Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

St George Cathedral renovation proposal

414 views

Published on

A proposal for renovating the St. George Orthodox Syrian Cathedral in Trivandrum

Published in: Spiritual
  • Be the first to comment

St George Cathedral renovation proposal

  1. 1. Renovation Proposal
  2. 2. Church Office Hall Res 1 Res 2 Note: Drawing for representation purpose only, not to scale
  3. 3. N Church Office Hall Res 1 Res 2 Note: Drawing for representation purpose only, not to scale Multi Level Church Building First Floor - Church Ground Floor - Multipurpose Hall Basement Parking - 2 Levels Residential cum Office Block 4 Floors + Basement Parking - 2 Levels
  4. 4. Parking L1 L2 Multipurpose Hall Ground Floor Church - 1st Floor
  5. 5. Note: Image for representation purpose only, not to scale
  6. 6. Note: Image for representation purpose only, not to scale
  7. 7.  Church on 1st floor to accommodate 1,000 persons  1,000 pax capacity multipurpose hall in ground floor  Ramp & Lift for elderly / physically challenged  Basement car parking, in two levels  Parking space to be made hourly ‘Pay n Park’ during week days for general public  Steady source of income for church
  8. 8. Office cum Residential Building (4 + 2 Basement)  Offices for Church, Sunday School,Youth, Martha Maria Samajam (Ground)  Residences forVicar, AssistantVicars & Sextons (4 or 5 units in two floors)  Committee Meeting Room  Guest Room for visiting Bishops / Priests  Pantry (for catering in Hall)  Please note basement parking will be common for both buildings
  9. 9.  Actual design and plan to be finalised by professional Architects based on our inputs  The focus should be on utility rather than on show off  We should go for a landmark building preferably Shankar design or by Nirmiti Kendra References:  St. Peters Jacobite Church,Tvm  St. Geoge Orthodox Church, Palarivattom  Both churches don’t have basement parking
  10. 10. Remember  Opposition comes from people who do not want any change  We need to convince people about the need for a bigger church  We owe it to the next generation  If Parumala Palli can be rebuilt, we can also do this
  11. 11. Points for Discussion  Alternate arrangements for Holy Qurbana & other services during construction time  Alternate arrangements for stay ofVicar & Sextons  Getting permissions
  12. 12. Thank you Prepared by Anil PhilipVarghese Mob.: 9495118226

×