SlideShare a Scribd company logo
1 of 16
Download to read offline
PETA LOKASI RENCANA PAGAR
Skala : 1:1000
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
TAMPAK LUAR
TAMPAK DALAM
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
TAMPAK SAMPING KIRI
TAMPAK SAMPING KANAN
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
550
550
550
550
534.8
510
510
510
510
495
50 50 50 50 50 50 50
340 420 272.5 272.5 272.5 272.5
DENAH RENCANA PAGAR
Skala : 1:150
EKSISTING
RENCANA
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
TAMPAK DEPAN RENCANA PAGAR
Skala : 1: 70
Jalan raya
Rangka Tipe 1 Rangka Tipe 2
50 340 50 420 50 272.5 50 272.5 50 272.5 50 272.5 50
Rangka Tipe 3 Rangka Tipe 3 Rangka Tipe 3 Rangka Tipe 3
185
5
20
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
185
495 510 510 510 510
20
Tinggi Permukaan
Pondasi
Tinggi Pasangan
Kolom
Lantai Cor Rabat
Tebal 6 cm
185
20
Tinggi Permukaan
Pondasi
Tinggi Pasangan
Kolom
TAMPAK KANAN RENCANA PAGAR
Skala : 1:90
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
550 550 550 550 534.8
185
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
Pasangan
Dinding
Tinggi Permukaan
Pondasi
Tinggi Pasangan
Kolom
20
185
20
TAMPAK KIRI RENCANA PAGAR
Skala :
Tinggi Permukaan
Pondasi
Tinggi Pasangan
Kolom
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
550
550
550
550
535
510
510
510
510
495
50 340 50 50 272.5 50 272.5 50 272.5 50 272.5 50
DENAH RENCANA PONDASI
Skala : 1:150
A
B B
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
Pasir urug T= 5cm
Pasangan Batu Kosong T= 10 cm
Urugan Tanah Bekas Galian
Pasangan Pondasi
Sloof 15x20 cm
Rooster
Cor Plat Beton
Rangka Tipe 3 (Hollow 2x4)
Pasir urug T= 5cm
Pasangan Batu Kosong T= 10 cm
Urugan Tanah Bekas Galian
Pasangan Pondasi
Sloof 15x20 cm
Sloof 12x20 cm
DETAIL PONDASI A-A
Skala : 1:25
DETAIL PONDASI B-B
Skala : 1:25
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
KL 1
KL 1
KL 1
KL 1
KL 1
KL 2 KL 2
KL 1
KL 1
KL 1
KL 1
KL 1
KL 2 KL 2
KL 2
KL 2
KL 2
DENAH RENCANA KOLOM DAN SLOOF
Skala : 1:150
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
KL1 30X30
Mutu Beton
Selimut Beton 2 Cm
Tulangan Beton 8∅ 10
Tulangan Sengkang ∅8 - 15
KL2 20X20
Mutu Beton
Selimut Beton 2 Cm
Tulangan Beton 4∅ 10
Tulangan Sengkang ∅8 - 15
30
80
165
5
185
Pasangan Batu
KL 2 (20x20)
Cor Plat rabat
KL 1 (30x30)
K 175
K 175
DETAIL KOLOM DAN SLOOF
Skala : 1:20
RBL 15X20
Mutu Beton
Selimut Beton
K 175
2 Cm
Tulangan Beton 4∅ 10
Tulangan Sengkang ∅6 - 15
SLOOF 12X20
Mutu Beton
Selimut Beton 2 Cm
Tulangan Beton 4∅ 10
Tulangan Sengkang ∅6 - 15
K 175
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
masuk Dalam Dinding
5 cm
11.0 11.0
302.0
310.0
masuk Dalam Dinding
5 cm
10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 10
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
14
12.5
76.0
76.0
10.5
10.0
15.0
120.5
3
5
.
0
2
5
.
0
Hollow bengkok 2x4
DETAIL TIPIKAL 1
Skala : 1:20
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
458
185
11.8 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 10.8 5 11.8
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
10.8
5
100.0 124.0 100.0
124.0
Reling Pagar Besi
Roda Pagar
Hollow 4x4
Hollow 2x4
Kalsipank
DETAIL TIPIKAL 2 LUAR
Skala : 1:30
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
24.0
209.0
38
16
41.0
41.0
41.0
41.0
26.5
Besi Siku
Skoring Besi Hollow 4x4
Besi Hollow 4x4
115.6
Besi Siku
Besi Hollow 4x4
Rangka Tipe 2
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
9.0
Detail 1
Detail 2
209.0
32.0
9.0
22.5
22.5
Kalsipank
Hollow 2x4
Hollow 4x4
Besi Siku (L)
Lahar Pemutar
Roda Pagar
Hollow 4x4
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001
Rangka Tipe 3
masuk Dalam Dinding
5 cm 11 11
242.5
234.5
76.0
15.0
120.5
3
5
.
0
2
5
.
0
Hollow bengkok 2x4
8.38 8 8 8 8 8 8 8 8 8 12.59 14 8 8 8 8 8 8 8 8 8 8 8 8 88.3
76.0
10.5
10.0
masuk Dalam Dinding
5 cm
DETAIL TIPIKAL 3
Skala : 1:20
PEMERINTAH DAERAH
OPD
LOKASI
TAHUN
NAMA PEKERJAAN KONSULTAN PERENCANA
FEBRINA SILKIA, S.T
CV. INSAETMEK ENGINEERING
JASA KONSULTANSI PERENCANAAN PAGAR
RUMAH DINAS KEHUTANAN KAB. POSO
DINAS KEHUTANAN PROVINSI
SULAWESI TENGAH
JL. PULAU ROTI KOTA POSO
2023
KEPALA DINAS KEHUTAN
PROVINSI SULAWESI TENGAH
Ir.A. Rahmansyah Ismail., M.Agr.,MP
Nip. 196910161995031002
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Mohammad Iqbal, S.Hut., MP
Nip. 198703052011011008
KUASA PENGGUNA ANGGARAN
DINAS KEHUTANAN
ABDUL RAHMAN, S.Hut
Nip. 197011142000121001

