  1. 1. Western Areas NLCorporate Presentation Corporate PresentationAugust & September 2012 g p “Think Nickel, think margins, think Western Areas” 1
  2. 2. Disclaimer and Forward Looking StatementsThis presentation is being furnished to you solely for your information and for your use and may not be copied, reproduced or redistributed to any other person in any manner. You agree to keep the contents of this presentation and these materials confidential. The information contained in this presentation does not constitute or form any part of any offer or invitation to purchase any securities and neither the issue of the information nor anything contained herein shall form the basis of, or be relied upon in connection with, any contract or commitment on the part of any person to proceed with any transaction. y p yp p yYou must not take or transmit this presentation or a copy of this presentation into the United States or Japan or distribute it, directly or indirectly, in the United States or Japan or to any US persons. By your acceptance of this document, you acknowledge that you are a not a “U.S. person” for the purposes of the US Securities Act.  Neither this document, in whole or in part, nor any copy thereof may be taken or transmitted to any other person.  The distribution of this document to other persons or in other jurisdictions may be restricted by law, and persons into whose possession this document comes should inform themselves about, and observe, any such restrictions.  Any failure to comply with these restrictions may constitute a violation of the federal securities laws of the United States and the laws of other jurisdictions. The distribution of this presentation in other jurisdictions may be restricted by law, and persons into whose possession this presentation comes should inform themselves about, and observe, any such restrictions.The information contained in this presentation has been prepared by Western Areas NL.  No representation or warranty, express or implied, is or will be made in or in relation to, and no responsibility or liability is or will be accepted by Western Areas NL, employees or representatives as to the accuracy or completeness of this information or any other written or oral information made available to any interested party or its advisers and any liability therefore is hereby expressly disclaimed. No party has any obligation to notify opinion changes or if it becomes aware of any inaccuracy in or omission from this presentation. All opinions and projections expressed in this presentation are given as of this date and are subject to change without notice. d bj t t h ith t tiThis document contains forward‐looking statements.  These statements are subject to certain risks and uncertainties that could cause the performance or achievements of Western Areas NL to differ materially from the information set forth herein, although such information reflects forecasts and projections prepared in good faith based upon methods and data that are believed to be reasonable and accurate as at the dates thereof and although all reasonable care has been taken to ensure that the facts stated herein are accurate and that the forward‐looking statements, opinions and expectations contained herein are based on fair and reasonable assumptions.  Western Areas NL undertakes no obligation to revise these forward looking statements to reflect subsequent events or circumstances.  Individuals should not place undue reliance on forward looking no obligation to revise these forward‐looking statements to reflect subsequent events or circumstances Individuals should not place undue reliance on forward‐lookingstatements and are advised to make their own independent analysis and determination with respect to the forecasted periods, which reflect Western Areas NL’s view only as of the date hereof.The information within this PowerPoint presentation was compiled by Mr. David Southam, but the information as it relates to mineral resources and reserves was prepared by Mr. Dan Lougher and Mr. John Haywood. Mr. Southam, Mr. Lougher and Mr. Haywood are full time employees of Western Areas. Mr. Lougher and Mr. Haywood are members of AusIMM and have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to  p y yp p y y gqualify as Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.  