Mgmt404 week 6 i lab task constraints and baselines

  1. 1. MGMT404 Week 6 iLab Task Constraints and Baselines PLEASE DOWNLOAD HEREProject Leadership and Outsourcing & Project Procurement - iLabiLab 6 of 7: Task Constraints and BaselinesGeneral Comments about the Microsoft Project ExercisesSometimes certain tasks must be constrained by dates, rather than only by thepredecessors. For example, the Independence Day holiday is not dependentupon us getting our BBQ ready and buying fireworks (predecessor tasks) but bythe fact that this holiday MUST occur on July 4. Once we have determined whatthese constraints are, we can set our project baseline and be ready to completework on our project. To finalize our project plan in order to begin work, we will:Use constraints to set date limitations. Set a project baseline schedule.GuidelinesComplete Lesson 6. Print the Constraints Table. (Include all columns of thetable.) Print the Project Summary Report.DeliverablesAll of the following deliverables are required (in a zip file) to receive full credit:Completed MyLab6_XXX.mpp Completed Review QuestionsPrintouts/Screenshots contained in Week_6_Printouts_XXX.docxWhen submitting required printouts (if you are not bringing them to class), take ascreenshot (in Windows <ALT><PrtScr>) of the report from the Print Previewpage and paste the screenshot to an MS Word Document. Make sure to crop thescreen to show only the report. After cropping, resize the image appropriately. Ifthe printout is on more than one page, paste each page individually.Save the Word document containing printouts as Week_6_Printouts_XXX.docx,and submit this file to the Week 6 iLabDropbox in a zip file along with theMyLab6_XXX.mpp file and the completed Review Questions at the end of Lesson
  2. 2. 6. Remember to replace "XXX" in all the file names with your initials, and ensurethat all of your files are clearly labeled.iLAB STEPSSTEP 1: Download iLab InstructionsClick the links below to access this weeks iLab instructions. You may alsodownload both lessons from the MS Project Exercises category in Doc Sharing.MS Project Lesson6.docx(Review Questions to be completed and submitted forLesson 6 are located at the end of this document.)STEP 2: Complete the iLab AssignmentComplete the iLab assignment for Week 6 based on the Guidelines section andLesson document above.STEP 3: Submit iLab Deliverables Create a folder called MGMT404_YourLastName_Lab6. Place copies of eachrequired deliverable into this folder. Right-click on the folder and select Send To→ Compressed (zipped) Folder. You can also use other tools to compress thefiles into a single zip folder (for example, 7-zip). Upload the zip file to the weeklyiLabDropbox in eCollege.For instructions on how to use the Dropbox, read theseStep-by-StepInstructionsor watch thisDropbox Tutorial. See Syllabus "Due Dates forAssignments & Exams" for due date information.Once your professor has received and graded the Week 6 iLab assignments,solutions to the Week 6 iLab will be made available to you in Doc Sharing

×