iii) lending rate for short-term loans etc.<br />10<br />
  11. 11. BUSINESS CYCLELeading indicators precede(Lead) Business cycles’ Turning points (i.e., peaks and troughs), coincident indicators move in step with business cycle, while lagging indicators follow or lag turning points in business cycle.<br />11<br />
  12. 12. Barometric Example<br />Development and allotment of land by Delhi Development Authority to <br /> Group Housing Societies (a lead indicator) indicates higher demand prospects for cement, steel and other construction material (coincidental indicators) and increase in housing loan distribution (lagging indicators).<br />12<br />
  13. 13. DISADVANTAGE<br />At best , Barometric forecasting is only 80 to 90 percent accurate in forecasting turning poing.<br />13<br />
  14. 14. THANK YOU<br />14<br />

×