Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau Veritas (China)
Initial Proposal - Level 3 Sch...
Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau VERITAS (China)
Schedule Risk Analysis - Maintain Critical Path to 1st Oil
Proposed Method Flowchart
Saturday, 16 March 2013 Produced By A...
Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau Veritas (China)
Appendix 1 – Field Development...
Upcoming SlideShare
Loading in …5
×

CNOOC QHD 36 FIELD REDEVELOPMENT SCHEDULE RISK ANALYTICS CONCEPT RISK SCHEMATIC

212 views

Published on

Angus Macleod MAPM IPMA (Associate)

Senior Project Controls Manager (Energy)
Value Assurance & Risk SME

+447407630733 (Mobile Phone)

https://www.linkedin.com/in/pcm2016

angusmacleod53@gmail.com

Published in: Business
  • Be the first to comment

CNOOC QHD 36 FIELD REDEVELOPMENT SCHEDULE RISK ANALYTICS CONCEPT RISK SCHEMATIC

  1. 1. Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau Veritas (China) Initial Proposal - Level 3 Schedule Risk Analysis High Level Schematic of Workflow (Highlighting Execution Phase) Bohai Bay QHD 32-6 Stage 2 Engineering. Fabrication, Installation & Commissioning 4 x Offshore Platforms , Piles + Conductors Topsides including Drilling modules, + Living Quarters + Associated Systems
  2. 2. Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau VERITAS (China)
  3. 3. Schedule Risk Analysis - Maintain Critical Path to 1st Oil Proposed Method Flowchart Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau VERITAS (China) Quarterly SRA Review / Update
  4. 4. Saturday, 16 March 2013 Produced By Angus Macleod MAPM for CNOOC via Bureau Veritas (China) Appendix 1 – Field Development Sketch – QHD 32-6 Stage 2

×