More Related Content

What's hot

Irigasi, bendung dan bangunan air
Irigasi, bendung dan bangunan airIrigasi, bendung dan bangunan air
Irigasi, bendung dan bangunan airabufaiza
 
Metode teknis dan flow chart of work
Metode teknis dan  flow chart of workMetode teknis dan  flow chart of work
Metode teknis dan flow chart of workZinet Yeha
 
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptx
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptxPersiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptx
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptxssuser773280
 
Justifikasi teknik i._latar_belakang_jus
Justifikasi teknik i._latar_belakang_jusJustifikasi teknik i._latar_belakang_jus
Justifikasi teknik i._latar_belakang_jusergi bari
 
Pedoman Penempatan Utilitas pada Daerah Milik Jalan
Pedoman Penempatan Utilitas pada Daerah Milik JalanPedoman Penempatan Utilitas pada Daerah Milik Jalan
Pedoman Penempatan Utilitas pada Daerah Milik Jalaninfosanitasi
 
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2Joy Irman
 
Pelaksanaan jalan-beton-semen-ok
Pelaksanaan jalan-beton-semen-okPelaksanaan jalan-beton-semen-ok
Pelaksanaan jalan-beton-semen-okPutik Ervia Mei
 
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalanahmad fuadi
 
bangunan irigasi pelengkap ppt
bangunan irigasi pelengkap pptbangunan irigasi pelengkap ppt
bangunan irigasi pelengkap pptzadha
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuanim4m90
 
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.pptErvanKamal2
 
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193Reski Aprilia
 
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptx
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptxAhli Muda Bidang Keahlian Teknik Sumber Daya Air.pptx
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptxDickyAanastaSaputra
 
11 sistem jaringan dan bangunan irigasi
11   sistem jaringan dan bangunan irigasi11   sistem jaringan dan bangunan irigasi
11 sistem jaringan dan bangunan irigasiKharistya Amaru
 
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakan
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakanModul 2 konsep perencanaan pengembangan sumber daya air, kebijakan
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakanLusnia S Multianti
 
Penilaian Kinerja & AKNOP Daerah Irigasi Air Lakitan
Penilaian Kinerja & AKNOP Daerah Irigasi Air LakitanPenilaian Kinerja & AKNOP Daerah Irigasi Air Lakitan
Penilaian Kinerja & AKNOP Daerah Irigasi Air LakitanAgung Noorsamsi
 
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai Bungur
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai BungurPenilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai Bungur
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai BungurAgung Noorsamsi
 

What's hot (20)

Irigasi, bendung dan bangunan air
Irigasi, bendung dan bangunan airIrigasi, bendung dan bangunan air
Irigasi, bendung dan bangunan air
 
SUMUR RESAPAN
SUMUR RESAPANSUMUR RESAPAN
SUMUR RESAPAN
 
Metode teknis dan flow chart of work
Metode teknis dan  flow chart of workMetode teknis dan  flow chart of work
Metode teknis dan flow chart of work
 
