  1. 1. BY: GROUP 5
  2. 2. DIST. IN CHART TIME IN MINS. PROCESS DESCRIPTIONS FEET SYMBOLS 18 0:10.22 methods lab. before the bottom stairs 32 0:17.35 bottom of the stairs to the top of the stairs 32 0:16.32 stairs to the entrance door of the basement 6 0:05.03 entrance door of the basement going down the stairs 5 0:06.32 bottom of the stairs to the engineering lobby 140 1:04.07 engineering lobby to the stairs of San Jose building 49 0:14.25 bottom stairs going up to the library entrance
  3. 3. - - open the door27 0:06.08 library entrance to OPAC - 0:55.15 searching in OPAC141 2:44.11 OPAC to bookshelf - 1:11.59 finding the book27 0:08.35 bookshelf to the counter - 0:21.00 counter-clearing the book
  4. 4. 105 3:04.00 counter to exit library - 0:05.00 exit library - - open the door69 1:09.00 exit library to hallway23 0:30.40 top stairs going down to the entrance basement27 0:27.00 entrance door of the basement to the top of the stairs30 0:40.33 from the top of the stairs to the bottom of the stairs20 0:20.22 bottom of the stairs to the Methods lab.
  5. 5. SAN JOSE BLDG. DRIVEWAY ENGINEERING LOBBYMETHODS ENTRANCELAB. BASEMENT
  6. 6. COUNTER OPAC ENTRANCE LIBRARYEXIT STAIRSLIBRARY
  7. 7. HALLWAYMETHODSLAB ENTRANCE BASEMENT STAIRS
  8. 8. DIST. IN TIME IN CHART PROCESS DESCRIPTIONS FEET MINS. SYMBOLS 19 0:9.41 Methods lab to bottom stairs 31 0:44.30 bottom stairs to the top stairs 26 0:17.05 top stairs to the entrance basement 22 0:14.07 entrance basement to the top stairs 87 0:59.16 top stairs to the proposed entrance library open the door
  9. 9. 5 0:04.01 entrance library to the proposed OPAC 0:15.41 searching books in OPAC45 0:43.13 OPAC to shelves 0:08.32 finding the book60 0:44.03 shelves to the proposed counter 0:19.12 counter clearing20 0:12.01 counter to exit library
  10. 10. 0:05.00 exit library open the door80 0:41.12 exit library to hallway26 0:13.41 top stairs going down to entrance basement25 0:12.01 entrance basement to the top stairs31 0:15.18 top stairs to bottom stairs15 0:08.24 bottom stairs to methods lab.
  11. 11. HALLWAYMETHODSLAB ENTRANCE BASEMENT STAIRS
  12. 12. COUNTER OPAC ENTRANCE LIBRARYP C PROPOSEDR O EXITO UP NO TS EE RD OPAC STAIRSPROPOSED EXIT ENTRANCE
  13. 13. HALLWAYMETHODSLAB ENTRANCE BASEMENT STAIRS
  14. 14. ELEMENTS PRESENT METHOD PROPOSED METHOD DIFFERENCE TIME TIME TIME STEPS STEPS STEPS ALLOTTED ALLOTTED ALLOTTED OPERATION 5 2:08.14 5 0:43.25 0 1:25.29TRANSPORTATION 16 10:23.05 14 5:37.13 2 4:46.32 INSPECTION 2 0:25.00 2 0:24.12 0 0:0.88 DELAY 4 2:33.14 4 0:48.25 0 1:45.29 STORAGE TOTAL 27 15:29.33 25 9:33.15 2 7:58.18

×