Request for Proposal
Document
For
Setting up of Grid Connected Solar PV
Projects coupled with
Pisci-culture in Bihar
150 MW
Salient Features of RfP Document:
• average annual global solar radiation : 4.83 kWh/sq.m
• 280 - 300 sunny days
• Bihar, making land available for the solar power projects is one of the
major barriers in establishment of cost effective grid connected projects
• Govt. of Bihar has decided to develop upto 150 MW of Solar Photovoltaic
based projects which are to be set-up on the maun/chaur/pond where
pisci-culture is being undertaken
• Bihar State Power (Holding) Company Limited (BSPHCL), a company
engaged in planning, promoting and developing the power sector in the
state of Bihar, has been designated by Energy Department, Govt. of Bihar
for undertaking the bid process management for selection of the private
developers
Salient Features of RfP Document:
• PPA with North Bihar Power Distribution Company Limited/South Bihar
Power Distribution Company limited as intimated by BSPHCL
• Term of PPA : 25 years
• Total Capacity to be Procured: 150 MW at Delivery point from project
plant to be developed on the maun/chaur/pond where pisci-culture is
being practiced
• Size of each project to be Considered:
– Minimum capacity of any individual Project - 2 MW (with a tolerance of +5%)
– Maximum capacity of any individual Project - 10 MW (with a tolerance of +5%)
• Total capacity of Solar PV Projects to be allocated: maximum of three
projects at different locations subject to a maximum aggregate capacity of
30 MW
• Bidder shall submit one single application in the prescribed format
detailing all projects at multiple locations
Qualification Requirements
• Eligibility Conditions
– Bidder may be a single entity (the “Bidding Company”) or group of entities (the “Bidding
Consortium”), coming together to implement the Project
– Bidding Company/Bidding Consortium can be a private entity, government owned entity
or any combination of them with the legal status as a Private / Public Limited
• Financial Criteria
– Net Worth: > or = Rs 3 crore per MW for upto 20 MW. For every MW additional
capacity, beyond 20 MW , additional net worth of Rs. 2 crore per MW
– Bidder has at least twenty six percent (26%) equity in each Company whose accounts
are merged in the audited consolidated account
– For the purpose of the computation of Net Worth, the last four financial years shall be
considered
– Single Bidding Company shortlisted in RfP can also execute the project through a Special
Purpose Vehicle (SPV). However the SPV has to be formed before signing of PPA keeping
the original shareholding unchanged
Salient Features of RfP Document:
• It is not necessary to have the Technology partner at RfP stage
• also not necessary for the Technology partner to have an equity stake in
the Bidding
• Bidder may seek qualification on the basis of financial capability of its
Parent and / or its Affiliate(s) for the purpose of meeting the Qualification
Requirements
• Net Worth of individuals, whether Director or otherwise, shall not be
considered
• Technical Criteria
– Bidder shall deploy commercially established technology wherein there is at least one
project, successfully operational based on the proposed technology of at least One MW,
for at least one year, anywhere in the world
• Freedom to choose Technology
– Bidder is free to choose any Solar PV power generation technology viz Crystalline Silicon
Solar Cell Modules / Thin Film Modules / Concentrated PV Modules/any Other
Technology manufactured in India or Imported
Salient Features of RfP Document:
• Submission of Response to RfP by the bidder
Envelope I
– The Envelope I shall contain the following:
i) Bid cost Receipt/Bid cost DD/Pay order for Rs 10,000/-
ii) DD/Pay order of @ Rs.2,00,000/- towards Processing Fee of BPIC;
iii) Summary Data Sheet (Format 6.10); and
iv) Bank Guarantee towards EMD @ Rs. 20 Lacs/MW.
Envelope II – Non financial bid
– The Envelope II shall contain the following:
1. Covering Letter as per Format 6.1;
2. Power of Attorney to be provided by the Bidding Company/Lead Member in favour of
its representative
3. In case of a Bidding Consortium, a Power of Attorney in favour of the Lead Member
issued by the other Members of the Consortium shall be provided
4. Draft of Performance Guarantee (to be submitted at the time of signing of PPA)
Salient Features of RfP Document:
8. Board Resolutions, as per prescribed formats
– Board resolution from the Bidding Company or the Lead Member of the Consortium,
as the case may be, in favour of the person signing the response to RfP
– Draft of Performance Guarantee (to be submitted at the time of signing of PPA)
– Board Resolutions, as per prescribed formats
– Board resolution from the Bidding Company or the Lead Member of the Consortium, as
the case may be, in favour of the person signing the response to RfP
9. Format for Financial Requirements as per Format
10. Format for Technical Criteria wherein Bidder shall provide the details of the technology
proposed to be adopted for the project
11. evidence regarding its successful operation in any of the projects for at least one year
as per Format
12. A letter from the STU/Discom (as applicable) confirming “in-principle” connectivity of
the Project as per Format
13. A disclosure statement as per Format 6.9 regarding participation of any related
companies in this bidding process
Salient Features of RfP Document:
8. A disclosure statement as per Format 6.9 regarding participation of any related
companies in this bidding process
