Packing Process Control Leader

809 views

Published on

My CV

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
809
On SlideShare
0
From Embeds
0
Number of Embeds
27
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Packing Process Control Leader

  1. 1. Abdullah A. Al-Ghubari Process Control Leader Contact Information Dammam, Saudi Arabia Mobile : +966556185140 (Saudi Arabia) Mobile 2 : +962799832157 (Jordan) E-Mail : alghubari.aa@hotmail.com : alghubari.aa@pg.com Personal Information Full Name : Abdullah Abd El-Hadi Al-Ghubari Nationality : Jordanian Resident of : Saudi Arabia, Dammam Gender : Male Marital Status : Married Place & Date of Birth : Amman, 26th Oct, 1981. Education Information University Education Institution : Al-Balqa Applied University Degree: : Bachelors of Engineering Major : Chemical Engineer Location : Amman-Jordan Date of graduation : Feb. 2006 Grade : 2.89/4.00 (Good) College Education Institution : Amman College For Engineering Technology Degree: : Diploma Major : Chemical Industries Technology Location : Amman-Jordan Date of graduation : July 2001 Grade : 74.7 (Al-Shamel Exam) Languages Arabic English Reading Excellent Very good Written Excellent Very good Spoken Excellent Very good Memberships Organization : Jordan Engineers Association Membership Type : Annual Member Since : March. 2006 Status : Active Organization : Saudi Council of Engineers Membership Type : Annual Member Since : Jan. 2011 Status : Active Computer Skills Windows family, Microsoft Office ( Word, Excel, Power Point) Familiar with Applications : Wonderware Intouch, System Platform, Active Factory & Rockwell Automation: Rsview, Factory Talk Quality Window 4.5 , 5.0 ( Statistical Process Control) Good Knowledge in Equipment Sizing, Process Design &P&ID Diagrams. 1/5
  2. 2. Abdullah A. Al-Ghubari Process Control Leader Professional Experience Dates : Aug 2011 – present 1 Position in Company : Packing Liquids Process Control Systems Leader Dates : April 2009 – Aug 2011 2 Position in Company : Making Liquids Process Control Systems Leader Dates : Jan 2007 – April 2009 3 Position in Company : Process Engineering Systems Leader Company Name : (Procter & Gamble Company) Dammam Plant – Saudi Arabia Company Address : Saudi Arabia 1 Dates : April 2006– Jan 2007 Position in Company : Operation Engineer 2 Dates : June 2003– April. 2006 Position in Company : Central control Room Operator Company Name : Arab Company for white Cement Industry Company Address : Jordan Dates : Sep. 2001– Dec 2002 Position in Company : Laboratory Technician Company Name : Jordan Carbonate Company Company Address : Jordan Packing Process Control Leader Responsibilities: 1.Managing the standard, centerline and setting across packing lines. 2.Leading/Managing continuous improvements. 3.Leading the improvement in Process Control Strategy. 4.Driving reapplication of success. 5.Analyzing and prioritizing losses using integrated work systems tools (Process Reliability, stops, breakdowns, process failures, Maintenance &Repairing spending, etc.). 6. Systematizing the tracking tools and troubleshooting procedures. 7. Building technical expertise/leadership across the packing Process Control department. 8. Leading failure analysis to root cause for packing lines. 9. Standardizing procedures and planned work orders for packing lines operation. 10. Benchmarking the results from other departments and other plants. 11. Building on current systems (Centerlines, change-over checklists, etc.). 12. Building long-term capability into equipment owners and lines operators. 13. Staying linked to initiatives and major capital projects. 14. Developing and implementing new area leaders (QA, Safety, and Process Control….etc). 15. Leading implementation of improvement projects. 16. Working with inside & outside experts. 17. Securing funding as needed 18. Leading Packing Lines Automation and Line Integration Process. In addition to all below Roles & Responsibilities. 2/5
