SlideShare a Scribd company logo
1 of 34
Download to read offline
Our Yuhua
Our Home
Jurong Town Council
5-Year Concept
Master Plan
2016-2020
A Better Environment for All
Dear Friends & Residents,
Our Jubilee year is a good time
to take stock of developments
and plan for our future.
In this small exhibition we show
some of the things the Town
Council has done, is doing, and
will do in the future, to help
build a better home for you in
Yuhua
A Better Environment
Rejuvenating our Neighbourhood
Lift Upgrading Programme (LUP)
• LUP provides direct lift access to all the
floors & Improves mobility
• 98 % of the eligible flats in Yuhua have
completed LUP
• Upcoming LUP
– Blk 214 Jurong East Street 21
(3 Benefiting Units)
– Blk 346 Jurong East St 31
(3 Benefiting Units)
– Blk 348 Jurong East St 31
(8 Benefiting Units)
Rejuvenating our Neighbourhood
Neighbourhood Renewal Programme (NRP)
• The NRP was
introduced in Aug 2007
focuses on block and
precinct improvements.
• 94 % of the eligible
precincts (about 8,312
units) have completed
Interim Upgrading
Programme/NRP or
currently undergoing
NRP at various stages
NRP at Blk 221 to 228, 221A, 223A and 225A Jurong East St 21
Rejuvenating our Neighbourhood
Neighbourhood Renewal Programme (NRP)
Upcoming NRP
- Blks 246 to 253
Jurong East St 24
- 3RD Qtr 2016-
1st Qtr 2018
BLK
252
BLK 255.
BLK
258
BLK
256
Rejuvenating our Neighbourhood
Remaking Our Heartland(ROH)
Launched in 2007, ROH aims to rejuvenate public housing
estates to bring about a holistic transformation.
Upgrading of Neighbourhood Centre 2 consisting of
Blks 252 & 253 Jurong East St 24.
Estimate Completion Date : 3Q 2017
Upgrading of Neighbourhood Centre 3 consisting
of Blks 343 to 354 Jurong East St 31.
Estimate Completion Date : 1H 2017
Interim Estate
Upgrading
Programme
(I-EUP)
• I-EUP aimed to improve
the amenities and offer
improvement work at the
older private housing
estates. Under the I-EUP,
we have build covered
link way outside Ivory
Heights Condominium & 2
rain shelters outside
Westmere Condominium 2 Rain shelters
outside Westmere
Rejuvenating our Neighbourhood
Covered Linkway from
Bus-stop to Rear Gate of
Ivory Heights
Renewing Our Homes
Home Improvement Programme (HIP)
• HIP addresses common maintenance
problems, like the repair of spalling
concrete, replacement of waste
pipes, upgrading of
toilets/bathrooms, replacement
entrance door and refuse chute
hoppers etc. Highly subsidized by the
government
• 24 % of the eligible flats (2,013 units)
are currently undergoing HIP at the
various stages
• HIP approved in FY 2015
– Blocks 241-251 Jurong East St 21
– Blocks 101-116 Jurong East St 13
Upgrading of Toilet/ bathrooms
Replacement of
waste/soil discharge
stacks
Renewing Our Homes
Enhancement for Active Seniors (EASE)
EASE has been
offered to HDB
flats in all towns
since 2013. This
will benefit the
elderly who may
wish to get the
improvements
earlier before
the HIP, or
whose blocks did
not qualify for
HIP.
A Better Home for All
Completed Improvement Projects
• Since 2011, Jurong Town Council has
spent $2.5m on various Town
Improvement projects to improve the
overall living environment
• We have build
– Covered linkways
– Drop-off points
– Sheltered ramps
– Block signs & Noticeboards
– New design letterboxes
– Recreational and exercise facilities such as
hard courts, jogging tracks, playgrounds, multi-
generation fitness corners, games courts &
Futsal court
– Community gardens
– Residents’ corners
• Over the next 5 years , another $ 2.5 m
to be spent to provide more
improvement works
COVERED LINKWAY FROM BLOCKS 217 TO 215
JURONG EAST STREET 21
COVERED LINKWAYS BLOCKS
328 JURONG EAST STREET 21
A Better Home for All
Completed Improvement Projects
DROP-OFF POINT AT BLK 113 JURONG EAST ST 13
DROP-OFF POINTS AT
BLKS 260, 261, 263 & 264 JURONG EAST ST 24
SHELTERED
RAMP AT
BLK 260 JURONG
EAST STREET 21
SHELTERED RAMP
AT BLK 218
JURONG EAST ST 21
A Better Home for All
Completed Improvement Projects
LIGHTED BLOCK NUMBER SIGNS AT
JURONG GATEWAY ROAD, JURONG EAST
STREET 21 AND JURONG EAST STREET 24
FITNESS CORNER AT BLK 242 JURONG EAST ST 24
PLAYGROUND AT BLOCK 317
JURONG EAST STREET 31
UPGRADED JOGGING TRACK,
PAVILION AND FOOTPATH NEAR
BLOCK 255 JURONG EAST ST 24
After
A Better Home for All
Upcoming Improvement Projects from 2016
Construction of 3G Playground at
Block 209 Jurong East St 21
Before
Before
After
A Better Home for All
Upcoming Improvement Projects from 2016
High Covered Linkway cum drop-off point from
- Block 322 to 322A &
- Block 323 to 325 Jurong East St 31
Before
After
A Better Home for All
Upcoming Improvement Projects from 2016
Modification of Drop-off Points at
Blocks 101 to 116 Jurong East St 13
After
A Better Home for All
Upcoming Improvement Projects from 2016
Construction of 3G Playground at
Block 264 Jurong East St 24
Before
After
A Better Home for All
Upcoming Improvement Projects from 2016
Construction of 3G Playground at
Block 327 Jurong East St 31
Before
A Better Home for All
Upcoming Improvement Projects from 2016
An innovative Sensory Park will
be built at the existing
Neighbourhood Park near Blks
257-263 Jurong East St 24.
The sensory park will have a
variety of texture which
residents could see, feel, touch
and smell so as to bring more
fun to the residents’ outdoor
activities.
Taking care of what we have …
• Since 2011, Jurong Town Council has spent
$12.1m in:
– Repairs and Redecorations (R&R)
– Re-roofing work
– Replacement of water pipes
– Replacement of booster pumps
– Replacement of refuse chute flushing system
– Replacement of water tanks lining
• Another $9.8m will be spent in the next 5 years
• Upcoming R&R
-Blks 254, 317 to 328, 318A, 322A, 342 to 353
-Blks 101 to 107, 209 to 214, 130 to 135
Repainting to Blocks 108
to 116 Jurong East St 13
Repainting to Blocks 215 - 231, 215A,
217A, 219A, 221A, 223A & 225A
Repainting to
Blocks 255 to 264
Jurong East St 24
Replacement of roof membranes
Replacement of Lining to
Stainless Steel Water Tanks
Replacement of Booster Pumps
Taking care of what we have …
Rescreeding of void deck & apron
LED
• We are the 1st Town Council to adopt this
innovation for lighting up our common areas.
The Town Council has saved about $1.13 m
per year since the installation of LED lightings
in HDB estates since 2010.
Test bedding new ways to do work …
Solar Leasing Project
• HDB has installed solar panels at Blocks 246,
247, 248 and 251 Jurong East St 24 in 2011 as