9. Details of the Proposed Technology as per Format
10. Submission of financial bid (blank) as per Format
11. Initialed RfP documents including PPA duly signed as acceptance.
Envelope III – Financial bid
The Envelope III shall contain the following:
i) Financial Bid as per Format 6.13;
ii) Bid Bond as per the Format 6.3B;
• The Bidder shall submit the discount on the Net Levelised tariff as declare
by BERC at the Delivery Point
• The Bidder’s can submit more than one Bid for different Projects, provided
that no two Projects are located at single location
Salient Features of RfP Document:
• Selection of Solar PV and Project commissioning shall be carried out
according to the timeline given below:-
Sl.No Event Date
1 Notice for Request for Proposal (RfP) Zero Date
2 Response/Clarification on RfP 15 days from issue of RfP
(zero date + 15 days)
3 Pre-bid Meeting 17 days from issue of RfP
(zero date + 17 days)
4 Clarifications to be issued on RfP and
issue of revised RfP (if req.)
21 days from issue of RfP
(zero date + 21 days)
5 Submission of Response to RfP with
documents
90 days from issue of RfP
(zero date + 90 days)
6 Technical Evaluation of Bids received in
response to RfP
Within 7 days from receipt of
response to RfP
(zero date + 97 days)
Salient Features of RfP Document:
Sl.No Event Date
7 Approval of Bid Evaluation
Committee for opening of
Financial Part of RfP
Within 10 days from receipt of
response to RfP
(zero date + 100 days)
8 Opening of Financial Part of
RfP
Within 15 days from receipt of
response to RfP
(zero date + 105 days)
9 Issue of letter of Intent Within 15 days from opening of the
price part of proposals
(zero date + 120 days)
10 PPA Signing Within 15 days from the date of issue
of Letter of intent (LoI date + 15 days)
11 Financial closure of the project Within 240 days from the date of
signing of PPA (LoI date + 255 days)
12 Commissioning of Solar PV
Plant
24 months from the date of signing of
the PPA
Bank Guarantees
1 Earnest Money
Deposit (EMD)
@ Rs. 20 Lacs / MW for each
project in the form of Bank
Guarantee along with Bid
(valid for a period of 210
days from the last date of
submission of the Bid)
2 Bid Bond @ To be calculated on the basis
of percentage discount offered
by bidder
(valid for a period of 210
days from last date of
submission of Bid)
3 Performance
Guarantee
@ Rs. 50 Lacs/ MW plus
amount equivalent to Bid Bond
/ MW for each project in the
form of 03 Nos. of Bank
Guarantee in the ratio of 20%,
40% & 40% at the time of
signing of PPA
(valid for a period of 16
months from the date of
signing of PPA)
4 Bank Guarantees have to be executed on non-judicial stamp paper of appropriate
value as per Stamp Act relevant to place of execution
5 The Bank Guarantees towards EMD and Bid Bond of all unsuccessful Bidders will
be released within sixty days of the signing of the PPA with the Selected Bidder(s)
Salient Features of RfP Document:
• Financial Closure/Project Financing: Within 180 days from PPA Signing
• 180 daysMilestone Time Period from
the Signing of the
PPA
Documentary Evidence to be
produced to BREDA / NBPDCL /
SBPDCL
Engagement with the
local fisher communities
Three Months Confirmation of the arrangement
between the project developer
and the fisher community from
the concerned local panchayat /
revenue official
No-Objection Certificate
from State Pollution
Control Board (If
required)
Four Months Copy of the Approval Letter
from SPCB
Placement of
Order/Agreement signing
for purchase of plant and
machinery for the project
Four Months Order/Agreement Copy
Milestone Time Period from
the Signing of the
PPA
Documentary Evidence to
be produced to BREDA /
NBPDCL / SBPDCL
Payment of requisite advance or
opening of irrevocable letter of
credit with suppliers/contractors
Five Months Receipt of payment from
the Supplier/Contractor
Clear Possession of land @ 2.5
Hectares/MW (minimum)
Eight Months (Certificates from required
authorities as mentioned below)
•Ownership or lease hold rights from State agency only (for at least 30 years) in the
name of the Project Developer and possession of 100% of the area
• Certificate by the concerned and competent revenue / registration authority for the
acquisition / ownership / vesting of the Land
• Certificate by the concerned and competent revenue / registration authority
regarding the classification of the land as maun/ chaur/ ponds
• Sworn affidavit from the Authorized person of the developer listing the details of
the land and certifying total land required for the project under clear possession of
the Project Developer
Financial Closure EIght Months Copy of the Sanction Letter
Salient Features of RfP Document:
• Commissioning Schedule and Penalty for Delay in Commissioning
– Project shall be commissioned within 24 (Twenty Four) months from the date of signing
of PPA
– BSPHCL/Procurer(s) shall encash the Performance Guarantee
– Delay up to one month – 20%
– Delay of more than one month and up to two months - 40%
– Delay of more than two months and up to three months - remaining Performance Bank
Guarantees
– PART COMMISSIONING IS ALLOWED & PBG WILL BE ENCASHED ON PROPORTION OF
PROJECT COMMISSIONED
– Delay beyond 3 (three) months then Liquidated Damages (LD) @ Rs.1,00,000 per MW
per day of delay
• Part Commissioning is allowed for minimum 2 MW and multiples thereof
Important dates
• Last date for online sale of Tender document: 14th August,
2013 up to 17.00 hrs
• Last date for online submission of Tender: 16th August, 2013
up to 13.00 hrs
• Opening of Technical Bid: 16th August, 2013 at 15.00 hrs
THANK YOU

