accomplishments

398 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
398
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

accomplishments

  1. 1. Brgy. Julio Ouano<br />Project Cost: 1,700,000.00<br />Source of Fund: 20% Development Fund<br />
  2. 2. CONCRETE LINE CANAL<br />Brgy. JULIO OUANO<br />Project Cost: 411,000.00<br />Source of Fund:<br />20% Development Fund<br />
  3. 3. PUBLIC COMFORT ROOMS<br />OUTSIDE OF CR<br />Project Cost: 180,000.00<br />Source of Fund: 20% Development Fund<br />INSIDE OF CR<br />
  4. 4. Street lights Installation at the National<br />Highway from Brgy. Gamutonto Brgy. San Pedro<br />Project Cost: 350,000.00<br />Source Of fund: 20% Development Fund<br />
  5. 5. TB Room<br />Project Cost: 35,000.00<br />Source of Fund 20% Development Fund<br />Birthing Clinic<br />Project Cost: 80,000.00<br />Source of Fund: 20% Development Fund<br />
  6. 6. ALEGRIACOMMERCIAL CENTER<br />
  7. 7. CRISIS INTERVENTION AND <br />LIVELIHOOD TRAINING CENTER<br />Project Cost: 500,000.00<br />Source of Funds: SNPIDA World Vision Australia<br />Rev. Fr. Nick officiates the blessing of 4 units sewing machine for Alegria Livelihood Center<br />
  8. 8. CONSTRUCTION OF THE MUNICIPAL DEVELOPMENT TRAINING CENTER<br />
  9. 9. ALEGRIA COMMUNITY STAGE AND BASKETBALL COURT BLEACHERS<br />
  10. 10. CONSTRUCTION OF BRGY. POBLACION GYMNASIUM/BASKETBALL COVERED COURT<br />
  11. 11. Tennis Court (Solar Dryer)<br />Project Cost: 100,000.00<br />Source of Fund: DA/LGU Alegria Equity<br />
  12. 12. Poblacion to Danao Road<br />Bgry. Poblacion Fish Port<br />Project Cost: 5,100,000.00<br />Source of Funds: DA / LGU-Alegria<br />
  13. 13.
  14. 14. Pongtud Potable Water System Level II<br />Project Cost: 3,883,310.80<br />Source of Fund: IFAD-NMCIREMP/ LGU Alegria<br />
  15. 15. Alipao Potable Water System Level II<br />Project Cost: 1,500,000.00<br />Source of Fund: IFAD-NMCIREMP/ LGU Alegria<br />
  16. 16.
  17. 17.
  18. 18.
  19. 19.
  20. 20.
  21. 21. Newly completed Classroom Bldng. w/ Built in Comfort Room in Brgy. Budlingin<br />Project Cost: 1,800,000.00<br />Source of Fund: Kalahi- Kalayaan through the Engineering Batallion of the Phil. Army<br />
  22. 22. Mayor Esma launches PACAP-PLEASE Project for Budlingin and Camp Eduard,<br />
  23. 23. Concreting of 0.8 km of FMR at Brgy. Budlingin<br />Project Cost: 2,800,000.00<br />Source of Fund: DAR-IFAD NMCIREMP / LGU-Alegria<br />
  24. 24. COMPLETED ALIPAO GYMNASIUM / BASKETBALL COVERED COURT<br />Project Cost: 1,850,000.00<br />Source of funds: Congressional Funds of Former Congressman Ace Barbers and Incumbent Cong. Guillermo Romarate, Jr.<br />
  25. 25. COMPLETED PONGTUD GYMNASIUM / BASKETBALL COVERED COURT<br />Project Cost: 1,850,000.00<br />Source of funds: Congressional Funds of Former Congressman Ace Barbers and Incumbent Cong. Guillermo Romarate, Jr.<br />
  26. 26. ONE UNIT CLASSROOM BUILDING<br />Located at ANHS<br />Project Cost: <br />Php 570,000.00<br />Source of Fund:<br />SNPIDA-World Vision Australia<br />
  27. 27.
  28. 28. ON-GOING CONSTRUCTION OF BUS TERMINAL<br />Project Cost: 9,870,000.00<br />Source of fund: DOF-MDFO /LGU Alegria<br />
  29. 29. ONGOING CONSTRUCTION OF OUR NEW MUNICIPAL BUILDING<br />Project Cost: 15,000,000.00<br />Source of fund: Congressional/Senatorial CDF Funds<br />
  30. 30. COMPLETED SAN PEDRO BRGY. HALL<br />
  31. 31. POCTOY BOAT LANDING<br />Project Cost: 3,251,575.00<br />Source of Funds: <br /><ul><li> USAID GEM &
  32. 32. PDAF Equity of Cong. Romarate</li></li></ul><li>CAMP EDWARD FMR<br />
  33. 33. ONGOING CONSTRUCTION OF JULIO OUANO<br /> WATER RESERVOIR<br />
  34. 34. CAMP EDWARD TRADING CENTER<br />

×