a test bed project to harness solar energy
• The precinct was awarded the BCA Green
Mark Gold Plus Award in 2011
• Going forward, another 41 blocks of HDB flats
will be installed with solar panels by 1st Qtr
2016.
Police cameras
• To improve security for
our residents, we have a
tie-up project with the
Police – the Polcam
• 31 Blocks Installed
• 80 Blocks for future
installation by 2016
Test bedding new ways to do work …
Community Parklet Dual deck bicycle deck
Vertical greenery Solar Panels
Pneumatic Waste
Conveyance System
LED light
Rainwater Harvesting
Green roof
 Launched in 2012, 38 blocks of flats at Blocks 209-240 Jurong East St 21 will be transformed into an eco-friendly
neighbourhood by end of 2015.
 The project costs $23 m.
 1st matured estate to embrace eco-friendly features such as the Pneumatic Waste Conveyance System, solar panels, outdoor
LED street lightings, elevator energy regenerative system, water & electrical sub-meters, rain water harvesting system, green
roof, vertical greenery, community garden, dual bicycle racks and community parklets.
Test bedding new ways to do work …
 Jurong Lake District will become a
mini version of a "smart city"
 Above-ground boxes connected to
fiber-optic lines will be deployed
across at street lights or bus stops.
 These new boxes can be hooked
up to sensors to detect air
pollutants, heavy rainfall, traffic
jams, Township management etc
 Some 9,000 residents living in
Jurong East (3,194 flats) will be the
first to experience “Smart living”
 Residents can also look forward to
a more liveable, efficient,
sustainable and safe environment.
Test bedding new ways to do work …
Solar powered surveillance
cameras, traffic sensors
and other instruments will
gather data in Jurong
testbed that all government
agencies can share.
Smart Home
Smart Neighbourhood
• Elderly Monitoring Systems
• Home Energy Management
• Home Water Management
System
• Smart Solar Energy
Monitoring System
• Smart Pneumatic Waste
Conveyance System
• Smart Electrical Sub-meters
• Remote Water Meters
• Smart Noticeboards
Test bedding new ways to do work …
Smart Home
Smart Noticeboards
Car Park Improvement Work
• HDB has upgraded 85% the surface
carparks in Yuhua
• HDB has constructed additional car and
motorcycle lots at Blk 101, 222/226,
246/248 & 263
• HDB will be building a temporary car park
next to Block 254, a very popular market
and food centre to meet the increased
demand for parking lots
Making it easier to move around …
Electronic Parking System
Implementation
• As of August 2015, EPS has been
implemented in 13 car park
• 9 carparks in progress (4Q 2015-1 Q2016)
Additional car and motorcycle lots at Blk 101
Electronic Parking System at Blk 234
Road & Improvement
• LTA has widened Jurong Town Hall Road
and Jurong East St 11/21 & constructed
new roads Jurong Gateway Road and
Gateway Drive
• Introducing cycling path as part of Jurong
Lake ROH programme
• Covered walkway within 400m radius
from Chinese Garden MRT Station under
the Walk-2-Ride scheme
Making it easier to move around …
Adding ramps and shelter to the existing pedestrian
overhead bridge across Boon Lay Way near Yuhua CC
Widened Jurong Town Hall Road
• Adding ramps and
shelter to the
existing pedestrian
overhead bridge
across Boon Lay
Way near
Yuhua CC Adding ramps and shelter
MRT Rail Improvement
• Installation of noise barrier at the
MRT viaduct along Boon Lay Way
near to Blk 110 Jurong East St 13 and
Jurong East Central
• A new platform and track have been
build at Jurong East MRT station to
hasten the traffic boarding and
alighting to and from the North South
(NS) Line and East West(EW) Line
trains
• Another 57 trains to the NS and EW
lines
• Opening of Downtown Line Stage 2 in
Dec 2015
• Jurong Region Line and Cross Island
Line in future by 2025
Making it easier to move around …
Noise barrier at the MRT viaduct along
Boon Lay Way near to Blk 110
A new platform and track have been build at
Jurong East MRT station
New Public Housing
• HDB will be building 2
residential blocks ( 225
dwelling units) at the open
space infront of Blk 236
Jurong East St 21
• It is served with a 6-storey
MSCP and well connected
covered linkway, and
facilities such as precinct
pavilion, playgrounds and
roof garden at MSCP
• The project will start in 2Q
2015 and complete by 2Q
2019
Bringing People Closer to Nature …
A beautiful & natural Jurong Lake Gardens will be a
reality in a few years.
1st Phase- Completion of Jurong Lake Gardens
West (beside Taman Jurong) by 2017
2nd Phase- Jurong Lake Gardens East and Jurong
Lake Gardens Central in 2020
Jurong Lake Gardens
Jurong Lake District
• In the next 10-15 years, the
Jurong Lake District is poised to
be the next destination for
leisure and business
• From public parks to water front
hotels, the district brims with
new and comprehensive
developments
• It will also be the terminus for
the Singapore/Kuala Lumpur
High-speed rail to facilitate
seamless travel between Kuala
Lumpur and Singapore, and
bring the people of Malaysia and
Singapore closer together
New Development In Jurong Gateway
• In 2008, the URA unveiled the
blue print to transform Jurong
into the biggest regional centre
outside of the Central Business
District
• When fully completed, the
District will have more than
500,000 sqm of office space and
250,000 sqm of retail space,
1,000 more homes and at least
2,800 hotel rooms.
J-Cube & Canopy
Big Box
Devan Nair Institute for Employment
and Employability
Ng Teng Fong General Hospital and
Jurong Community Hospital
Genting Hotel
JEM
Westgate
More Community Gardens will be built in our Town.
From neighbours to friends …
The Town Council will organise more such NRP exhibitions to
allow residents to discuss with their neighbours & friends on the
facilities that they desire under the programme
More Sports & Recreational Facilities and communal space will
be built to encourage community bonding
Futsal court at Blk 209 Community parklet at Blk 229
Our Social Service Centres
1. Yuhua Neighbourhood Link
2. Blue Cross Thong Kheng Home
3. Aspiration Wan Qing Lodge
4. Singapore Buddhist Free Clinic
5. St Luke’s Eldercare (Jurong East Centre)
6. Tzu Chi Free Health Screening Centre
7. All Saints Nursing Home – Jurong East
8. Loving Heart Multi-Service Centre
Caring for those who need our help …
All Saints
Nursing Home
– Jurong East
New Year Hong Bao for the Elderlies Prosperity Rice Distribution Visit to Thong Kheng Home