Mr. Southam, Mr. Lougher  and Mr. Haywood consent to the inclusion in this presentation of the matters based on the information in the form and context in which it appears.For Purposes of Clause 3.4 (e) in Canadian instrument 43‐101, the Company warrants that Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. THIS PRESENTATION IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE U.S. 2
  3. 3. Agenda “Western Areas has an enviable track record of  exploring, finding, developing and producing  highly profitable mines..” Introduction O Operations i Financial Summary E l Exploration & Growth Outlook i &G hO l k Nickel Industry Explore p Develop Sales Produce 3
  4. 4. Introduction – Corporate SummaryListings: Member of S&P ASX 200 Top 15 Shareholders % 1 T Streeter 14.36 2 Colonial Group 8.58Shares on Issue:Shares on Issue: 179.7M 179 7M 3 M & A Greenwell M & A Greenwell 5.45 5 45 4 Northwards Capital 3.19 5 Giovanni Santalucia 3.18Options: 2.0M 6 Sydney Fund Manager 3.02(varying strike prices >$7.00) 7 UBS Asset Management 2.82 8 Celeste Funds Management g 2.56Share Price: ~ A$4.20  (August2012) 9 State Street Corporation 10 Paradice Asset Management 2.44 2.39 11 Antares Asset Management 2.33Market Cap: A$750 million 12 Concise Asset Management 1.92(undiluted) 13 Independent Asset Management 1.80 14 Vanguard 1.74 15 Mount Kellet 1.70Cash: A$165M at 30 June 2012 TOTAL 57.48WSA 25 Month Share Price$8.00$6.00$4.00$4 00$2.00$0.00 Jul‐10 J l 10 Oct‐10 O 10 Jan‐11 J 11 Apr‐11 A 11 Jul‐11 J l 11 Oct‐11 O 11 Jan‐12 J 12 Apr‐12 A 12 Jul‐12 J l 12 Closing Share Price 4
  5. 5. Board of Directors Proven Depth & Experience Terry Streeter and Julian Hanna  Terry Streeter and Julian Hanna founders of Western Areas Extensive experience in nickel  exploration, mining and  p , g processing Global expertise in project  sourcing, exploration and mine  development Strong banking, financial, M&A  and corporate governance  backgrounds Involvement with other  Left to right: David Southam (Exec Director – Corporate), Dan Lougher (Managing Director), successful nickel companies  Rick Yeates (Non‐Exec Director), Terry Streeter (Non‐Exec Chairman), Ian Macliver (Non‐Exec Director) Julian (Jubilee Mines) (Jubilee Mines) Hanna (Non‐Exec Director), Robin Dunbar (Non‐Exec Director) & Joseph Belladonna (Company Secretary) (Non Exec (Non Exec Solid understanding of Chinese  markets, project financing and  offtakes 5
  6. 6. Powering through the CycleWestern Areas is: Australia’s  lowest cash cost nickel producer A proven explorer, developer and operator led by an experienced management team An S&P ASX 200 index member An S&P ASX 200 index member  Market cap ~ $740 million at current prices Profitable, even at  the current low A$ nickel price A A proven dividend payer, with a strong balance sheet di id d ith t b l h t Australia’s third largest producer of nickel at 31,000 tonnes of nickel mined and 25,000 tonnes of  nickel in concentrate produced  No 1 = BHP‐B Nickel West and  No 2 = Glencore Employer of approx 500 staff, either directly or through contractors Into its sixth consecutive year of production, eight  consecutive quarter with no downside surprises  First production 26 October 2006 Committed to stable organic growth from the current solid platform 6
  7. 7. Strong Asset Base  Production  Exploration  Assets & Growth Flying Fox • 1st nickel mine Forrestania &  • 15,000 Ni tonnes  WA Regional per annum per annum Spotted Quoll • 2nd nickel mine Canadian Assets • 10,000 Ni tonnes  per annum Cosmic Boy • Nickel concentrator  Finland – treats ore from  both mines 7
  8. 8. Operations 8
