Large scale wind power in cold climate

Winterwind
WinterwindWinterwind
Mikael Lindmark
CEO and PM




11-01-18
Blaiken Large-scale wind power in cold climate

  Photo montage
11-01-18
Agenda

BlaikenVind AB
General site information
General project information
Climate conditions
Risk assessment due to cold climate
    Operation and maintainance
    Cable damage
Questions




12-02-07
BlaikenVind AB

Two leading powers in the industry
join forces

Skellefteå kraft

Fortum
Leading development in the field of
renewable energy




12-02-07
General site information

The windfarm is situated in Northen
Sweden in the border between
Storuman and Sorsele municipalies




12-02-07
Site information

High-ground area
           -    Sub-mountainous area
                (lågfjällsområde)
           -    Wind Power Area (WPA)
                640 – 747 meter above sea
                level




12-02-07
Site information

Terrain
           -    Very flat area
           -    No significant variations or
                gradients in the terrain
           -    Low vegetation in the Wind
                power area




12-02-07
Why Blaiken?

Good wind conditions

Average wind speed: 8 m/s

Best wind conditions during
autumn and vinter




                              Estimated production




12-02-07
Why Blaiken?

Existing national grid 400kV
(Juktan hydro-power plant)
Existing infrastructure
Mining activites previously in the
area




12-02-07
Environment
The area is classified as an national
interest for:
•  Windpower produktion
•  Raindeer management
•  Environmental protection

Environmental-permission

Monitoring programme

Annual report to the County
Administrative Board (Länsstyrelsen)




12-02-07
Environment
No turbines in the wet lands
(classification 1 and 2)
           -    Minimize the passages of roads
                through wet lands and streams
           -    Minimum 100 m from bigger
                lakes

Consultations with the Sami
community

           -    minimize the effects of the
                raindeer management




12-02-07
Project information

Project duration: 2010-2015

90 Wind Turbines (WTGs)

3 Batches

30 WTGs per Batch
700 GWh/year equivalent to
150 000 apartments




12-02-07
Graphical extent of the wind farm




12-02-07
Project information
Nordex N100 IECII – 2,5 MW
           -    Mast height 100 m
           -    Rotor diameter 100 m
           -    Total hight 150 m




12-02-07
Project information

Servicebuilding: 500 m2
           –  Staff room
           –  Workshop equipment
           –  Garage for service vehicles
           –  Storage area for spare parts




12-02-07
Project information

Switchgear:
           –  Indoor 36 kV
           –  Outdoor 400 kV




12-02-07
Project information

Two main transformers 36kV/400kV
     (both will be installed before
     commissioning of the Wind Turbines
     to minimize risks)
Internal 36 kV cable network: 150 000 m
Redundant fiberoptic net




12-02-07
Project information

Rock ancored foundations
Gravitation foundations
Internal roads: 60 km




12-02-07
Climate conditions
Temperatures 20070830 – 20100228

           -    Lowest temp -27, 63 ºC
           -    Highest temp. + 25, 51 ºC
           -    300 h below -20 ºC
           -    42 h -25 ºC


Icing
           -    Icing expected for a period of
                about 5 months
           -    The area can be affected by
                heavy icing in short periods




12-02-07
Windpower
in cold climate

Climate-adapted engineering
           -  Heated systems (ex. gearbox)
Anti-icing system
Operation and maintenance - risks




12-02-07
Risks and problems
during operation and
maintenance in cold climate
Safe access
           -    Ice throw
           -    Falling snow and ice
           -    Cold climate

Accessibility – choice of service vehicle
Road maintenance – snow clearance
Communication – mobile coverage
Repairs to cable damage




12-02-07
Ice throw
Risks for third party in
the area:
•    Hunters
•    Snowmobile riders
•    Berry pickers
•    Raindeer herders


The hazard area for ice
throw will be signposted


Excisting snowmobile trails will be
moved outside the risk area

     12-02-07
Ice throw
Health and safety procedures for personnel
and visitors
           –  Health and safety information for all
           –  Risk assessment prior to access in
              winter
           –  Operation centre informed on arrival
              and when leaving the wind farm
           –  Wind turbine shut down before entering
              the hazard area (300 m)
           –  Visitors only if authorised by wind farm
              manager
           –  However, wheeled or tracked vehicles
              with roof can drive through the wind
              farm without any need to shut down the
              wind farm
           –  Hard hat