More Related Content

What's hot

Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356
Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356
Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356CTY CP TƯ VẤN ĐẦU TƯ THẢO NGUYÊN XANH
 
les jardins japonais
les jardins japonais les jardins japonais
les jardins japonais ImeneBoulbir
 
Análise detalhada do projeto
Análise detalhada do projetoAnálise detalhada do projeto
Análise detalhada do projetocileneaiette
 
Thuyết minh dự án chung cư thương mại
Thuyết minh dự án chung cư thương mạiThuyết minh dự án chung cư thương mại
Thuyết minh dự án chung cư thương mạiLẬP DỰ ÁN VIỆT
 
Programa e Pré-dimensionamento
Programa e Pré-dimensionamentoPrograma e Pré-dimensionamento
Programa e Pré-dimensionamentogrupo1projetoe
 
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte     ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte Andre Pestana
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system worksHardik Parmar
 
Expoé jardin
Expoé jardin Expoé jardin
Expoé jardin Rofi Cad
 

What's hot (20)

Programa de necessidades
Programa de necessidadesPrograma de necessidades
Programa de necessidades
 
Thuyết minh dự án Trung tâm Hội nghị quốc tế và Văn phòng cho thuê tại TPHCM ...
Thuyết minh dự án Trung tâm Hội nghị quốc tế và Văn phòng cho thuê tại TPHCM ...Thuyết minh dự án Trung tâm Hội nghị quốc tế và Văn phòng cho thuê tại TPHCM ...
Thuyết minh dự án Trung tâm Hội nghị quốc tế và Văn phòng cho thuê tại TPHCM ...
 
Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356
Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356
Thuyết minh dự án Nhà máy xử lý chất thải Gia Viễn - Ninh Bình 0918755356
 
les jardins japonais
les jardins japonais les jardins japonais
les jardins japonais
 
Thuyết minh dự án đầu tư Logistic thủy nội địa tỉnh Hải Phòng | duanviet.com...
 Thuyết minh dự án đầu tư Logistic thủy nội địa tỉnh Hải Phòng | duanviet.com... Thuyết minh dự án đầu tư Logistic thủy nội địa tỉnh Hải Phòng | duanviet.com...
Thuyết minh dự án đầu tư Logistic thủy nội địa tỉnh Hải Phòng | duanviet.com...
 
Análise detalhada do projeto
Análise detalhada do projetoAnálise detalhada do projeto
Análise detalhada do projeto
 
Patrimoine "Djemila"
Patrimoine "Djemila"Patrimoine "Djemila"
Patrimoine "Djemila"
 
Estudo de sombreamento
Estudo de sombreamentoEstudo de sombreamento
Estudo de sombreamento
 
Thuyết minh dự án chung cư thương mại
Thuyết minh dự án chung cư thương mạiThuyết minh dự án chung cư thương mại
Thuyết minh dự án chung cư thương mại
 
Programa e Pré-dimensionamento
Programa e Pré-dimensionamentoPrograma e Pré-dimensionamento
Programa e Pré-dimensionamento
 
Đồ án tốt nghiệp: Thư viện tổng hợp, HAY
Đồ án tốt nghiệp: Thư viện tổng hợp, HAYĐồ án tốt nghiệp: Thư viện tổng hợp, HAY
Đồ án tốt nghiệp: Thư viện tổng hợp, HAY
 
Xây dựng nhà máy chế biến sữa dê và các sản phẩm từ sữa dê Măng Đen tỉnh Kon ...
Xây dựng nhà máy chế biến sữa dê và các sản phẩm từ sữa dê Măng Đen tỉnh Kon ...Xây dựng nhà máy chế biến sữa dê và các sản phẩm từ sữa dê Măng Đen tỉnh Kon ...
Xây dựng nhà máy chế biến sữa dê và các sản phẩm từ sữa dê Măng Đen tỉnh Kon ...
 
Perkembangan furniture
Perkembangan furniturePerkembangan furniture
Perkembangan furniture
 
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte     ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte
ABCEM / CONSTRUMETAL - Museu do Amanhã: Uma Obra de Arte
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
 
Moshe Safdie na Arquitetura
Moshe Safdie na ArquiteturaMoshe Safdie na Arquitetura
Moshe Safdie na Arquitetura
 
Tabacop
TabacopTabacop
Tabacop
 
Dự án nhà máy xử lý chất thải, tái chế phế liệu Tỉnh Nam Định - duanviet.com....
Dự án nhà máy xử lý chất thải, tái chế phế liệu Tỉnh Nam Định - duanviet.com....Dự án nhà máy xử lý chất thải, tái chế phế liệu Tỉnh Nam Định - duanviet.com....
Dự án nhà máy xử lý chất thải, tái chế phế liệu Tỉnh Nam Định - duanviet.com....
 
Expoé jardin
Expoé jardin Expoé jardin
Expoé jardin
 
Utilitas 2 lift dan elevator
Utilitas 2 lift dan elevatorUtilitas 2 lift dan elevator
Utilitas 2 lift dan elevator
 

Viewers also liked

Virtual field trip to jurong point
Virtual field trip to jurong pointVirtual field trip to jurong point
Virtual field trip to jurong pointPhiew Woo
 
5 Year Strategic Plan for Growth at Progresso Soup
5 Year Strategic Plan for Growth at Progresso Soup5 Year Strategic Plan for Growth at Progresso Soup
5 Year Strategic Plan for Growth at Progresso SoupRedmond_Boston
 
GE2015 Yuhua Manifesto
GE2015 Yuhua ManifestoGE2015 Yuhua Manifesto
GE2015 Yuhua ManifestoYuhuaSMC
 
Presentation ECIA: Materials for the Creative Industries
Presentation ECIA: Materials for the Creative IndustriesPresentation ECIA: Materials for the Creative Industries
Presentation ECIA: Materials for the Creative IndustriesECIAonline
 
