Lepanto Slideshow

2,173 views

Published on

A conceptual design for an exhibit booth for a major tile company

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,173
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
14
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Lepanto Slideshow

  1. 1. DISPLAY MODULES DESIGN&PRESENTATION: ARKIASIA PROJECT STUDY: PROPOSED EXHIBIT AREA LOCATION: WORLDBEX-WTC OWNER: LCI FRAMING CONCEPTUAL DESIGN EXHIBIT AREA IMAGINE CREATE INNOVATE
  2. 2. 1 I.PROJECT OVERVIEW EXHIBIT AREA TO CONCEPTAULIZE AN EXHIBIT AREA WITHIN AN EXPOSITION HALL. THE AREA CONSISTS OF 5 UNITS 2MTR X 3MTR BOOTHS WITH A TOTAL MEASUREMENT OF 6MTR X 10MTR EQUIVALENT TO 60 SQM OF EXHIBIT AREA. THE EXHIBIT AREA IS LOCATED ON THE LEFT SIDE OF THE MAIN ENTRANCE OF THE EXPO AREA AND IS BOUNDED ON ALL SIDES BY EXHIBIT WALKWAYS. THE CLIENT, LEPANTO CERAMICS INC-LEPANTO TILES, A LEADER IN THE CERAMIC TILE INDUSTRY, WILL BE SHOWCASING THEIR EXISTING PRODUCTS PLUS SOME NEW TILE MODELS DURING THE EXPOSITION DATES.
  3. 3. 2 II. DESIGN CONCEPT EXHIBIT AREA <ul><li>TILES, A LOT OF FLOOR AND WALL TILES, THE CONVENTIONAL APPROACH IF TASKED TO EXHIBIT TILES, WOULD BE TO USE THEM AS FINISHING MATERIAL ON THE FLOOR, WALLS AND TO DISPLAY THEM AS IF HANGING A PORTRAIT. </li></ul><ul><li>THE DESIGN TEAM’S APPROACH WAS TO PRESENT THE PRODUCT AS THE FOCUS OF THE EXHIBIT. THE ‘TILE’ IS THE EXHIBIT PIECE. </li></ul><ul><li>TO DRAW ATTENTION TO THE ‘TILE’, THE CONCEPT PROPOSES TO PUT UP STORY AND PICTURE BOARDS SHOWING THE VARIOUS APPLICATIONS OF THE PRODUCT. CUSTOMERS WILL BE ORIENTED TO THEIR VARIED USES. </li></ul><ul><li>TO ACCOMPANY THESE BOARDS WITH THE ACTUAL PRODUCT SAMPLE WITHIN AN ARMS LENGTH OF THE VIEWER-CUSTOMER SO THAT THEY CAN OBSERVE THE PRODUCT QUALITIES AND ACTUALLY ‘FEEL’ THE PRODUCT TEXTURE. </li></ul>
  4. 4. 3 II. DESIGN CONCEPT EXHIBIT AREA <ul><li>TO MOUNT THESE BOARDS & TILES ON A MODULAR DISPLAY UNIT. THESE UNITS WILL HAVE DISPLAY BOARDS ON THE FRONT AND REAR SIDES. </li></ul>DISPLAY BOARD, TYPICAL@ FRONT & REAR SIDES PRODUCT TRAY, CAN EASILY BE REACHED WHILE VIEWING BOARD MODULAR STAND WITH HORIZONTAL RUNNING FRAMES MODULAR BASE
  5. 5. 4 II. DESIGN CONCEPT EXHIBIT AREA <ul><li>THE LAYOUT OF THESE MODULES WITHIN THE EXHIBIT AREA WILL INCORPORATE AREAS FOR NEW PRODUCTS AND FOR EXISTING PRODUCTS </li></ul><ul><li>THE CONCEPT ALSO PROPOSES THAT THE WHOLE FRAMING AND FLOOR COMPONENTS ARE ALSO MODULAR IN DESIGN. THESE WILL ALSO INCLUDE WALL PANELS AND SIGNAGE PANELS THAT ARE ALSO MODULAR IN NATURE. </li></ul>FLOOR PANELS WITH PERIMETER LOCK MODULAR METAL FRAMES, GROUND & SECOND LEVEL
  6. 6. 5 II. DESIGN CONCEPT EXHIBIT AREA FRAMING WITH 2 ND LEVEL FLOOR PANELS AND STAIR. FLOOR PANELS WITH CARPET TILE FINISH. FRAMING WITH PARTIAL WALL PANELS AND FIRST LEVEL WITH CARPET TILE FINISH. <ul><li>KNOCK DOWN COMPONENTS ARE EASILY ASSEMBLED AND CAN BE STORED AND THEN USED FOR OTHER INDOOR EXHIBITS IN THE FUTURE. MODULES CAN BE CONFIGURED TO BE USED AS A SMALL 2M X 3M BOOTH OR AS LARGE AS SHOWN. </li></ul>
