Statistics from Alonso de Madrigal for AIMS

4,676 views

Published on

Students working on statistics

Published in: Technology, Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
4,676
On SlideShare
0
From Embeds
0
Number of Embeds
4,066
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Statistics from Alonso de Madrigal for AIMS

  1. 1. THE SURVEY Activity included in the unit of Descriptive Statistics miércoles 18 de diciembre de 2013
  2. 2. * Bilingual Section IES Alonso de Madrigal This activity has been accomplished by the 4th ESO bilingual section students miércoles 18 de diciembre de 2013
  3. 3. Activity objetive: Understanding the concept of survey in all the stages: • • • Design. Data collection. Processing and presentation of statistical results. This activity will also promote teamwork and the use of IT tools (Excel , power point ) miércoles 18 de diciembre de 2013
  4. 4. Day 1 : Designing the survey • Students are introduced to the activity : they have to design a survey to poll their school mates about different questions, the respondents will be the 3rd and 4th of ESO (stundents betweent 14 and 15 years old) • We group the students in teams of 2 or 3 students . • Designing the survey. We establish three thematic sections on the board. Block 1 : Personal household, habits, Hhusekeeping. Block 2: Work and leisure habits . ( sports , TV , computer, playstation, hours  study, reading, Social Networking ... ) Block 3 : alcohol, tobacco , sexuality. We share the teams in the three blocks, giving them 10 minutes to write in their assigned block issues with these premises: Questions should be simple and clear , with CLOSED answers which should collect all possible opinions . It Is the moment to discuss the students’ proponsals, first we appoint a secretary who will remain on the board writing the conclusions First couple of block 1 will tell us their issues raised, after having checked all of them we select the best ones and it´s time for the nex team which should provide only new issues. Once we have a selection of 4 approved issues we proceed with blocks 2 and 3 in a similar way. miércoles 18 de diciembre de 2013
  5. 5. Day 2 : Preparing the Data collecting day The group itself fill the pilot survey to assess the time spent and failures that might appear.  It Is the moment to prepare the logistic for the data collection day, groups assignements and to define the acting protocol: Activity: Students should think and write about how they thik it should be done. We discuss and conclude a plan.  THE BRIEFING: What information to give respondents and how to give it. Our goal here is to inform respondents about what we pretend with the survey and the importance of the sincerity in their answers: • Surveys are completely anonymous . • Interviewers will collect surveys ( that way we will discriminate male and female) . miércoles 18 de diciembre de 2013
  6. 6. Day 3 : Data collecting day Pollsters on stage will give a brief collection of instructions to respondents : Given the nature of some of the questions, during the fullfilling time the pollsters must avoid intimidating students respondents keeping a distance. miércoles 18 de diciembre de 2013
  7. 7. Day 4 and 5 : Data procesing day In the computer lab students continue performing the data counting and procesing (excel sheet designed for this purpose) to obtain the results. miércoles 18 de diciembre de 2013
  8. 8. 3º IC T TS TS) UL EN ES UD R IS RS O T A TA E S 14 ( Y miércoles 18 de diciembre de 2013 LD ST SO E
  9. 9. miércoles 18 de diciembre de 2013
  10. 10. miércoles 18 de diciembre de 2013
  11. 11. miércoles 18 de diciembre de 2013
  12. 12. miércoles 18 de diciembre de 2013
  13. 13. miércoles 18 de diciembre de 2013
  14. 14. 4º IC T TS TS) L N SU DE E U R IS RS O T A TA E S 15 ( Y miércoles 18 de diciembre de 2013 LD ST SO E
  15. 15. miércoles 18 de diciembre de 2013
  16. 16. miércoles 18 de diciembre de 2013
  17. 17. miércoles 18 de diciembre de 2013
  18. 18. miércoles 18 de diciembre de 2013

×