12-02-07
Falling snow or ice

Risk of falling snow and ice on access
           –  Personal injury
           –  Risk of blocked exit

Health and safety procedures
           –  Risk assessment prior to access
           –  Operation centre informed
           –  Wind turbine shut down before and
              during access
           –  Hard hat
           –  Mobile phone or two-way radio




12-02-07
Snow clearance
Procurement of maintenance
contractor is ongoing
Choice of snow clearance method
           –  Wheel loaders on site
           –  Snow-thrower
           –  Apex plow (spetsplog)
           –  Excavator
Snow poles-reinforced and
extended
Risk of cable damage
No snow clearance in the switch
gear area



12-02-07
Communications

Mobile coverage for staff safety
(local reinforcement of the signals)


Alternative communications
system




12-02-07
Consequences of
cable damage in winter
Expensive repairs and reduced
income due to downtimes (driftavbrott)
           –  Locate the damage

           –  Snow clearance

           –  Ice-melting and excavation
           –  Putting up assembly tent

           –  Splicing and testing

           –  Reinstatement with frost free
              backfill materials

Risk of damage to adjacent cables




12-02-07
Risk for cable damage

Handling cable drums
           –  Risk of sheathing damage
Cable laying
           –  Excavation of cable trench
                •  rock or boulders in the
                   trench
           –  Material requirements
                •  Trench bed
                •  Fill material

Risk also of frost damage if the work
is incorrectly performed




12-02-07
Reduce the risk
of cable damage
BlaikenVind requirements:

           –  Training to Swedish BB3 level
              for cable layer staff and
              excavator drivers

Contractors carry out own inspections
BVAB engages inspectors and works
managers




12-02-07
Measuring equipment


Low temperatures and icy conditions
affect the measuring equipment




                                      Bowl-pox anemometer out of order




12-02-07
Visit us on site or at www.blaikenvind.se




12-02-07
Webcam at www.blaikenvind.se




12-02-07
Any questions?




12-02-07
Thank you!




12-02-07
1 of 34

Recommended

Expert group study on recommended practices for wind energy projects in cold ... by
Expert group study on recommended practices for wind energy projects in cold ...Expert group study on recommended practices for wind energy projects in cold ...
Expert group study on recommended practices for wind energy projects in cold ...Winterwind
756 views8 slides
Simulation of icing events over Gaspé region by
Simulation of icing events over Gaspé regionSimulation of icing events over Gaspé region
Simulation of icing events over Gaspé regionWinterwind
424 views22 slides
GC Energy & Environmental Newsletter May 2012 by
GC Energy & Environmental Newsletter   May 2012GC Energy & Environmental Newsletter   May 2012
GC Energy & Environmental Newsletter May 2012generalcarbon
214 views7 slides
Solar Energy Industry Forecast DOE 2008 by
Solar Energy Industry Forecast DOE 2008Solar Energy Industry Forecast DOE 2008
Solar Energy Industry Forecast DOE 2008Dmitry Tseitlin
881 views38 slides
GC Energy & Environmental Newsletter May 2012 by
GC Energy & Environmental Newsletter   May 2012GC Energy & Environmental Newsletter   May 2012
GC Energy & Environmental Newsletter May 2012generalcarbon
225 views7 slides
Final usea workshop (2) by
Final usea workshop (2)Final usea workshop (2)
Final usea workshop (2)Alliance To Save Energy
416 views35 slides

More Related Content

Similar to Large scale wind power in cold climate

Benefit and expected gains with use of de-icing technologies by
Benefit and expected gains with use of de-icing technologiesBenefit and expected gains with use of de-icing technologies
Benefit and expected gains with use of de-icing technologiesWinterwind
416 views27 slides
Icing of wind power: A survey of research efforts and needs by
Icing of wind power: A survey of research efforts and needsIcing of wind power: A survey of research efforts and needs
Icing of wind power: A survey of research efforts and needsWinterwind
820 views27 slides
GM-casestudy-uninett by
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninettScott Miller
97 views2 slides
Up coming Opportunities in Offshore, Paul Savvides, SIEMENS by
Up coming Opportunities in Offshore, Paul Savvides, SIEMENSUp coming Opportunities in Offshore, Paul Savvides, SIEMENS
Up coming Opportunities in Offshore, Paul Savvides, SIEMENSInvest Northern Ireland
850 views10 slides
EMVT 12 september - Han van Asten - TenneT by
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTDutch Power
1.4K views32 slides
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri... by
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...Winterwind
287 views15 slides