  9. 9. Location  WSA concentrate to  BHP Billiton WSA operations WSA  concentrate  exports 9
  10. 10. Flying Fox MineSummary  Continuous high grade Nickel to 1300m.  Open at  depth   depth Resource ore grades increase at depth from 3.9% to  5.8% Nickel Announced intersection T7: 34.7m @ 8.9% Nickel Announced intersection T7: 34.7m @ 8.9% NickelProduction FY2012 – 373,726t @ 5.0% nickel for 18.5kt nickel Low cash cost operation <US$3/lb Low cash cost operation <US$3/lbPurchase of Kagara Nickel Assets Combined Total High Grade Resource now stands at  around  115,000t of Nickel around 115,000t of Nickel Major drilling program commenced at Lounge Lizard  for next 6 months T5/ T6 & T7 down dip extensions cross into Lounge  Lizard and remain open at depth Flying Fox now approaching a 10 year mine life Purchase includes 300sqkm of tenements adjacent  to Forrestania operations t F t i ti 10
  11. 11. Spotted Quoll MineSummary Ore reserve was upgraded in June 2012 by 94%  with an exceptional 88% conversion ratio:  3.095mt @ 4.20% containing 131,360t nickel R Remains open at depth i t d th Drilling is ongoing which will result in further conversion of inferred resource to indicated to reserve Already well over a 10 year mine lifeProduction Stage 1 underground first ore delivered ahead of  schedule – (Nov 2011) Ramp up to 10,000tpa nickel in FY13 Mine optimisation study well advanced for potential increase in production up to 15,000tpa nickel 11
  12. 12. Forestannia Nickel ConcentratorConcentrator Summary Current capacity of 550,000tpa of ore f f Nickel concentrate output >25,000tpa Ni Concentrate grades of around 14.0% Ni   Premium blending  product (Fe/Mg ratio >15) 14,000t of concentrate storage capacityExport Infrastructure and Logistics  Access to >1400 sealed shipping containers No Environmental issues Using 25 trucks for concentrate transportation Shipping contract in place, FOB Esperance PortConcentrator Expansion Preliminary high grade expansion study  (750ktpa) completed Expansion configured for upgrade to 1mtpa of ore Expansion configured for upgrade to 1mtpa of ore Some items of infrastructure (crusher) already capable of 1mtpa 12
  13. 13. Concentrate Supply and Offtake ContractsConcentrate Supply  1000 Global Smelter Demand vs Global Concentrate Supply 950 Tightness in smelter supply to be experienced from 2013 900 850 Global nickel sulphide grades in decline Nickel in Conc/ Kt 800 Reliable nickel sulphide concentrate supply dwindling  750 700 Laterites and Nickel Pig Iron do not fill the void 650 600 550Offtake Contracts 500 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Long term offtake to BHP – 12ktpa nickel in conc Nickel in Concentrate Supply Smelter Demand New Jinchuan contract signed: o 12 month contract extension o Improved commercial terms o Significant uncommitted offtake beyond 2013 Tender process to commence Sept/Oct 2012  WSA in a unique position being an independent producer Ability to complete spot/ opportunistic sales  NOTE: The graph FORRESTANIA – OFFTAKE CONTRACTS  is based on Western Areas’ 10 Year  Production Targets.  These Targets include estimates and assumptions on production rates of  existing ore reserves, conversion of existing mineral resources to ore resources and assumptions  on potential extensions to existing mineral resources, based on current information.  These  Production Targets may vary due to future drilling results, nickel prices, costs and market  conditions.  Refer to Disclaimer and Forward Looking Statement in Presentation 13
  14. 14. Financials Lounge Lizard 10m wide face of 7% Massive Nickel Sulphide 14
  15. 15. Report Card FY2012 Delivering on ObjectivesObjectives Whats Been DeliveredPay Dividends  5c interim and 6c final dividendCashflow from Operations  A$159m cashflow, debt reduction and dividendsProfitable through the cycle  Weak nickel price, EBITDA A$185m, NPAT $40mCash costs below A$2.50/lb  A$2.43/lbIncrease resources at Spotted Quoll  130kt nickel reserveIncrease resources at Flying Fox  Purchased KZL nickel assets ‐ Lounge Lizard +40kt NiNew discovery at Forrestania  Sunrise ‐ early encouragementMill expansionMill expansion  Study complete awaiting board decision Study complete ‐ awaiting board decisionTidy up backyard  Outokumpu royalty retired 15
