ARS Coaches PD - August 2010

514 views

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
514
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

ARS Coaches PD - August 2010

  1. 1. Getting Started Coach PD August 25, 2010
  2. 2. Where We Were <ul><li>June 1 notes… </li></ul><ul><li>Noted progress made on DEW ratings; focus on room design </li></ul><ul><li>Revised shared book; read aloud protocols to include ratings (0-3) </li></ul><ul><li>Revised approach to Topic Studies </li></ul><ul><li>Discussed coursework for Fall </li></ul><ul><li>Discussed PreK-K Council; Collaboratory </li></ul>
  3. 3. Where We Are <ul><li>Summary of Assessment Results </li></ul><ul><li>Protocol Revisions </li></ul><ul><li>Sept8-Oct4 Settings; ELLCO; CLASS training </li></ul><ul><li>Curriculum: Topic Studies Format; Schedule </li></ul><ul><li>R&D in 2010-11 </li></ul><ul><ul><li>eBook </li></ul></ul><ul><ul><li>Tier 2 Intervention Say-Tell-Do-Play </li></ul></ul><ul><li>Play Planning October Training </li></ul>
  4. 4. Summary of Assessment Results *outperformed control on all tasks <ul><li>PPVT: ≈ 93 benchmark: 85 </li></ul><ul><li>GRR: ≈ 12 benchmark: 14 </li></ul><ul><li>ALL-BC ≈ 6 benchmark: 15 </li></ul><ul><li>ALL-BH ≈ 3 benchmark: 3 </li></ul><ul><li>ALL-ALK ≈ 7 benchmark: 15 </li></ul><ul><li>ALL-RN ≈ 90 benchmark: <105 </li></ul><ul><li>GGG-R ≈ 10 benchmark: 7 </li></ul><ul><li>GGG-A ≈ 7 benchmark: 5 </li></ul>
  5. 5. Protocol Revisions <ul><li>Shared Book (21 items) </li></ul><ul><li>Read Aloud (15 items) </li></ul><ul><li>http://akronreadysteps.ning.com </li></ul>
  6. 6. Sept8-Oct4 Activities <ul><li>Room arrangement </li></ul><ul><li>ELLCO baseline </li></ul><ul><li>CLASS training Sept 15-17 </li></ul><ul><li>Tutorial schedule </li></ul><ul><li>Curriculum prep </li></ul><ul><ul><li>Water Pipes </li></ul></ul><ul><ul><li>Play centers </li></ul></ul>
  7. 7. Topic Studies <ul><li>Oct4-Nov24: Water Pipes </li></ul><ul><li>Nov29-Jan28: Buildings </li></ul><ul><li>Jan31-Mar25: Wheels </li></ul><ul><li>Mar28-May19: Flowers </li></ul>
  8. 8. Water Pipes Topic Study Walk-Through
  9. 9. R & D <ul><li>e-Book </li></ul><ul><li>4 classrooms </li></ul><ul><li>4 phases; 6 weeks @ </li></ul><ul><ul><li>e-book quality </li></ul></ul><ul><ul><li>Physical Place </li></ul></ul><ul><ul><li>Engagement </li></ul></ul><ul><ul><li>Instruction </li></ul></ul><ul><li>4 teachers; small groups of children </li></ul><ul><li>Training: TBD </li></ul><ul><li>[ms submitted for review] </li></ul><ul><li>Tier 2 Intervention </li></ul><ul><li>say-tell-do-play </li></ul><ul><li>All classrooms </li></ul><ul><li><85 ss on PPVT </li></ul><ul><li>Specified Read Alouds + voc + play activities </li></ul><ul><li>Coaches > Teachers > Teacher Assistants </li></ul><ul><li>4 weeks@ </li></ul><ul><li>Training: Sept 2; Sept 17 </li></ul>
  10. 10. Play Planning

×