King Street Staion: 3rd floor walls demolition

  1. 1. King Street Station Rehabilitation Project Phase 2 – June Update<br />Contractor mobilized in May and started demolition work in various areas at the station including first floor and third floor.    All the original marble pieces in the restaurant area have been removed and cataloged for storage.  They will be used for the next phase.  All interior partitions of the second and third floor will be removed.    The demolition phase of the project will last for 2 months.<br />
  2. 2. Current baggage area, previously used as a restaurant<br />
  3. 3. Current baggage area, previously used as a restaurant<br />
  4. 4. 3rd floor with interior partitions removed looking Northwest<br />
  5. 5. 3rd floor with interior partitions removed looking North<br />
  6. 6. 3rd floor with interior partitions removed looking South<br />
  7. 7. 3rd floor with interior partitions removed looking Northeast<br />
  8. 8. 3rd floor with interior partitions removed looking Northwest<br />
  9. 9. 3rd floor with interior partitions removed looking Northwest and upward towards the 4th floor attic<br />
  10. 10. 4th floor attic looking North<br />
  11. 11. 4rd floor attic looking south <br />
  12. 12. 3rd floor interior partitions demolition <br />
  13. 13. 3rd interior partitions demolition <br />

×