  16. 16. Financial Highlights Full Year Highlights ($ 000) Full Year Highlights ($000) FY 2011 FY 2011 FY 2012 FY 2012 Mine Production (tonnes Ni) 32,222 31,102 Mill Production (tonnes Ni) 25,663 25,641 Recovery 91% 92% Sales Volume (tonnes Ni) 27,498 26,637 Cash Costs (US$/lb) 2.11 2.50 Cash Costs (A$/lb) h ( $/lb) 2.12 2.43 Exchange Rate USD/ AUD 0.99 1.03 Nickel Price (U$/tn)            25,089            17,791 EBITDA (000) 312,018 186,583 EBIT (000) 231,991 94,902 NPAT (000) 134,973 40,181 Cashflow from Operations (000) 276,235 159,253 Net Cashflow (000)        143,580  (43,446) Cash at Bank 208,948 165,502 Dividend (cents) 25.0 11.0 16
  17. 17. Income Statement WSA NPAT ‐ Actual FY2011 vs Actual FY2012 WSA NPAT ‐ Actual FY2011 vs Actual FY2012 250 $10.0 ‐$1.3 ‐$11.7 200 $13.1 ‐$16.5 $43.0 $ ‐$131.4 150 $135.0 100 ns Million 50 $40.2 0 Tax alties mort FY11 ther  ther) FY12 (Vol) Revenue (Price) Depn & Am Actual F Actual F Ot Revenue ( Roya Revenue (Ot ‐50 ‐100 ‐150 150FY12 NPAT would have matched FY11 if not for the nickel price. 17
  18. 18. Exploration and Growth Outlook 18
  19. 19. Short Term – Near Mine Exploration Exploration Budget of A$20M for FY13, majority to be spent on drilling at Forrestania 120km strike length (900 sq km) of prospective Forrestania Nickel Project, within 500km long  nickel province i k l i Drilling Priority within 8km long zone (below).  New discovery would access existing mine  infrastructure Recent Sunrise discovery (see next slide) 19
  20. 20. New discovery‐Sunrise WSA’s latest new high grade discovery, 2km from Spotted Quoll and 300m SE of New Morning Best intersection 4.6m @ 3.7% nickel Major drilling program underway and results to be announced over next 6 months 20
  21. 21. Canada – Mustang Minerals  WSA owns 19.9% of Mustang Minerals ‐ a Canadian listed nickel and PGM company  WSA has two of 5 board seats, plus provides technical assistance  Makwa Nickel/PGE mine in Manitoba – feasibility in progress targeting 5ktpa Ni in concentrate Mak a Nickel/PGE mine in Manitoba feasibilit in progress targeting 5ktpa Ni in concentrate  Mayville Copper/Nickel deposit in Manitoba – drilling in progress for open pit resource  Potentially significant Palladium & Platinum discovery adjacent to Mayville WSA is earning a 65% interest with Mustang at East Bull Lake is earning a 65% interest with Mustang at East Bull Lake  80km west of Sudbury  Highly anomalous Nickel/Copper and Platinum/Palladium in Gabbro intrusion  Drill program commenced in 2012 East Bull Lake VTEM targeting Mayville drill core:  74.7m @ 0.75% Cu & 0.24% Ni 21
  22. 22. Finland – FinnAust Mining PLC Projects 81% WSA, planning to list on AIM ‐ dependent on  market conditions 300km long base metal province in Finland Numerous nickel/copper/zinc mines & occurrences 12 12 major project areas, many drilling targets j j d illi Geophysics proving very effective in defining targets  ZTEM survey completed ZTEM survey completed Significant results from historic and FinnAust drilling Major ramp up of drilling has commenced at Tormala &  j p p g Hammaslahti 22
  23. 23. Growth Outlook Short Term             Medium Term        Long Term              < 12 Months < 12 Months 2‐5 years 2‐5 years >5 years >5 years Flying Fox > 10 years – drilling in  Spotted Quoll & Flying Fox  Base Case production 40‐ progress – 30ktpa 50ktpa , plus new mines Sunrise drilling results Sunrise reserve &  Large disseminated  production – 5‐10ktpa resource potential Mill expansion decision 4th mine from Forrestania  FinnAust  producing Cash costs <US$3.00/lb (New Morning) Base Metals exposure Strong cashflow Mill expanded 750ktpa Dividends Dividends First quartile cash costs Continued exploration  New offtake contract – process  FinnAust  in feasibility upside begin Sept/ Oct Dividends Independent producer List FinnAust Mining Mustang prod – 5ktpa 23
