Beck Technology
<ul><li>An integrated model for analysis: </li></ul><ul><ul><li>Fast and Easy Modeling </li></ul></ul><ul><ul><li>Real-Tim...
Fast and Easy Modeling
Real Time Estimating Costs adapt live as  the model evolves
<ul><li>Eliminate assumption gaps </li></ul><ul><li>Simple models with detailed cost information </li></ul><ul><li>Save no...
<ul><li>Order of magnitude impact of variables such as site orientation, building shape, cladding material properties, gla...
<ul><li>Cut and Fill costs </li></ul><ul><li>Soil strata information and cost calculated if known </li></ul><ul><li>Import...
<ul><li>Extremely fast and easy </li></ul><ul><li>Simulate Phasing </li></ul><ul><li>Shows cost spent over time </li></ul>...
Accurate Consistently 1-3%
Faster/More Accurate Analysis of Alternatives
Improved Transparency & Communication
Example Projects
Example: Residential Tower
Base Model Stories 8 Gross Area 12,617 m 2 Solid 7,688 m 2 Glazing 823 m 2 1 BR 51 units 2 BR 22 units 3 BR 3 units A $1,7...
Example: Export to Google Earth
Example: Contractor Proposal Evaluation Contractor 1 Proposal Contractor 2 Proposal Owner Baseline Planning Model See cost...
Retail Hospitality Office Mixed Use Renovation Medical Interiors Industrial Other Examples
Upcoming SlideShare
Loading in …5
×

DProfiler Software

2,049 views

Published on

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,049
On SlideShare
0
From Embeds
0
Number of Embeds
880
Actions
Shares
0
Downloads
13
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • Add target store image
  • DProfiler Software

    1. 1. Beck Technology
    2. 2. <ul><li>An integrated model for analysis: </li></ul><ul><ul><li>Fast and Easy Modeling </li></ul></ul><ul><ul><li>Real-Time Estimating </li></ul></ul><ul><ul><li>Energy Analysis </li></ul></ul><ul><ul><li>Site Cut/Fill Cost Calculation </li></ul></ul><ul><ul><li>Sequencing with Cash-flow </li></ul></ul><ul><ul><li>Real-Time Excel Dashboard </li></ul></ul>DProfiler Macro BIM Software
    3. 3. Fast and Easy Modeling
    4. 4. Real Time Estimating Costs adapt live as the model evolves
    5. 5. <ul><li>Eliminate assumption gaps </li></ul><ul><li>Simple models with detailed cost information </li></ul><ul><li>Save notes and images in model </li></ul>Floor Plan Lo-Fidelity Model with Hi-Fidelity Data
    6. 6. <ul><li>Order of magnitude impact of variables such as site orientation, building shape, cladding material properties, glazing percentages, ect. </li></ul><ul><li>Uses DOE2 engine and can export to Equest </li></ul><ul><li>Configured to local weather data globally </li></ul><ul><li>Extremely easy to use </li></ul>Energy Analysis
    7. 7. <ul><li>Cut and Fill costs </li></ul><ul><li>Soil strata information and cost calculated if known </li></ul><ul><li>Import cad or Google Earth </li></ul><ul><li>Excellent for site feasibility studies </li></ul>Conceptual Sitework Analysis
    8. 8. <ul><li>Extremely fast and easy </li></ul><ul><li>Simulate Phasing </li></ul><ul><li>Shows cost spent over time </li></ul><ul><li>Bi-Directional to Excel </li></ul>Sequencing and Phasing
    9. 9. Accurate Consistently 1-3%
    10. 10. Faster/More Accurate Analysis of Alternatives
    11. 11. Improved Transparency & Communication
    12. 12. Example Projects
    13. 13. Example: Residential Tower
    14. 14. Base Model Stories 8 Gross Area 12,617 m 2 Solid 7,688 m 2 Glazing 823 m 2 1 BR 51 units 2 BR 22 units 3 BR 3 units A $1,781,357 B $15,572,822 C $6,921,135 D $8,521,098 E $2,533,228 TOTAL $35,329,639 Enlarged Footprint Stories 8 Gross Area 16,828 m 2 Solid 10,971 m 2 Glazing 1,109 m 2 1 BR 83 units 2 BR 22 units 3 BR 3 units A $2,350,030 B $20,312,564 C $9,640,019 D $14,088,003 E $4,190,785 TOTAL $50,581,404 Remove Balconies Stories 8 Gross Area 12,617 m 2 Solid 6,698 m 2 Glazing 1,043 m 2 1 BR 51 units 2 BR 22 units 3 BR 3 units A $1,781,357 B $13,262,771 C $6,921,135 D $8,521,098 E $2,461,027 TOTAL $32,947,388 Reduce Number Floors Stories 5 Gross Area 7,925 m 2 Solid 4,650 m 2 Glazing 661 m 2 1 BR 35 units 2 BR 14 units 3 BR 0 units A $1713,547 B $8,498,277 C $4,272,953 D $7,759,129 E $1,535,552 TOTAL $23,779,459 Example: What-ifs
    15. 15. Example: Export to Google Earth
    16. 16. Example: Contractor Proposal Evaluation Contractor 1 Proposal Contractor 2 Proposal Owner Baseline Planning Model See cost variance by date Visualize sequence and detect clashes
    17. 17. Retail Hospitality Office Mixed Use Renovation Medical Interiors Industrial Other Examples

    ×