  3. 3. Abdullah A. Al-Ghubari Process Control Leader Making Process Control Leader Responsibilities: 1. Approve Formula Cards and Manufacturing Standards. Process Engineering & Process Control 2. Approve Process Related Standard operating Procedure. 3. Monitor, update and set all process Conditions and Centerlines. 4. Improve department process capability and operation personnel. 5. Change control revision, approval and follow-up. 6. Lead Process Optimization and Saving Projects. 7. Lead Quality incident, Quality Failures & Process Failures Investigations. 8. Insure all Quality, Microbiology & Safety Systems is applied in any change or improvement in the process 9. Lead, Manage and Develop Process Control Strategy. 10. Review Calibration scheduling, results and approval. 11. Issue Statistical Process Control, Process Control Parameters and Analyzing the Historical Data. 12. Review and Approve IQ, OQ, PQ protocols and reports for systems, utilities and equipment. 13. Review and Approve Cleaning and Sanitization Protocols. 14. Originate Validation Master Plan & Master List. 15. Contribute on Process Safety Study (PSS). 16. Contribute on Process HAZOP Analysis (PHA). Process Study 17. Contribute on Product Quality Trade Survey. 18. Lead Process Design Reviews. 19. Contribute on qualifying new Raw Material Suppliers. 20. Contribute on Microbiology Risk Assessment. 21. Lead Vendor Acceptance Test for New Projects. (VAT) 22. Develop and implement technological content for plant monitoring and performance reports of assigned units. Management 23. Review & Approve End to End Design and P&ID. Projects 24. Lead projects Start-up. 25. Lead Commissioning Phase for Equipment and Software. 26. Lead Qualification Phase and Contribute on Verification Phase. 27. Monitor and Approve Projects schedule and activities. 28. Handle Making Department & Raw Material tracking systems Management 29. Issue Process Reliability Reports Operation 30. Issue Making department Production Reports 31. Troubleshoot all Process Failures & Production issues 32. Train Operation Personnel in all Process Control Procedures 33. Monitor Material utilization Vs Actual Production 3/5
  4. 4. Abdullah A. Al-Ghubari Process Control Leader Rewards & Recognitions Procter & Gamble Golden Award FY (07/08) ( Projects Start-up Support) – Presented By the CEEMEA HHC Associate Director (My 3rd Managerial Level) Procter & Gamble Golden Award FY (08/09) (Saving Projects) – Presented By DCF Supply Chain Manager Procter & Gamble Golden Award FY (09/10) (Leading Projects Start-up) – Presented By DCF Supply Chain Manager Procter & Gamble Platinum Award FY (09/10) (CEEMEA Best Project Achieved Vertical Start Up) – Presented By Global Household Care Directors (My 4th Managerial Level). Procter & Gamble Quarterly Award FY (10/11) (Best Global Start-Up Management Implementation) – Presented By Initiative Management Leader Procter & Gamble Pearl Award FY (10/11) (High Contribution to Earth Week) – Presented By Site Health, Safety & Environment Leader Procter & Gamble Quarterly Award FY (10/11) (Achieving Process Control Strategy Targets) – Presented By Site Quality Assurance Leader Procter & Gamble Platinum Award FY (10/11) Significant Improvement in Batch Cycle Time and Process Reliability led to Cost and Time Saving – Presented By Dammam Plant Leader. Courses and Trainings: No. Training Title Location Dates Dur. Quality Assurance & Quality Control 1 Total Quality Tools (TQT) Saudi