  24. 24. The Portfolio  Kawana JV JV  80%  Sandstone  JV 70%  East Bull  Lake JV  65%  Cosmic  Bullfinch   Makwa &  North JV  N h JV Mayville  M ill Spotted Boy  70% Canada Quoll Resource New  Morning Mt  Flying  Koolyanobbing y g Diggers Alexander  Alexander Fox South JV 25%  Sunrise Spotted  Mt Gibb JV  Quoll  Bioheap Lake King  70%  70% Southern  JV 70% JV 70% Underground  Underground Cross  Upgrade Goldfields ‐ Other Cosmic  Finland – Cosmic  Boy Mill Hatters  Hill Copper Boy Mill  Jkjjljljlkj jj j j j Expansion Finland – Nickel Mt Jewel 25% = International =  WA Regional = Forrestania  24
  25. 25. Nickel Industry 25
  26. 26. When will the Cycle Turn? Market bottom likely reached – current price  uneconomic for many, insufficient to bring on  uneconomic for many insufficient to bring on “The current nickel market appears to  supply be ignoring the impending impact of  Limited sources of good quality future supply for  Indonesian legislation… smelters “We therefore favour bullish positions  Nickel Pig Iron constrained due to margin  in nickel on a 3‐6 month forward basis  compression and in a quarter‐four context.” Huge Laterite projects serial underperformers Huge Laterite projects serial underperformers Citigroup Analysts, 31 May 2012  Capex blowouts  Not meeting production targets “We are raising our long‐term nickel  price from $7.27/lb to $9.5/lb. …. We  I d Indonesian ore export ban and tax increase still to  i b d i ill believe that capex inflation remains a  bite significant issue for the nickel  industry.” Fortunately, not in the business of making  predictions BofA Merrill Lynch, 27 July 2012 Many analysts tipping next 3 – 6 months for pickup,  in conjunction with seasonal demand pickup 26
  27. 27. Global Stainless Consumption & Usage 35.0 45.0 Post-War Stainless Steel-Boom: Stainless Steel‐Boom: Crisis Years Reconstruction R t ti Asia Europe - USA A i -E China 40.0 nsumption in Mill t 2008 - 2010 30.0 World-Financial China Share of Global Demand, in % Crises 35.0 n, a 25.0 30.0 20.0 20 0 Globa Stainless Steel Con 25.0 f 15.0 Stainless Steel Consumption 20.0 G.R.: 6 1% p a G R : + 6.1% p.a. s 15.0 10.0 10.0 al n 5.0 5.0 0.0 0.0 1968 1972 1976 1980 1984 1988 1992 1996 2000 2004 2008 27© Heinz H. Pariser Alloy Metals & Steel Market Research
  28. 28. China’s future? 30.0 30 0 25.0 South Korea Stainless per Capita Use, in kg k 20.0 Japan a 15.0 EU 27 10.0 China 5.0 NAFTA India 0.0 1970 0 5 10 15 20 25 30 35 40 45 50 GDP (PPP adjusted) per Capita, in Mill US$ 28© Heinz H. Pariser, Alloy Metals & Steel Market Research
  29. 29. Energy Intensity 1. Conventional Nickel Sulphide Mature nickel camps contribute ~45%  global production global production NO MAJOR NEW DISCOVERIES 2. Low Grade disseminated sulphide 2 L G d di i t d l hid Increasing reliance on low grade and  low quality nickel sulphide production.   HIGH CAPEX, MODERATE ENERGY ,3. Nickel Laterite Laterite & Ferro Nickel contribute >40%  global production HIGH CAPEX, HIGH ENERGY COST4. Chi Chinese Nickel Pig Iron i k l i Chinese nickel pig iron, 15% global  production.  Announced cut backs ENERGY INTENSIVE, HIGH COST , Increasing energy intensity  and production cost Increasing energy intensity  and production cost 29
  30. 30. The End 30
  31. 31. Appendices 31