Maintaining Market Leadership through Customer Focus
Maintaining Market Leadership through Customer FocusMaintaining Market Leadership through Customer Focus
Maintaining Market Leadership through Customer FocusSVPMA
 
Trend analysis.pptx
Trend analysis.pptxTrend analysis.pptx
Trend analysis.pptxBakhon
 
Management Tools and Trends 2011
Management Tools and Trends 2011Management Tools and Trends 2011
Management Tools and Trends 2011guitartp
 
Bmw Creativity & Innovation
Bmw Creativity & InnovationBmw Creativity & Innovation
Bmw Creativity & InnovationKartik Karemore
 
Publishing Expo 2008 Presentation
Publishing Expo 2008 PresentationPublishing Expo 2008 Presentation
Publishing Expo 2008 PresentationFernando Samaniego
 
Audi ludhiana launch media coverage - ver 1.1
Audi ludhiana launch  media coverage - ver 1.1Audi ludhiana launch  media coverage - ver 1.1
Audi ludhiana launch media coverage - ver 1.1gautamgandhi1972
 
Being Good Isn't Good Enough: Become a Market Leader
Being Good Isn't Good Enough:  Become a Market LeaderBeing Good Isn't Good Enough:  Become a Market Leader
Being Good Isn't Good Enough: Become a Market LeaderAndrew Townley
 
Volvo xc 90 Excellence - Launch Event
Volvo xc 90 Excellence - Launch EventVolvo xc 90 Excellence - Launch Event
Volvo xc 90 Excellence - Launch EventGaurav Sharma
 
Hino Truck & Bus - Parts Catalogue Q2 2015
Hino Truck & Bus - Parts Catalogue Q2 2015Hino Truck & Bus - Parts Catalogue Q2 2015
Hino Truck & Bus - Parts Catalogue Q2 2015CMVGroup
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
Seminar Hino Genuine OIl
Seminar Hino Genuine OIlSeminar Hino Genuine OIl
Seminar Hino Genuine OIlguestcad844
 
Audi - presented by SWOT Team
Audi - presented by SWOT TeamAudi - presented by SWOT Team
Audi - presented by SWOT TeamKrystal Plomatos
 
Audi - Progress through Technology
Audi  -  Progress through TechnologyAudi  -  Progress through Technology
Audi - Progress through TechnologySuhani Shrivastava
 
BMWstories online platform and BMW i China launch
BMWstories online platform and BMW i China launchBMWstories online platform and BMW i China launch
BMWstories online platform and BMW i China launchFelix Gao
 
Mercedes - Benz - Product Launch Event Set
Mercedes - Benz - Product Launch Event SetMercedes - Benz - Product Launch Event Set
Mercedes - Benz - Product Launch Event SetGaurav Sharma
 

Viewers also liked (19)

Virtual field trip to jurong point
Virtual field trip to jurong pointVirtual field trip to jurong point
Virtual field trip to jurong point
 
5 Year Strategic Plan for Growth at Progresso Soup
5 Year Strategic Plan for Growth at Progresso Soup5 Year Strategic Plan for Growth at Progresso Soup
5 Year Strategic Plan for Growth at Progresso Soup
 
GE2015 Yuhua Manifesto
GE2015 Yuhua ManifestoGE2015 Yuhua Manifesto
GE2015 Yuhua Manifesto
 
Presentation ECIA: Materials for the Creative Industries
Presentation ECIA: Materials for the Creative IndustriesPresentation ECIA: Materials for the Creative Industries
Presentation ECIA: Materials for the Creative Industries
 
Maintaining Market Leadership through Customer Focus
Maintaining Market Leadership through Customer FocusMaintaining Market Leadership through Customer Focus
Maintaining Market Leadership through Customer Focus
 
Trend analysis.pptx
Trend analysis.pptxTrend analysis.pptx
Trend analysis.pptx
 
Management Tools and Trends 2011
Management Tools and Trends 2011Management Tools and Trends 2011
Management Tools and Trends 2011
 
Bmw Creativity & Innovation
Bmw Creativity & InnovationBmw Creativity & Innovation
Bmw Creativity & Innovation
 
Publishing Expo 2008 Presentation
Publishing Expo 2008 PresentationPublishing Expo 2008 Presentation
Publishing Expo 2008 Presentation
 
Audi ludhiana launch media coverage - ver 1.1
Audi ludhiana launch  media coverage - ver 1.1Audi ludhiana launch  media coverage - ver 1.1
Audi ludhiana launch media coverage - ver 1.1
 
Being Good Isn't Good Enough: Become a Market Leader
Being Good Isn't Good Enough:  Become a Market LeaderBeing Good Isn't Good Enough:  Become a Market Leader
Being Good Isn't Good Enough: Become a Market Leader
 
Volvo xc 90 Excellence - Launch Event
Volvo xc 90 Excellence - Launch EventVolvo xc 90 Excellence - Launch Event
Volvo xc 90 Excellence - Launch Event
 