More Related Content

What's hot

15 Annual General Meeting
15 Annual General Meeting15 Annual General Meeting
15 Annual General MeetingNamgay Tshering
 
New regulation on white certificates
New regulation on white certificatesNew regulation on white certificates
New regulation on white certificatesMaria Deledda
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerPratap Malempati
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Tee Joanne
 
HM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPTHM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPTEuan Pirie
 
Ntpc limited development of 750 mw( 6 x125 mw each )
Ntpc limited  development of 750 mw( 6 x125 mw each )Ntpc limited  development of 750 mw( 6 x125 mw each )
Ntpc limited development of 750 mw( 6 x125 mw each )Lawrence George
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationAltera Infrastructure
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
 
Teekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationTeekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationAltera Infrastructure
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Dhruv Seth
 
Ppp swiss-challenge-route
Ppp swiss-challenge-routePpp swiss-challenge-route
Ppp swiss-challenge-routeNaman Kumar
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsAmitava Nag
 

What's hot (16)

15 Annual General Meeting
15 Annual General Meeting15 Annual General Meeting
15 Annual General Meeting
 
New regulation on white certificates
New regulation on white certificatesNew regulation on white certificates
New regulation on white certificates
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)
 
HM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPTHM hub and NPD second masterclass seminar 6.11.15.PPT
HM hub and NPD second masterclass seminar 6.11.15.PPT
 
Ntpc limited development of 750 mw( 6 x125 mw each )
Ntpc limited  development of 750 mw( 6 x125 mw each )Ntpc limited  development of 750 mw( 6 x125 mw each )
Ntpc limited development of 750 mw( 6 x125 mw each )
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings Presentation
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
Teekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationTeekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings Presentation
 
MANUFACTURING AGREEMENT
MANUFACTURING AGREEMENT MANUFACTURING AGREEMENT
MANUFACTURING AGREEMENT
 
Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)Real estate guidance note 2012 (drti)
Real estate guidance note 2012 (drti)
 
Ppp swiss-challenge-route
Ppp swiss-challenge-routePpp swiss-challenge-route
Ppp swiss-challenge-route
 
Pv system introduction project
Pv system introduction projectPv system introduction project
Pv system introduction project
 