  32. 32. Income Statement Commentary (FY 2012)Earnings Data ($000) g ( ) 1H FY 2012 2H FY 2012 FY 2011 FY 2012  Ni price down 29% year on year (QP ‐Exchange Rate USD/ AUD 1.03 1.03 0.99 1.03 A$26.4m FY2012) reducing revenue byNickel Price (U$/tn avg)        18,761        18,276        24,000        17,791 A$131.4m.Revenue 149,106 181,592 468,659 330,698  Despite nickel price, EBITDA margins remained strong >50% >50%.EBITDA  96,633 89,950 312,018 186,583Depreciation & Amortisation 43,819 47,862 80,027 91,681  Switch to two underground mines in Feb 2012 – SQ Open Pit was A$1.60/lbEBIT (000) 52,814 42,088 231,991 94,902  Cost management remained in focus withInterest Expense ( 000)Interest Expense (000) 18,086 18 086 19,355 19 355 36,721 36 721 37,441 37 441 unit cash costs at $A2.43/lb.Tax (000) 10,626 6,654 60,297 17,280  D&A increases in line with higherNPAT (000) 24,102 16,079 134,973 40,181 investment mine development/ capex & ( )Dividend (cents) 5.0 6.0 25.0 11.0 KZL nickel purchase.Earnings per share (cents) 13.4 9.0 75.1 22.4  D&A should stabilise/reduce in FY2013 with increased reserves.  Final dividend declaration of 6c (partially franked) reflects 49% of NPAT returned to shareholders for FY2012. 32
  33. 33. Cashflow Statement Commentary (FY 2012)Cashflow Statement ($000) 1H FY 2012 2H FY 2012 FY 2011 FY 2012  Cashflow from Operations of A$159 3m A$159.3mOperating Cashflow       64,412       94,841      276,235      159,253  2nd half FY12 produced A$4.6m free cashflowLess: despite a weaker 2nd half nickel priceExploration (17,860) (15,940) (18,110) (33,800)  A$ Ni price down 29% on FY11 ‐A$131.4mFinnAust InvestmentFinnAust Investment (4,058) (4 058) (3,307) (3 307) (1,964) (1 964) (7,365) impact. impactAcquisition of Mining Interests (1,512)                  ‐                  ‐ (1,512)  US$15m for Outokumpu Royalty payout.Mine Development (38,506) (28,911) (70,664) (67,417)  Exploration spend of A$33.8m delivers SunriseCapital Expenditure (8,087) (5,625) (13,417) (13,712) and significant resource/ reserve extensionsInvestment activities i ii (274) ( ) (811) ( ) (1,999) ( ) (1,085) ( 08 )  KZL nickel purchase costs of A$71.1m includesOutokumpu Royalty Payout (14,926)                  ‐                  ‐ (14,926) the A$3.1m for ore stockpiles.Payment for subsidiary                  ‐ (71,100)                  ‐ (71,100)  Proceeds from financing ‐ draw down ofProceeds from Share Issues                  ‐                  ‐             380                  ‐ A$45m from ANZ for KZL nickel purchaseProceeds/(Costs) from Financing (319)       44,486 (3,517)       44,167  Dividend payments reflect 15c final dividendDividends Paid (26,962) (8,987) (23,364) (35,949) from FY11 and 5c interim dividend for FY12.Net Cashflow (48,092)         4,646      143,580 (43,446)Cash at BankCash at Bank   160 856 160,856   165 502 165,502   208 948 208,948   165 502 165,502 33
  34. 34. Free Cashflow Waterfall WSA Cashflow ‐ Actual FY11 vs Actual FY12 250 $8.0 $3.2 ‐$4.8 ‐$5.4 200 $47.7 $10.0 ‐$12.6 ‐$14.9 ‐$15.7 ‐$71.1 150 $143.6 $143 6 100 ‐$131.4Millions 50M ‐$43.4 0 Other Dividends Mine Dev Financing Exploration KZL Nickel Op Costs Actual FY11 yalty Buyout Sales (Price) Actual FY12 Sales (Vol) national Inv ‐50 100 ‐100 A A Intern S Roy ‐150 Nickel price has driven the changes from FY11 to FY12  Nickel price has driven the changes from FY11 to FY12 – A$131.4m KZL nickel purchase is a one‐off item – A$71.1m 34
  35. 35. Balance Sheet Commentary (FY 2012)Balance Sheet ($000) FY 2011 FY 2012  Flexible balance sheet with good cash generationCash at BankC h tB k 208,948 208 948 165,502 165 502  Total Assets continue to grow with mineReceivables 27,719 25,360 development and acquisitionsStockpiles & Inventory 30,942 42,121  Repaid A$105.5m bond on 2 July 2012 – wellPP&E 111,683 111 683 107,111 107 111 flagged to market and strong positioning gg gp gExploration & Evaluation 91,875 133,282  Capital Management has plenty of headroom:Mine Development 209,454 295,634  ANZ Facility of A$125m – drawn down $45m for KZL nickel purchaseOther 11,705 , 5,958 ,  Convertible bond July 2014 – A$110.2mTOTAL ASSETS 692,326 774,968  Convertible bond July 2015 – A$125.0mTrade & Other Payables 59,791 66,444  FY13 capex/mine development likely to be <A$70mShort Term Borrowings 61 162,656Long Term Borrowings 344,016 256,003  FY13 exploration around A$20m, with a reduction l d $ h d in regional projects, but full ramp‐up aroundTOTAL LIABILITES 403,868 485,103 ForrestaniaSHAREHOLDERS EQUITY 288,458 289,865 35

×