Hino Truck & Bus - Parts Catalogue Q2 2015
Hino Truck & Bus - Parts Catalogue Q2 2015Hino Truck & Bus - Parts Catalogue Q2 2015
Hino Truck & Bus - Parts Catalogue Q2 2015
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Seminar Hino Genuine OIl
Seminar Hino Genuine OIlSeminar Hino Genuine OIl
Seminar Hino Genuine OIl
 
Audi - presented by SWOT Team
Audi - presented by SWOT TeamAudi - presented by SWOT Team
Audi - presented by SWOT Team
 
Audi - Progress through Technology
Audi  -  Progress through TechnologyAudi  -  Progress through Technology
Audi - Progress through Technology
 
BMWstories online platform and BMW i China launch
BMWstories online platform and BMW i China launchBMWstories online platform and BMW i China launch
BMWstories online platform and BMW i China launch
 
Mercedes - Benz - Product Launch Event Set
Mercedes - Benz - Product Launch Event SetMercedes - Benz - Product Launch Event Set
Mercedes - Benz - Product Launch Event Set
 

Similar to Yuhua 5-Year Master Plan (2016 - 2020)

West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open HouseCrosstown TO
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Crosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Crosstown TO
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Crosstown TO
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Crosstown TO
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Crosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCrosstown TO
 

Similar to Yuhua 5-Year Master Plan (2016 - 2020) (20)

West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
East Virtual Open House
East Virtual Open HouseEast Virtual Open House
East Virtual Open House
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - March 2018
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 

Recently uploaded

IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 

Recently uploaded (8)

IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 

Yuhua 5-Year Master Plan (2016 - 2020)