Swiss challenge121215
Swiss challenge121215Swiss challenge121215
Swiss challenge121215
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
 

Similar to 150MW Solar RFP Bihar

Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluationChirag Jain
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarPratap Malempati
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfApoorvaR18
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)Sam Lipman
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Procurement of infrastructure projects
Procurement of infrastructure projectsProcurement of infrastructure projects
Procurement of infrastructure projectswil_mia
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016Budi Supomo
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandHeadway Solar
 
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxTax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxREENAALEKSSANDRAACOP
 
PLI-Guidelines-Presentation.pdf
PLI-Guidelines-Presentation.pdfPLI-Guidelines-Presentation.pdf
PLI-Guidelines-Presentation.pdfPaapaJi
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Managementlearnafren
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015Anil Khadka
 
Mscm 3 c-conduct procurement-advertising
Mscm 3 c-conduct procurement-advertisingMscm 3 c-conduct procurement-advertising
Mscm 3 c-conduct procurement-advertisingAlexieMarinelaRamos
 
Opportunities under RERA
Opportunities under RERAOpportunities under RERA
Opportunities under RERAsandesh mundra
 

Similar to 150MW Solar RFP Bihar (20)

Session 18 tender preparation & evaluation
Session 18   tender preparation & evaluationSession 18   tender preparation & evaluation
Session 18 tender preparation & evaluation
 
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind SolarSummary of SECI Tranche III - 1200 MW Hybrid Wind Solar
Summary of SECI Tranche III - 1200 MW Hybrid Wind Solar
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdf
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Procurement of infrastructure projects
Procurement of infrastructure projectsProcurement of infrastructure projects
Procurement of infrastructure projects
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
 
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptxTax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
Tax Report - RR 7-2022, RR 9-2022 [07.18.2022].pptx
 
PLI-Guidelines-Presentation.pdf
PLI-Guidelines-Presentation.pdfPLI-Guidelines-Presentation.pdf
PLI-Guidelines-Presentation.pdf
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Management
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015HYDRO_POLICY_UK_2015
HYDRO_POLICY_UK_2015
 
Mscm 3 c-conduct procurement-advertising
Mscm 3 c-conduct procurement-advertisingMscm 3 c-conduct procurement-advertising
Mscm 3 c-conduct procurement-advertising
 
Opportunities under RERA
Opportunities under RERAOpportunities under RERA
Opportunities under RERA
 

Recently uploaded

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Recently uploaded (20)

Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

150MW Solar RFP Bihar

  • 1. Request for Proposal Document For Setting up of Grid Connected Solar PV Projects coupled with Pisci-culture in Bihar 150 MW
  • 2. Salient Features of RfP Document: • average annual global solar radiation : 4.83 kWh/sq.m • 280 - 300 sunny days • Bihar, making land available for the solar power projects is one of the major barriers in establishment of cost effective grid connected projects • Govt. of Bihar has decided to develop upto 150 MW of Solar Photovoltaic based projects which are to be set-up on the maun/chaur/pond where pisci-culture is being undertaken • Bihar State Power (Holding) Company Limited (BSPHCL), a company engaged in planning, promoting and developing the power sector in the state of Bihar, has been designated by Energy Department, Govt. of Bihar for undertaking the bid process management for selection of the private developers
  • 3. Salient Features of RfP Document: • PPA with North Bihar Power Distribution Company Limited/South Bihar Power Distribution Company limited as intimated by BSPHCL • Term of PPA : 25 years • Total Capacity to be Procured: 150 MW at Delivery point from project plant to be developed on the maun/chaur/pond where pisci-culture is being practiced • Size of each project to be Considered: – Minimum capacity of any individual Project - 2 MW (with a tolerance of +5%) – Maximum capacity of any individual Project - 10 MW (with a tolerance of +5%) • Total capacity of Solar PV Projects to be allocated: maximum of three projects at different locations subject to a maximum aggregate capacity of 30 MW • Bidder shall submit one single application in the prescribed format detailing all projects at multiple locations
  • 4. Qualification Requirements • Eligibility Conditions – Bidder may be a single entity (the “Bidding Company”) or group of entities (the “Bidding Consortium”), coming together to implement the Project – Bidding Company/Bidding Consortium can be a private entity, government owned entity or any combination of them with the legal status as a Private / Public Limited • Financial Criteria – Net Worth: > or = Rs 3 crore per MW for upto 20 MW. For every MW additional capacity, beyond 20 MW , additional net worth of Rs. 2 crore per MW – Bidder has at least twenty six percent (26%) equity in each Company whose accounts are merged in the audited consolidated account – For the purpose of the computation of Net Worth, the last four financial years shall be considered – Single Bidding Company shortlisted in RfP can also execute the project through a Special Purpose Vehicle (SPV). However the SPV has to be formed before signing of PPA keeping the original shareholding unchanged
  • 5. Salient Features of RfP Document: • It is not necessary to have the Technology partner at RfP stage • also not necessary for the Technology partner to have an equity stake in the Bidding • Bidder may seek qualification on the basis of financial capability of its Parent and / or its Affiliate(s) for the purpose of meeting the Qualification Requirements • Net Worth of individuals, whether Director or otherwise, shall not be considered • Technical Criteria – Bidder shall deploy commercially established technology wherein there is at least one project, successfully operational based on the proposed technology of at least One MW, for at least one year, anywhere in the world • Freedom to choose Technology – Bidder is free to choose any Solar PV power generation technology viz Crystalline Silicon Solar Cell Modules / Thin Film Modules / Concentrated PV Modules/any Other Technology manufactured in India or Imported
  • 6. Salient Features of RfP Document: • Submission of Response to RfP by the bidder Envelope I – The Envelope I shall contain the following: i) Bid cost Receipt/Bid cost DD/Pay order for Rs 10,000/- ii) DD/Pay order of @ Rs.2,00,000/- towards Processing Fee of BPIC; iii) Summary Data Sheet (Format 6.10); and iv) Bank Guarantee towards EMD @ Rs. 20 Lacs/MW. Envelope II – Non financial bid – The Envelope II shall contain the following: 1. Covering Letter as per Format 6.1; 2. Power of Attorney to be provided by the Bidding Company/Lead Member in favour of its representative 3. In case of a Bidding Consortium, a Power of Attorney in favour of the Lead Member issued by the other Members of the Consortium shall be provided 4. Draft of Performance Guarantee (to be submitted at the time of signing of PPA)
  • 7. Salient Features of RfP Document: 8. Board Resolutions, as per prescribed formats – Board resolution from the Bidding Company or the Lead Member of the Consortium, as the case may be, in favour of the person signing the response to RfP – Draft of Performance Guarantee (to be submitted at the time of signing of PPA) – Board Resolutions, as per prescribed formats – Board resolution from the Bidding Company or the Lead Member of the Consortium, as the case may be, in favour of the person signing the response to RfP 9. Format for Financial Requirements as per Format 10. Format for Technical Criteria wherein Bidder shall provide the details of the technology proposed to be adopted for the project 11. evidence regarding its successful operation in any of the projects for at least one year as per Format 12. A letter from the STU/Discom (as applicable) confirming “in-principle” connectivity of the Project as per Format 13. A disclosure statement as per Format 6.9 regarding participation of any related companies in this bidding process