Arabia 14th Feb 2007 1 Day 2 Total Quality Fundamentals (TQF). Saudi Arabia 16th Feb 2007 1 Day 3 Product Quality Matrix (PQMA). Saudi Arabia 17th March 2007 1 Day 4 Process Validation Saudi Arabia 18th March 2007 1 Day 5 Product Quality Measures (PQM). Saudi Arabia 22nd March 2007 1 Day 6 Quality Window (QW 5.0) Saudi Arabia 17th– 18th Apr 2007 2 Days 7 Leading Quality Incident Investigation Saudi Arabia 12th –13th May 2007 2 Days 8 Quality Pillar (QP). Saudi Arabia 3rd May 2007 1 Day 9 Quality Incident Elimination Methods Saudi Arabia 3rd– 4th Jun 2007 2 Days 10 Self Improvement Procedure (SIP). Saudi Arabia 9th June 2007 1 Day 11 Microbiology –Engineering workshop Saudi Arabia 1st – 2nd July 2007 2 Days 12 Quality Incidents (QI). Saudi Arabia 14th July 2007 1 Day 13 Quality Assurance Key Elements Bahrain 27th – 31st Oct 2007 5 Days 14 Quality Maintenance Workshop Saudi Arabia 26th -30th Jan 2008 5 Days 15 Quality Related Losses (QRL). Saudi Arabia 1st Dec 2008 1 Day Process Control 16 Process Control Strategy Saudi Arabia 1st March 2007 1 Day 17 Process Control School United Kingdom 21st –25th Jun 2008 4 Days 18 Wonderware Intouch 10.1 Saudi Arabia 24th –28th Jan 2010 5 Days 19 Bringing Process Control Strategy to life Saudi Arabia 7th – Aug 2010 1 Day 20 Awareness in Process Control Strategy Saudi Arabia 4th – Dec 2010 1 Day Microbiology 21 Microbiology Management System Saudi Arabia 21st Dec 2008 1 Day 22 Advance Microbiology Management Saudi Arabia 3rd– 4th May 2009 2 Days 23 Microbiology Daily Management Saudi Arabia 21st Dec 2008 1 Day 24 Integrated Readiness System (IRS) Saudi Arabia 20th June 2009 1 Day 4/5
  5. 5. Abdullah A. Al-Ghubari Process Control Leader No. Training Title Location Dates Dur. Project Management 25 Engineering Work Processes (EWP) Saudi Arabia 21st June 2009 1 Day 26 Project Assessment Tool (PAT) Saudi Arabia 22nd June 2009 1 Day 27 Technical Engineering Documentations Saudi Arabia 23rd June 2009 1 Day 28 Global Start Up Management School Egypt 7th- 10th June 2010 3 Days 29 Initiative Management awareness Saudi Arabia 13th – April 2009 1 Day 30 Project Loss Analysis Tool(PLAT) Saudi Arabia 28th – Oct 2009 1 Day Process Management Technologies 31 PID control loop Health Check Romania 5th – 10th Oct 2011 5 Days 32 Late Product Differentiation systems Czech Republic 1st –5th April 2008 4 Days 33 Liquid Packing Technology United Kingdom 22nd –28th Jan 2008 5 Days 34 Vendor Acceptance Tests Czech Republic 2nd –7th July 2009 5 Days 34 Packing Technologies Italy 18th –22nd Feb 2008 5 Days Management & Leadership 35 Loss Analysis Training Saudi Arabia 8th Feb 2009 1 Day 36 High Performance Organization Saudi Arabia 18th Feb 2009 1 Day 37 Effective Business Writing. Saudi Arabia 22nd April 2009 1 Day 38 Effective Time Management Saudi Arabia 23rd June 2009 1 Day 39 Coaching for Every Body Saudi Arabia 12th - Aug 2009 1 Day 40 People & Communication Skills Saudi Arabia 27th–28th Dec 2009 2 Day 41 Unified Problem Solving Saudi Arabia 15th–18th Nov 2010 3 Days 42 Effective Team meeting Saudi Arabia 17th Dec 2010 1 Day 43 Effective Presentation Skills Saudi Arabia 23rd Jan 2011 1 Day Diploma in Business Management & 44 Saudi Arabia 25th Nov 2010 5 Days Entrepreneurship 45 Fundamentals of Corporate Management Saudi Arabia 26th Nov 2010 1 Day 46 Fundamentals of Project Management Saudi Arabia 4th March 2011 1 Day 47 Fundamentals of Operations Management Saudi Arabia 5th March 2011 1 Day 48 Fundamentals of Human Resources Saudi Arabia 6th March 2011 1 Day 49 Diploma in Project Management Saudi Arabia 13th March 2011 5 Days 50 Fundamentals of Accounting Saudi Arabia 14th Jan 2011 1 Day 51 Fundamentals of Economics Saudi Arabia 15th March 2011 1 Day 5/5

×