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptx
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptxPersiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptx
Persiapan Penetapan Sempadan dan Revitalisasi Danau Ranau1.pptx
 
Justifikasi teknik i._latar_belakang_jus
Justifikasi teknik i._latar_belakang_jusJustifikasi teknik i._latar_belakang_jus
Justifikasi teknik i._latar_belakang_jus
 
Pedoman Penempatan Utilitas pada Daerah Milik Jalan
Pedoman Penempatan Utilitas pada Daerah Milik JalanPedoman Penempatan Utilitas pada Daerah Milik Jalan
Pedoman Penempatan Utilitas pada Daerah Milik Jalan
 
Action Plan.pptx
Action Plan.pptxAction Plan.pptx
Action Plan.pptx
 
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2
Tata Cara Penyusunan Detail Desain (DED) Drainase Perkotaan - bagian 2
 
Pelaksanaan jalan-beton-semen-ok
Pelaksanaan jalan-beton-semen-okPelaksanaan jalan-beton-semen-ok
Pelaksanaan jalan-beton-semen-ok
 
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan
2007 11-pekerjaan bangunan pelengkap dan perlengkapan jalan
 
bangunan irigasi pelengkap ppt
bangunan irigasi pelengkap pptbangunan irigasi pelengkap ppt
bangunan irigasi pelengkap ppt
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuan
 
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt
395135768-279891529-PEMELIHARAAN-IRIGASI-ppt.ppt
 
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193
Perhitungan Volume Pekerjaan Rumah Tinggal Tipe 193
 
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptx
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptxAhli Muda Bidang Keahlian Teknik Sumber Daya Air.pptx
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air.pptx
 
11 sistem jaringan dan bangunan irigasi
11   sistem jaringan dan bangunan irigasi11   sistem jaringan dan bangunan irigasi
11 sistem jaringan dan bangunan irigasi
 
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakan
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakanModul 2 konsep perencanaan pengembangan sumber daya air, kebijakan
Modul 2 konsep perencanaan pengembangan sumber daya air, kebijakan
 
Penilaian Kinerja & AKNOP Daerah Irigasi Air Lakitan
Penilaian Kinerja & AKNOP Daerah Irigasi Air LakitanPenilaian Kinerja & AKNOP Daerah Irigasi Air Lakitan
Penilaian Kinerja & AKNOP Daerah Irigasi Air Lakitan
 
Pondasi sumuran
Pondasi sumuranPondasi sumuran
Pondasi sumuran
 
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai Bungur
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai BungurPenilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai Bungur
Penilaian Kinerja Daerah Irigasi Batulicin dan Daerah Irigasi Sungai Bungur
 

Recently uploaded

Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 

Recently uploaded (20)

Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 

Detail Pagar FIXX2.pdf

  • 1. PETA LOKASI RENCANA PAGAR Skala : 1:1000 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 2. TAMPAK LUAR TAMPAK DALAM PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 3. TAMPAK SAMPING KIRI TAMPAK SAMPING KANAN PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 4. 550 550 550 550 534.8 510 510 510 510 495 50 50 50 50 50 50 50 340 420 272.5 272.5 272.5 272.5 DENAH RENCANA PAGAR Skala : 1:150 EKSISTING RENCANA PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 5. TAMPAK DEPAN RENCANA PAGAR Skala : 1: 70 Jalan raya Rangka Tipe 1 Rangka Tipe 2 50 340 50 420 50 272.5 50 272.5 50 272.5 50 272.5 50 Rangka Tipe 3 Rangka Tipe 3 Rangka Tipe 3 Rangka Tipe 3 185 5 20 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 6. 185 495 510 510 510 510 20 Tinggi Permukaan Pondasi Tinggi Pasangan Kolom Lantai Cor Rabat Tebal 6 cm 185 20 Tinggi Permukaan Pondasi Tinggi Pasangan Kolom TAMPAK KANAN RENCANA PAGAR Skala : 1:90 Pasangan Dinding Pasangan Dinding Pasangan Dinding Pasangan Dinding Pasangan Dinding PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 7. 550 550 550 550 534.8 185 Pasangan Dinding Pasangan Dinding Pasangan Dinding Pasangan Dinding Pasangan Dinding Tinggi Permukaan Pondasi Tinggi Pasangan Kolom 20 185 20 TAMPAK KIRI RENCANA PAGAR Skala : Tinggi Permukaan Pondasi Tinggi Pasangan Kolom PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 8. 550 550 550 550 535 510 510 510 510 495 50 340 50 50 272.5 50 272.5 50 272.5 50 272.5 50 DENAH RENCANA PONDASI Skala : 1:150 A B B PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 9. Pasir urug T= 5cm Pasangan Batu Kosong T= 10 cm Urugan Tanah Bekas Galian Pasangan Pondasi Sloof 15x20 cm Rooster Cor Plat Beton Rangka Tipe 3 (Hollow 2x4) Pasir urug T= 5cm Pasangan Batu Kosong T= 10 cm Urugan Tanah Bekas Galian Pasangan Pondasi Sloof 15x20 cm Sloof 12x20 cm DETAIL PONDASI A-A Skala : 1:25 DETAIL PONDASI B-B Skala : 1:25 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 10. KL 1 KL 1 KL 1 KL 1 KL 1 KL 2 KL 2 KL 1 KL 1 KL 1 KL 1 KL 1 KL 2 KL 2 KL 2 KL 2 KL 2 DENAH RENCANA KOLOM DAN SLOOF Skala : 1:150 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 11. KL1 30X30 Mutu Beton Selimut Beton 2 Cm Tulangan Beton 8∅ 10 Tulangan Sengkang ∅8 - 15 KL2 20X20 Mutu Beton Selimut Beton 2 Cm Tulangan Beton 4∅ 10 Tulangan Sengkang ∅8 - 15 30 80 165 5 185 Pasangan Batu KL 2 (20x20) Cor Plat rabat KL 1 (30x30) K 175 K 175 DETAIL KOLOM DAN SLOOF Skala : 1:20 RBL 15X20 Mutu Beton Selimut Beton K 175 2 Cm Tulangan Beton 4∅ 10 Tulangan Sengkang ∅6 - 15 SLOOF 12X20 Mutu Beton Selimut Beton 2 Cm Tulangan Beton 4∅ 10 Tulangan Sengkang ∅6 - 15 K 175 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 12. masuk Dalam Dinding 5 cm 11.0 11.0 302.0 310.0 masuk Dalam Dinding 5 cm 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 14 12.5 76.0 76.0 10.5 10.0 15.0 120.5 3 5 . 0 2 5 . 0 Hollow bengkok 2x4 DETAIL TIPIKAL 1 Skala : 1:20 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 13. 458 185 11.8 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 10.8 5 11.8 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 14.3 10.8 5 100.0 124.0 100.0 124.0 Reling Pagar Besi Roda Pagar Hollow 4x4 Hollow 2x4 Kalsipank DETAIL TIPIKAL 2 LUAR Skala : 1:30 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 14. 24.0 209.0 38 16 41.0 41.0 41.0 41.0 26.5 Besi Siku Skoring Besi Hollow 4x4 Besi Hollow 4x4 115.6 Besi Siku Besi Hollow 4x4 Rangka Tipe 2 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 15. 9.0 Detail 1 Detail 2 209.0 32.0 9.0 22.5 22.5 Kalsipank Hollow 2x4 Hollow 4x4 Besi Siku (L) Lahar Pemutar Roda Pagar Hollow 4x4 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001
  • 16. Rangka Tipe 3 masuk Dalam Dinding 5 cm 11 11 242.5 234.5 76.0 15.0 120.5 3 5 . 0 2 5 . 0 Hollow bengkok 2x4 8.38 8 8 8 8 8 8 8 8 8 12.59 14 8 8 8 8 8 8 8 8 8 8 8 8 88.3 76.0 10.5 10.0 masuk Dalam Dinding 5 cm DETAIL TIPIKAL 3 Skala : 1:20 PEMERINTAH DAERAH OPD LOKASI TAHUN NAMA PEKERJAAN KONSULTAN PERENCANA FEBRINA SILKIA, S.T CV. INSAETMEK ENGINEERING JASA KONSULTANSI PERENCANAAN PAGAR RUMAH DINAS KEHUTANAN KAB. POSO DINAS KEHUTANAN PROVINSI SULAWESI TENGAH JL. PULAU ROTI KOTA POSO 2023 KEPALA DINAS KEHUTAN PROVINSI SULAWESI TENGAH Ir.A. Rahmansyah Ismail., M.Agr.,MP Nip. 196910161995031002 PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Mohammad Iqbal, S.Hut., MP Nip. 198703052011011008 KUASA PENGGUNA ANGGARAN DINAS KEHUTANAN ABDUL RAHMAN, S.Hut Nip. 197011142000121001