Similar to Large scale wind power in cold climate(9)

Benefit and expected gains with use of de-icing technologies by Winterwind
Benefit and expected gains with use of de-icing technologiesBenefit and expected gains with use of de-icing technologies
Benefit and expected gains with use of de-icing technologies
Winterwind416 views
Icing of wind power: A survey of research efforts and needs by Winterwind
Icing of wind power: A survey of research efforts and needsIcing of wind power: A survey of research efforts and needs
Icing of wind power: A survey of research efforts and needs
Winterwind820 views
EMVT 12 september - Han van Asten - TenneT by Dutch Power
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneT
Dutch Power1.4K views
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri... by Winterwind
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...
Evaluation and experiences from the Vindpilot project at Dragaliden and Gabri...
Winterwind287 views

More from Winterwind

Ice profile classification - Matthew Wadham-Gagnon by
Ice profile classification - Matthew Wadham-GagnonIce profile classification - Matthew Wadham-Gagnon
Ice profile classification - Matthew Wadham-GagnonWinterwind
1.9K views48 slides
Kvt mapping of_icing by
Kvt mapping of_icingKvt mapping of_icing
Kvt mapping of_icingWinterwind
895 views18 slides
Bergström hans by
Bergström hansBergström hans
Bergström hansWinterwind
786 views23 slides
Bergström fredrik by
Bergström fredrikBergström fredrik
Bergström fredrikWinterwind
855 views14 slides
Byrkjedal øyvind by
Byrkjedal øyvindByrkjedal øyvind
Byrkjedal øyvindWinterwind
816 views20 slides
Campbell iain by
Campbell iainCampbell iain
Campbell iainWinterwind
860 views40 slides

More from Winterwind(20)

Ice profile classification - Matthew Wadham-Gagnon by Winterwind
Ice profile classification - Matthew Wadham-GagnonIce profile classification - Matthew Wadham-Gagnon
Ice profile classification - Matthew Wadham-Gagnon
Winterwind1.9K views
Kvt mapping of_icing by Winterwind
Kvt mapping of_icingKvt mapping of_icing
Kvt mapping of_icing
Winterwind895 views
Bergström hans by Winterwind
Bergström hansBergström hans
Bergström hans
Winterwind786 views
Bergström fredrik by Winterwind
Bergström fredrikBergström fredrik
Bergström fredrik
Winterwind855 views
Byrkjedal øyvind by Winterwind
Byrkjedal øyvindByrkjedal øyvind
Byrkjedal øyvind
Winterwind816 views
Campbell iain by Winterwind
Campbell iainCampbell iain
Campbell iain
Winterwind860 views
Delle monache luca by Winterwind
Delle monache lucaDelle monache luca
Delle monache luca
Winterwind841 views
Derrick alan by Winterwind
Derrick alanDerrick alan
Derrick alan
Winterwind894 views
Hietanen jarmo by Winterwind
Hietanen jarmoHietanen jarmo
Hietanen jarmo
Winterwind799 views
Hudecz adriana by Winterwind
Hudecz adrianaHudecz adriana
Hudecz adriana
Winterwind616 views
Huttunen saara by Winterwind
Huttunen saaraHuttunen saara
Huttunen saara
Winterwind667 views
Jeffs justin by Winterwind
Jeffs justinJeffs justin
Jeffs justin
Winterwind607 views
Jordaens pieter jan by Winterwind
Jordaens pieter janJordaens pieter jan
Jordaens pieter jan
Winterwind693 views
Karlsson timo by Winterwind
Karlsson timoKarlsson timo
Karlsson timo
Winterwind532 views
Lehtomäki ville by Winterwind
Lehtomäki villeLehtomäki ville
Lehtomäki ville
Winterwind712 views
Meyer sebastian by Winterwind
Meyer sebastianMeyer sebastian
Meyer sebastian
Winterwind830 views
Olsson esbjörn by Winterwind
Olsson esbjörnOlsson esbjörn
Olsson esbjörn
Winterwind716 views
Ribeiro carla by Winterwind
Ribeiro carlaRibeiro carla
Ribeiro carla
Winterwind754 views

