A Template for Self-Implementing a Non-Waste
Determination Under the Non-Hazardous
Secondary Materials (NHSM) Rule
Present...
A Typical Scenario





2

Alternate Fuel Supplied by Third Party Vendor
Biomass Component
Post Consumer Component

You...
How Do I Document My NHSM?





3

DIY
Vendor
Third-Party Consultant

Your environmental compliance is clearly our busi...
Documentation Includes




4

Sufficient Processing of NHSM
Demonstrating Legitimacy Criteria are Met

Your environmenta...
NHSM Non-Waste Legitimacy Criteria





5

Managed as a Valuable Commodity
Meaningful Heat Content
Comparable Contamina...
Engineered Fuel with Specifications for







6

BTU Content
Sizing
Moisture Level
Minimal Dusting
Metals Removal

Y...
HAPs, HAP Precursors Testing




7

Include What You Know to be There
Exclude What You Know Not to be There

Your enviro...
Homogeneous Nature of NHSM




8

Amount of Sampling Required
Data In Lieu of Sampling (Fuel Vendor’s
Information)

Your...
Boiler MACT Recordkeeping





9

Documentation of the NHSM Processing
(required)
Documentation of Legitimacy Criteria ...
Costs for Self Determinations




10

Analytical Costs $1,500 for 70 Contaminants
Third-Party Preparation Budget $17,500...
Timeline to Complete a Self Determination






11

4-6 weeks To Build the Demonstration
2-4 weeks for Analytical Resul...
Self Determinations are in Your File Cabinet



12

“…persons who burn NHSM are ultimately
responsible.”

Your environmen...
1054 Days and Counting
(it’s a Sunday by the way)

Dan Holland| dholland@all4inc.com | 610-933-5246 ext 15
March 13, 2013
...
Upcoming SlideShare
Loading in …5
×

Self-Implementing a Non-Waste Determination Under the Non-Hazardous Secondary Materials (NHSM) Rule

762 views

Published on

Dan Holland of All4 Inc. presents "A Template for Self-Implementing a Non-Waste Determination Under the Non-Hazardous Secondary Materials (NHSM) Rule." The presentation covers documentation, non-waste legitimacy criteria, and provides a basic timeline to complete self determination.

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
762
On SlideShare
0
From Embeds
0
Number of Embeds
244
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Self-Implementing a Non-Waste Determination Under the Non-Hazardous Secondary Materials (NHSM) Rule

  1. 1. A Template for Self-Implementing a Non-Waste Determination Under the Non-Hazardous Secondary Materials (NHSM) Rule Presented to the AF&PA, NCASI AND AWC BOILER MACT WORKSHOP by All4 Inc. Dan Holland| dholland@all4inc.com | 610-933-5246 ext 15 March 13, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Columbus, GA | 706.221.7688
  2. 2. A Typical Scenario    2 Alternate Fuel Supplied by Third Party Vendor Biomass Component Post Consumer Component Your environmental compliance is clearly our business.
  3. 3. How Do I Document My NHSM?    3 DIY Vendor Third-Party Consultant Your environmental compliance is clearly our business.
  4. 4. Documentation Includes   4 Sufficient Processing of NHSM Demonstrating Legitimacy Criteria are Met Your environmental compliance is clearly our business.
  5. 5. NHSM Non-Waste Legitimacy Criteria    5 Managed as a Valuable Commodity Meaningful Heat Content Comparable Contaminant Levels Your environmental compliance is clearly our business.
  6. 6. Engineered Fuel with Specifications for      6 BTU Content Sizing Moisture Level Minimal Dusting Metals Removal Your environmental compliance is clearly our business.
  7. 7. HAPs, HAP Precursors Testing   7 Include What You Know to be There Exclude What You Know Not to be There Your environmental compliance is clearly our business.
  8. 8. Homogeneous Nature of NHSM   8 Amount of Sampling Required Data In Lieu of Sampling (Fuel Vendor’s Information) Your environmental compliance is clearly our business.
  9. 9. Boiler MACT Recordkeeping    9 Documentation of the NHSM Processing (required) Documentation of Legitimacy Criteria (suggested) Documentation of Changes to NHSM (suggested) Your environmental compliance is clearly our business.
  10. 10. Costs for Self Determinations   10 Analytical Costs $1,500 for 70 Contaminants Third-Party Preparation Budget $17,500 Your environmental compliance is clearly our business.
  11. 11. Timeline to Complete a Self Determination    11 4-6 weeks To Build the Demonstration 2-4 weeks for Analytical Results Comfort Letters Take 6-12 Months Your environmental compliance is clearly our business.
  12. 12. Self Determinations are in Your File Cabinet  12 “…persons who burn NHSM are ultimately responsible.” Your environmental compliance is clearly our business.
  13. 13. 1054 Days and Counting (it’s a Sunday by the way) Dan Holland| dholland@all4inc.com | 610-933-5246 ext 15 March 13, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Columbus, GA | 706.221.7688

×