  • 1. Our Yuhua Our Home Jurong Town Council 5-Year Concept Master Plan 2016-2020 A Better Environment for All
  • 2. Dear Friends & Residents, Our Jubilee year is a good time to take stock of developments and plan for our future. In this small exhibition we show some of the things the Town Council has done, is doing, and will do in the future, to help build a better home for you in Yuhua A Better Environment
  • 3. Rejuvenating our Neighbourhood Lift Upgrading Programme (LUP) • LUP provides direct lift access to all the floors & Improves mobility • 98 % of the eligible flats in Yuhua have completed LUP • Upcoming LUP – Blk 214 Jurong East Street 21 (3 Benefiting Units) – Blk 346 Jurong East St 31 (3 Benefiting Units) – Blk 348 Jurong East St 31 (8 Benefiting Units)
  • 4. Rejuvenating our Neighbourhood Neighbourhood Renewal Programme (NRP) • The NRP was introduced in Aug 2007 focuses on block and precinct improvements. • 94 % of the eligible precincts (about 8,312 units) have completed Interim Upgrading Programme/NRP or currently undergoing NRP at various stages NRP at Blk 221 to 228, 221A, 223A and 225A Jurong East St 21
  • 5. Rejuvenating our Neighbourhood Neighbourhood Renewal Programme (NRP) Upcoming NRP - Blks 246 to 253 Jurong East St 24 - 3RD Qtr 2016- 1st Qtr 2018 BLK 252 BLK 255. BLK 258 BLK 256
  • 6. Rejuvenating our Neighbourhood Remaking Our Heartland(ROH) Launched in 2007, ROH aims to rejuvenate public housing estates to bring about a holistic transformation. Upgrading of Neighbourhood Centre 2 consisting of Blks 252 & 253 Jurong East St 24. Estimate Completion Date : 3Q 2017 Upgrading of Neighbourhood Centre 3 consisting of Blks 343 to 354 Jurong East St 31. Estimate Completion Date : 1H 2017
  • 7. Interim Estate Upgrading Programme (I-EUP) • I-EUP aimed to improve the amenities and offer improvement work at the older private housing estates. Under the I-EUP, we have build covered link way outside Ivory Heights Condominium & 2 rain shelters outside Westmere Condominium 2 Rain shelters outside Westmere Rejuvenating our Neighbourhood Covered Linkway from Bus-stop to Rear Gate of Ivory Heights
  • 8. Renewing Our Homes Home Improvement Programme (HIP) • HIP addresses common maintenance problems, like the repair of spalling concrete, replacement of waste pipes, upgrading of toilets/bathrooms, replacement entrance door and refuse chute hoppers etc. Highly subsidized by the government • 24 % of the eligible flats (2,013 units) are currently undergoing HIP at the various stages • HIP approved in FY 2015 – Blocks 241-251 Jurong East St 21 – Blocks 101-116 Jurong East St 13 Upgrading of Toilet/ bathrooms Replacement of waste/soil discharge stacks
  • 9. Renewing Our Homes Enhancement for Active Seniors (EASE) EASE has been offered to HDB flats in all towns since 2013. This will benefit the elderly who may wish to get the improvements earlier before the HIP, or whose blocks did not qualify for HIP.
  • 10. A Better Home for All Completed Improvement Projects • Since 2011, Jurong Town Council has spent $2.5m on various Town Improvement projects to improve the overall living environment • We have build – Covered linkways – Drop-off points – Sheltered ramps – Block signs & Noticeboards – New design letterboxes – Recreational and exercise facilities such as hard courts, jogging tracks, playgrounds, multi- generation fitness corners, games courts & Futsal court – Community gardens – Residents’ corners • Over the next 5 years , another $ 2.5 m to be spent to provide more improvement works COVERED LINKWAY FROM BLOCKS 217 TO 215 JURONG EAST STREET 21 COVERED LINKWAYS BLOCKS 328 JURONG EAST STREET 21
  • 11. A Better Home for All Completed Improvement Projects DROP-OFF POINT AT BLK 113 JURONG EAST ST 13 DROP-OFF POINTS AT BLKS 260, 261, 263 & 264 JURONG EAST ST 24 SHELTERED RAMP AT BLK 260 JURONG EAST STREET 21 SHELTERED RAMP AT BLK 218 JURONG EAST ST 21
  • 12. A Better Home for All Completed Improvement Projects LIGHTED BLOCK NUMBER SIGNS AT JURONG GATEWAY ROAD, JURONG EAST STREET 21 AND JURONG EAST STREET 24 FITNESS CORNER AT BLK 242 JURONG EAST ST 24 PLAYGROUND AT BLOCK 317 JURONG EAST STREET 31 UPGRADED JOGGING TRACK, PAVILION AND FOOTPATH NEAR BLOCK 255 JURONG EAST ST 24
  • 13. After A Better Home for All Upcoming Improvement Projects from 2016 Construction of 3G Playground at Block 209 Jurong East St 21 Before
  • 14. Before After A Better Home for All Upcoming Improvement Projects from 2016 High Covered Linkway cum drop-off point from - Block 322 to 322A & - Block 323 to 325 Jurong East St 31
  • 15. Before After A Better Home for All Upcoming Improvement Projects from 2016 Modification of Drop-off Points at Blocks 101 to 116 Jurong East St 13
  • 16. After A Better Home for All Upcoming Improvement Projects from 2016 Construction of 3G Playground at Block 264 Jurong East St 24 Before
  • 17. After A Better Home for All Upcoming Improvement Projects from 2016 Construction of 3G Playground at Block 327 Jurong East St 31 Before
  • 18. A Better Home for All Upcoming Improvement Projects from 2016 An innovative Sensory Park will be built at the existing Neighbourhood Park near Blks 257-263 Jurong East St 24. The sensory park will have a variety of texture which residents could see, feel, touch and smell so as to bring more fun to the residents’ outdoor activities.
  • 19. Taking care of what we have … • Since 2011, Jurong Town Council has spent $12.1m in: – Repairs and Redecorations (R&R) – Re-roofing work – Replacement of water pipes – Replacement of booster pumps – Replacement of refuse chute flushing system – Replacement of water tanks lining • Another $9.8m will be spent in the next 5 years • Upcoming R&R -Blks 254, 317 to 328, 318A, 322A, 342 to 353 -Blks 101 to 107, 209 to 214, 130 to 135 Repainting to Blocks 108 to 116 Jurong East St 13 Repainting to Blocks 215 - 231, 215A, 217A, 219A, 221A, 223A & 225A Repainting to Blocks 255 to 264 Jurong East St 24
  • 20. Replacement of roof membranes Replacement of Lining to Stainless Steel Water Tanks Replacement of Booster Pumps Taking care of what we have … Rescreeding of void deck & apron
  • 21. LED • We are the 1st Town Council to adopt this innovation for lighting up our common areas. The Town Council has saved about $1.13 m per year since the installation of LED lightings in HDB estates since 2010. Test bedding new ways to do work … Solar Leasing Project • HDB has installed solar panels at Blocks 246, 247, 248 and 251 Jurong East St 24 in 2011 as a test bed project to harness solar energy • The precinct was awarded the BCA Green Mark Gold Plus Award in 2011 • Going forward, another 41 blocks of HDB flats will be installed with solar panels by 1st Qtr 2016.