Recently uploaded

MechMaf Shipping LLC by
MechMaf Shipping LLCMechMaf Shipping LLC
MechMaf Shipping LLCMechMaf Shipping LLC
46 views288 slides
Accel_Series_2023Autumn_En.pptx by
Accel_Series_2023Autumn_En.pptxAccel_Series_2023Autumn_En.pptx
Accel_Series_2023Autumn_En.pptxNTTDATA INTRAMART
117 views75 slides
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck by
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deckPitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deckHajeJanKamps
417 views18 slides
Businesses to Start in 2024.pdf by
Businesses to Start in 2024.pdfBusinesses to Start in 2024.pdf
Businesses to Start in 2024.pdfDante St James
19 views43 slides
sample.potx by
sample.potxsample.potx
sample.potxMaryna Yurchenko
14 views3 slides

Recently uploaded(20)

Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck by HajeJanKamps
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deckPitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
HajeJanKamps417 views
Businesses to Start in 2024.pdf by Dante St James
Businesses to Start in 2024.pdfBusinesses to Start in 2024.pdf
Businesses to Start in 2024.pdf
Dante St James19 views
Nevigating Sucess.pdf by TEWMAGAZINE
Nevigating Sucess.pdfNevigating Sucess.pdf
Nevigating Sucess.pdf
TEWMAGAZINE23 views
Group and Teams: Increasing Cooperation and Reducing Conflict by Seta Wicaksana
Group and Teams: Increasing Cooperation and Reducing Conflict Group and Teams: Increasing Cooperation and Reducing Conflict
Group and Teams: Increasing Cooperation and Reducing Conflict
Seta Wicaksana20 views
NYKAA PPT .pptx by 125071081
NYKAA PPT .pptxNYKAA PPT .pptx
NYKAA PPT .pptx
12507108113 views
Top 10 Web Development Companies in California by TopCSSGallery
Top 10 Web Development Companies in CaliforniaTop 10 Web Development Companies in California
Top 10 Web Development Companies in California
TopCSSGallery44 views
Why are KPIs(key performance indicators) important? by Epixel MLM Software
Why are KPIs(key performance indicators) important? Why are KPIs(key performance indicators) important?
Why are KPIs(key performance indicators) important?
CORPORATE COMMUNICATION.pdf by AKarthikeyan8
CORPORATE COMMUNICATION.pdfCORPORATE COMMUNICATION.pdf
CORPORATE COMMUNICATION.pdf
AKarthikeyan812 views
Presentation on proposed acquisition of leading European asset manager Aermon... by KeppelCorporation
Presentation on proposed acquisition of leading European asset manager Aermon...Presentation on proposed acquisition of leading European asset manager Aermon...
Presentation on proposed acquisition of leading European asset manager Aermon...
KeppelCorporation171 views