  7. 7. 6 III. DESIGN AESTHETICS EXHIBIT AREA <ul><li>THE USE OF PICTURE WALLS, GRAPHICAL STICKERS, MOUNTED LETTER SIGNAGES AND PRODUCT BOARDS ARE PART OF THE WHOLE CONCEPT OF A MUSEUM TYPE EXHIBIT AREA. </li></ul><ul><li>THE USE OF FROSTED, TRANSLUCENT AND CLEAR GLAZING OR ACRYLIC PANELS WAS ALSO CONSIDERED TO PRESENT A FEELING OF OPENESS AND MODERN STYLES. </li></ul><ul><li>THE OVER-ALL AESTHETIC VALUE OF THE EXHIBIT AREA IS ENVISIONED BY THE ARCHITECT-DESIGNER AS A MODERN, INDUSTRIAL, MUSEUM TYPE MODULAR STRUCTURE WHICH CAN BE USE AS A MARKETING TOOL EVERYTIME THE NEED ARISES. </li></ul><ul><li>SHOWN ON THE FOLLOWING PAGES ARE THE SCHEMATICS AND ARCHITECT’S PERSPECTIVES OF THE FINAL FINISHED STRUCTURE. </li></ul>
  8. 8. 7 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF FRONT VIEW
  9. 9. 8 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF FRONT – RIGHT SIDE VIEW
  10. 10. 9 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF RIGHT SIDE - REAR VIEW
  11. 11. 10 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF REAR VIEW
  12. 12. 11 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF REAR – LEFT SIDE VIEW
  13. 13. 12 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF FRONT – LEFT SIDE VIEW
  14. 14. 13 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF INTERIOR SHOWING VIEW FROM REAR ENTRY
  15. 15. 14 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF INTERIOR SHOWING VIEW OF GRND FLOOR EXHIBIT AREA
  16. 16. 15 III. DESIGN AESTHETICS EXHIBIT AREA SCHEMATIC OF INTERIOR SHOWING VIEW OF 2 ND LEVEL EXHIBIT AREA
  17. 17. 16 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF FRONT VIEW
  18. 18. 17 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF FRONT – RIGHT SIDE VIEW
  19. 19. 18 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF RIGHT SIDE – REAR VIEW
  20. 20. 19 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF REAR VIEW
  21. 21. 20 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF REAR – LEFT SIDE VIEW
  22. 22. 21 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S PERSPECTIVE OF FRONT – LEFT SIDE VIEW
  23. 23. 22 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S INTERIOR PERSPECTIVE SHOWING VIEW FROM REAR ENTRY
  24. 24. 23 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S INTERIOR PERSPECTIVE SHOWING VIEW OF GRND FLOOR EXHIBIT AREA
  25. 25. 24 IV. ARCHITECT’S PERSPECTIVES EXHIBIT AREA ARCHITECT’S INTERIOR PERSPECTIVE SHOWING VIEW OF 2 ND FLOOR EXHIBIT AREA
  26. 26. 25 V. CONSIDERATIONS FOR IMPLEMENTATION EXHIBIT AREA <ul><li>UPON APPROVAL OF THIS CONCEPT AND CORRESPONDING PROPOSAL, THE DESIGN TEAM FORMALIZES THE FOLLOWING RESONSIBILITIES: </li></ul><ul><li>BASED ON THE INITIAL SCHEMATICS, THE DESIGN TEAM LOCATES REPUTABLE FABRICATORS AND MANUFACTURERS FOR THE FLOOR PANELS, FRAMING, WALL PANELS AND DISPLAY MODULES. </li></ul><ul><li>THE CLIENT AGREES TO APPROPRIATE BUDGET FOR SECTIONAL MOCK-UP PROCEDURES TO DETERMINE STRUCTURAL INTEGRITY & STABILITY SO THAT REVISIONS AND RECTIFICATIONS ARE PROPERLY ADDRESSED IF NECESSARY. </li></ul><ul><li>THESE PROCEDURES ARE ESSENTIAL IN KNOWING COST IMPLICATIONS. </li></ul><ul><li>IF AND WHEN THESE MODULES WOULD HAVE A SIGNIFICANT IMPACT TO THE COMPANY’S ALLOTED BUDGET, THE ARCHITECT-DESIGN TEAM AGREES TO DOWNGRADE THE DESIGN IN ORDER TO MEET THE TARGETED BUDGET. </li></ul><ul><li>THE COMPANY IN RETURN ACKNOWLEDGES THE ARCHITECT-DESIGNER’S RE-DESIGN AND AGREES TO PROVIDE COMPENSATION FOR THE PROCESS. </li></ul>

×