  • 8. Salient Features of RfP Document: 8. A disclosure statement as per Format 6.9 regarding participation of any related companies in this bidding process 9. Details of the Proposed Technology as per Format 10. Submission of financial bid (blank) as per Format 11. Initialed RfP documents including PPA duly signed as acceptance. Envelope III – Financial bid The Envelope III shall contain the following: i) Financial Bid as per Format 6.13; ii) Bid Bond as per the Format 6.3B; • The Bidder shall submit the discount on the Net Levelised tariff as declare by BERC at the Delivery Point • The Bidder’s can submit more than one Bid for different Projects, provided that no two Projects are located at single location
  • 9. Salient Features of RfP Document: • Selection of Solar PV and Project commissioning shall be carried out according to the timeline given below:- Sl.No Event Date 1 Notice for Request for Proposal (RfP) Zero Date 2 Response/Clarification on RfP 15 days from issue of RfP (zero date + 15 days) 3 Pre-bid Meeting 17 days from issue of RfP (zero date + 17 days) 4 Clarifications to be issued on RfP and issue of revised RfP (if req.) 21 days from issue of RfP (zero date + 21 days) 5 Submission of Response to RfP with documents 90 days from issue of RfP (zero date + 90 days) 6 Technical Evaluation of Bids received in response to RfP Within 7 days from receipt of response to RfP (zero date + 97 days)
  • 10. Salient Features of RfP Document: Sl.No Event Date 7 Approval of Bid Evaluation Committee for opening of Financial Part of RfP Within 10 days from receipt of response to RfP (zero date + 100 days) 8 Opening of Financial Part of RfP Within 15 days from receipt of response to RfP (zero date + 105 days) 9 Issue of letter of Intent Within 15 days from opening of the price part of proposals (zero date + 120 days) 10 PPA Signing Within 15 days from the date of issue of Letter of intent (LoI date + 15 days) 11 Financial closure of the project Within 240 days from the date of signing of PPA (LoI date + 255 days) 12 Commissioning of Solar PV Plant 24 months from the date of signing of the PPA
  • 11. Bank Guarantees 1 Earnest Money Deposit (EMD) @ Rs. 20 Lacs / MW for each project in the form of Bank Guarantee along with Bid (valid for a period of 210 days from the last date of submission of the Bid) 2 Bid Bond @ To be calculated on the basis of percentage discount offered by bidder (valid for a period of 210 days from last date of submission of Bid) 3 Performance Guarantee @ Rs. 50 Lacs/ MW plus amount equivalent to Bid Bond / MW for each project in the form of 03 Nos. of Bank Guarantee in the ratio of 20%, 40% & 40% at the time of signing of PPA (valid for a period of 16 months from the date of signing of PPA) 4 Bank Guarantees have to be executed on non-judicial stamp paper of appropriate value as per Stamp Act relevant to place of execution 5 The Bank Guarantees towards EMD and Bid Bond of all unsuccessful Bidders will be released within sixty days of the signing of the PPA with the Selected Bidder(s)
  • 12. Salient Features of RfP Document: • Financial Closure/Project Financing: Within 180 days from PPA Signing • 180 daysMilestone Time Period from the Signing of the PPA Documentary Evidence to be produced to BREDA / NBPDCL / SBPDCL Engagement with the local fisher communities Three Months Confirmation of the arrangement between the project developer and the fisher community from the concerned local panchayat / revenue official No-Objection Certificate from State Pollution Control Board (If required) Four Months Copy of the Approval Letter from SPCB Placement of Order/Agreement signing for purchase of plant and machinery for the project Four Months Order/Agreement Copy
  • 13. Milestone Time Period from the Signing of the PPA Documentary Evidence to be produced to BREDA / NBPDCL / SBPDCL Payment of requisite advance or opening of irrevocable letter of credit with suppliers/contractors Five Months Receipt of payment from the Supplier/Contractor Clear Possession of land @ 2.5 Hectares/MW (minimum) Eight Months (Certificates from required authorities as mentioned below) •Ownership or lease hold rights from State agency only (for at least 30 years) in the name of the Project Developer and possession of 100% of the area • Certificate by the concerned and competent revenue / registration authority for the acquisition / ownership / vesting of the Land • Certificate by the concerned and competent revenue / registration authority regarding the classification of the land as maun/ chaur/ ponds • Sworn affidavit from the Authorized person of the developer listing the details of the land and certifying total land required for the project under clear possession of the Project Developer Financial Closure EIght Months Copy of the Sanction Letter
  • 14. Salient Features of RfP Document: • Commissioning Schedule and Penalty for Delay in Commissioning – Project shall be commissioned within 24 (Twenty Four) months from the date of signing of PPA – BSPHCL/Procurer(s) shall encash the Performance Guarantee – Delay up to one month – 20% – Delay of more than one month and up to two months - 40% – Delay of more than two months and up to three months - remaining Performance Bank Guarantees – PART COMMISSIONING IS ALLOWED & PBG WILL BE ENCASHED ON PROPORTION OF PROJECT COMMISSIONED – Delay beyond 3 (three) months then Liquidated Damages (LD) @ Rs.1,00,000 per MW per day of delay • Part Commissioning is allowed for minimum 2 MW and multiples thereof
  • 15. Important dates • Last date for online sale of Tender document: 14th August, 2013 up to 17.00 hrs • Last date for online submission of Tender: 16th August, 2013 up to 13.00 hrs • Opening of Technical Bid: 16th August, 2013 at 15.00 hrs