Large scale wind power in cold climate

  • 2. Blaiken Large-scale wind power in cold climate Photo montage 11-01-18
  • 3. Agenda BlaikenVind AB General site information General project information Climate conditions Risk assessment due to cold climate Operation and maintainance Cable damage Questions 12-02-07
  • 4. BlaikenVind AB Two leading powers in the industry join forces Skellefteå kraft Fortum Leading development in the field of renewable energy 12-02-07
  • 5. General site information The windfarm is situated in Northen Sweden in the border between Storuman and Sorsele municipalies 12-02-07
  • 6. Site information High-ground area -  Sub-mountainous area (lågfjällsområde) -  Wind Power Area (WPA) 640 – 747 meter above sea level 12-02-07
  • 7. Site information Terrain -  Very flat area -  No significant variations or gradients in the terrain -  Low vegetation in the Wind power area 12-02-07
  • 8. Why Blaiken? Good wind conditions Average wind speed: 8 m/s Best wind conditions during autumn and vinter Estimated production 12-02-07
  • 9. Why Blaiken? Existing national grid 400kV (Juktan hydro-power plant) Existing infrastructure Mining activites previously in the area 12-02-07
  • 10. Environment The area is classified as an national interest for: •  Windpower produktion •  Raindeer management •  Environmental protection Environmental-permission Monitoring programme Annual report to the County Administrative Board (Länsstyrelsen) 12-02-07
  • 11. Environment No turbines in the wet lands (classification 1 and 2) -  Minimize the passages of roads through wet lands and streams -  Minimum 100 m from bigger lakes Consultations with the Sami community -  minimize the effects of the raindeer management 12-02-07
  • 12. Project information Project duration: 2010-2015 90 Wind Turbines (WTGs) 3 Batches 30 WTGs per Batch 700 GWh/year equivalent to 150 000 apartments 12-02-07
  • 13. Graphical extent of the wind farm 12-02-07
  • 14. Project information Nordex N100 IECII – 2,5 MW -  Mast height 100 m -  Rotor diameter 100 m -  Total hight 150 m 12-02-07
  • 15. Project information Servicebuilding: 500 m2 –  Staff room –  Workshop equipment –  Garage for service vehicles –  Storage area for spare parts 12-02-07
  • 16. Project information Switchgear: –  Indoor 36 kV –  Outdoor 400 kV 12-02-07
  • 17. Project information Two main transformers 36kV/400kV (both will be installed before commissioning of the Wind Turbines to minimize risks) Internal 36 kV cable network: 150 000 m Redundant fiberoptic net 12-02-07
  • 18. Project information Rock ancored foundations Gravitation foundations Internal roads: 60 km 12-02-07
  • 19. Climate conditions Temperatures 20070830 – 20100228 -  Lowest temp -27, 63 ºC -  Highest temp. + 25, 51 ºC -  300 h below -20 ºC -  42 h -25 ºC Icing -  Icing expected for a period of about 5 months -  The area can be affected by heavy icing in short periods 12-02-07
  • 20. Windpower in cold climate Climate-adapted engineering -  Heated systems (ex. gearbox) Anti-icing system Operation and maintenance - risks 12-02-07
  • 21. Risks and problems during operation and maintenance in cold climate Safe access -  Ice throw -  Falling snow and ice -  Cold climate Accessibility – choice of service vehicle Road maintenance – snow clearance Communication – mobile coverage Repairs to cable damage 12-02-07
  • 22. Ice throw Risks for third party in the area: •  Hunters •  Snowmobile riders •  Berry pickers •  Raindeer herders The hazard area for ice throw will be signposted Excisting snowmobile trails will be moved outside the risk area 12-02-07
  • 23. Ice throw Health and safety procedures for personnel and visitors –  Health and safety information for all –  Risk assessment prior to access in winter –  Operation centre informed on arrival and when leaving the wind farm –  Wind turbine shut down before entering the hazard area (300 m) –  Visitors only if authorised by wind farm manager –  However, wheeled or tracked vehicles with roof can drive through the wind farm without any need to shut down the wind farm –  Hard hat 12-02-07
  • 24. Falling snow or ice Risk of falling snow and ice on access –  Personal injury –  Risk of blocked exit Health and safety procedures –  Risk assessment prior to access –  Operation centre informed –  Wind turbine shut down before and during access –  Hard hat –  Mobile phone or two-way radio 12-02-07
  • 25. Snow clearance Procurement of maintenance contractor is ongoing Choice of snow clearance method –  Wheel loaders on site –  Snow-thrower –  Apex plow (spetsplog) –  Excavator Snow poles-reinforced and extended Risk of cable damage No snow clearance in the switch gear area 12-02-07
  • 26. Communications Mobile coverage for staff safety (local reinforcement of the signals) Alternative communications system 12-02-07
  • 27. Consequences of cable damage in winter Expensive repairs and reduced income due to downtimes (driftavbrott) –  Locate the damage –  Snow clearance –  Ice-melting and excavation –  Putting up assembly tent –  Splicing and testing –  Reinstatement with frost free backfill materials Risk of damage to adjacent cables 12-02-07
  • 28. Risk for cable damage Handling cable drums –  Risk of sheathing damage Cable laying –  Excavation of cable trench •  rock or boulders in the trench –  Material requirements •  Trench bed •  Fill material Risk also of frost damage if the work is incorrectly performed 12-02-07
  • 29. Reduce the risk of cable damage BlaikenVind requirements: –  Training to Swedish BB3 level for cable layer staff and excavator drivers Contractors carry out own inspections BVAB engages inspectors and works managers 12-02-07
  • 30. Measuring equipment Low temperatures and icy conditions affect the measuring equipment Bowl-pox anemometer out of order 12-02-07
  • 31. Visit us on site or at www.blaikenvind.se 12-02-07