  • 22. Police cameras • To improve security for our residents, we have a tie-up project with the Police – the Polcam • 31 Blocks Installed • 80 Blocks for future installation by 2016 Test bedding new ways to do work …
  • 23. Community Parklet Dual deck bicycle deck Vertical greenery Solar Panels Pneumatic Waste Conveyance System LED light Rainwater Harvesting Green roof  Launched in 2012, 38 blocks of flats at Blocks 209-240 Jurong East St 21 will be transformed into an eco-friendly neighbourhood by end of 2015.  The project costs $23 m.  1st matured estate to embrace eco-friendly features such as the Pneumatic Waste Conveyance System, solar panels, outdoor LED street lightings, elevator energy regenerative system, water & electrical sub-meters, rain water harvesting system, green roof, vertical greenery, community garden, dual bicycle racks and community parklets. Test bedding new ways to do work …
  • 24.  Jurong Lake District will become a mini version of a "smart city"  Above-ground boxes connected to fiber-optic lines will be deployed across at street lights or bus stops.  These new boxes can be hooked up to sensors to detect air pollutants, heavy rainfall, traffic jams, Township management etc  Some 9,000 residents living in Jurong East (3,194 flats) will be the first to experience “Smart living”  Residents can also look forward to a more liveable, efficient, sustainable and safe environment. Test bedding new ways to do work … Solar powered surveillance cameras, traffic sensors and other instruments will gather data in Jurong testbed that all government agencies can share.
  • 25. Smart Home Smart Neighbourhood • Elderly Monitoring Systems • Home Energy Management • Home Water Management System • Smart Solar Energy Monitoring System • Smart Pneumatic Waste Conveyance System • Smart Electrical Sub-meters • Remote Water Meters • Smart Noticeboards Test bedding new ways to do work … Smart Home Smart Noticeboards
  • 26. Car Park Improvement Work • HDB has upgraded 85% the surface carparks in Yuhua • HDB has constructed additional car and motorcycle lots at Blk 101, 222/226, 246/248 & 263 • HDB will be building a temporary car park next to Block 254, a very popular market and food centre to meet the increased demand for parking lots Making it easier to move around … Electronic Parking System Implementation • As of August 2015, EPS has been implemented in 13 car park • 9 carparks in progress (4Q 2015-1 Q2016) Additional car and motorcycle lots at Blk 101 Electronic Parking System at Blk 234
  • 27. Road & Improvement • LTA has widened Jurong Town Hall Road and Jurong East St 11/21 & constructed new roads Jurong Gateway Road and Gateway Drive • Introducing cycling path as part of Jurong Lake ROH programme • Covered walkway within 400m radius from Chinese Garden MRT Station under the Walk-2-Ride scheme Making it easier to move around … Adding ramps and shelter to the existing pedestrian overhead bridge across Boon Lay Way near Yuhua CC Widened Jurong Town Hall Road • Adding ramps and shelter to the existing pedestrian overhead bridge across Boon Lay Way near Yuhua CC Adding ramps and shelter
  • 28. MRT Rail Improvement • Installation of noise barrier at the MRT viaduct along Boon Lay Way near to Blk 110 Jurong East St 13 and Jurong East Central • A new platform and track have been build at Jurong East MRT station to hasten the traffic boarding and alighting to and from the North South (NS) Line and East West(EW) Line trains • Another 57 trains to the NS and EW lines • Opening of Downtown Line Stage 2 in Dec 2015 • Jurong Region Line and Cross Island Line in future by 2025 Making it easier to move around … Noise barrier at the MRT viaduct along Boon Lay Way near to Blk 110 A new platform and track have been build at Jurong East MRT station
  • 29. New Public Housing • HDB will be building 2 residential blocks ( 225 dwelling units) at the open space infront of Blk 236 Jurong East St 21 • It is served with a 6-storey MSCP and well connected covered linkway, and facilities such as precinct pavilion, playgrounds and roof garden at MSCP • The project will start in 2Q 2015 and complete by 2Q 2019
  • 30. Bringing People Closer to Nature … A beautiful & natural Jurong Lake Gardens will be a reality in a few years. 1st Phase- Completion of Jurong Lake Gardens West (beside Taman Jurong) by 2017 2nd Phase- Jurong Lake Gardens East and Jurong Lake Gardens Central in 2020 Jurong Lake Gardens
  • 31. Jurong Lake District • In the next 10-15 years, the Jurong Lake District is poised to be the next destination for leisure and business • From public parks to water front hotels, the district brims with new and comprehensive developments • It will also be the terminus for the Singapore/Kuala Lumpur High-speed rail to facilitate seamless travel between Kuala Lumpur and Singapore, and bring the people of Malaysia and Singapore closer together
  • 32. New Development In Jurong Gateway • In 2008, the URA unveiled the blue print to transform Jurong into the biggest regional centre outside of the Central Business District • When fully completed, the District will have more than 500,000 sqm of office space and 250,000 sqm of retail space, 1,000 more homes and at least 2,800 hotel rooms. J-Cube & Canopy Big Box Devan Nair Institute for Employment and Employability Ng Teng Fong General Hospital and Jurong Community Hospital Genting Hotel JEM Westgate
  • 33. More Community Gardens will be built in our Town. From neighbours to friends … The Town Council will organise more such NRP exhibitions to allow residents to discuss with their neighbours & friends on the facilities that they desire under the programme More Sports & Recreational Facilities and communal space will be built to encourage community bonding Futsal court at Blk 209 Community parklet at Blk 229
  • 34. Our Social Service Centres 1. Yuhua Neighbourhood Link 2. Blue Cross Thong Kheng Home 3. Aspiration Wan Qing Lodge 4. Singapore Buddhist Free Clinic 5. St Luke’s Eldercare (Jurong East Centre) 6. Tzu Chi Free Health Screening Centre 7. All Saints Nursing Home – Jurong East 8. Loving Heart Multi-Service Centre Caring for those who need our help … All Saints Nursing Home – Jurong East New Year Hong Bao for the Elderlies Prosperity Rice Distribution Visit to Thong Kheng Home