  1. 1. euclidcreek.blogspot.comEuclid Creek TunnelCommunity UpdateMay 21, 2013
  2. 2. euclidcreek.blogspot.comAgenda• Project Overview• Construction Updates• Shaft Updates• Contact Info
  3. 3. euclidcreek.blogspot.comProject Overview
  4. 4. euclidcreek.blogspot.comEuclid Creek Tunnel:By the Numbers• Tunnel– 24’ diameter– 11,650/17,750’– 60,100,000 gallons• ~30 near surfacestructures– 11 complete– 14 under construction• Shafts: 5 total– 24’ to 60’ diameter– 185-225’ deep– 3 full depth, 2 @ mid• 2,440 linear feet ofopen cut pipe placed• 2,110 linear feet ofmicrotunnel complete– 240 more to go
  5. 5. euclidcreek.blogspot.comConstruction Updates• Mackenzie has “mined and lined” more thanhalf of Euclid Creek Tunnel• Nottingham at Lakeshore now opened• E 174th at Lakeshore to Nottingham closed• E 156th at Lakeshore temporarily closed(to be reopened by June)
  6. 6. euclidcreek.blogspot.comShaft #1: Construction Staging Site• “Mackenzie” tunneled and lined 11,650’+• Operating 24/7 with regularly-scheduledmaintenance periods• Lake Erie tunneling completed• Tunneling beneath Beulah Park completed
  7. 7. Project Overview
  8. 8. euclidcreek.blogspot.com
  9. 9. euclidcreek.blogspot.comShaft #2: Easterly WWTP• Shaft 2: 95 feet excavated– Blasting last 100 feet; will begin this year• Structure 2-2: installing final lining• Structure 2-8: installing final lining
  10. 10. euclidcreek.blogspot.com
  11. 11. euclidcreek.blogspot.com• East 156th Street– Road temporarily closed for three weeks, to bereopened by June (close mid July)– Detour for residents requiring access to East 156thStreet north of closure is via apartment complex– West side sidewalk still closedShaft #3: Beulah Park
  12. 12. euclidcreek.blogspot.com
  13. 13. euclidcreek.blogspot.com• Shaft 3– Blasting to begin mid-June• Internal Pre Blast Surveys– For structures within 500’ with basements only– 3 copies of letters distributed (2 copies viacertified mail and 1 copy hand delivered)– Surveys currently on going for those residents thatreplied to letterShaft #3: Beulah Park
  14. 14. euclidcreek.blogspot.comSite #4: Triangle Park• Excavation of shaft is complete at this site• Nottingham Road is re-opened• East 174th Street closed(Structures 4-5 and 4-6)• Lakeshore Boulevard Relief Sewer beginsconstruction before completion of bafflestructure lining
  15. 15. euclidcreek.blogspot.comYOU ARE HERE!
  16. 16. euclidcreek.blogspot.comSite #4: Lakeshore Blvd. Relief Sewer• New Shaft (4-1A) Constructed– 22’ excavation diameter, 16’ finished diameter– 70’ deep• 66” trenchless sewer pipe, tunneled fromEuclid Creek Pump Station to Shaft 4
  17. 17. euclidcreek.blogspot.comSite #4: Lakeshore Blvd. Relief SewerConstruction Schedule• July 2013  January 2015– Construction of new Shaft by Euclid CreekPump Station– Trenchless construction from Triangle Park tonew shaft by pump station– Contractor: McNally/Kiewit ECT JV• March 2014  September 2015– Open cut construction on Lakeshore Blvd.,East Park Dr. & Crestland Rd. and rehabilitation ofEuclid Creek Pump Station– Contractor: TBD
  18. 18. euclidcreek.blogspot.comSite #5: Nottingham & St. Clair• Excavation complete of Shaft 5:225 feet excavated• Concrete placement for final lining beganweek of April 8th– 4,700 cy of concrete• Continued excavation of Structure 5-4• Closure of St. Clair at E 185th upcomingJune/July
  19. 19. euclidcreek.blogspot.com
  20. 20. euclidcreek.blogspot.comStay Informed• Blog– EuclidCreek.blogspot.com• Collinwood Observer– Ads and articles• Semi-Monthly Newsletter– E-mail distribution– eltingj@neorsd.org to be added to the list
  21. 21. euclidcreek.blogspot.comHow to Reach UsSocial Mediafacebook.com/yoursewerdistrict@neorsd | @wallywaterdropCustomer Service(216) 881-8247Emergencies: NEORSD ECT Field Office(216) 268-5469Ryan Sullivan, sullivanr@neorsd.orgJenn Elting, eltingj@neorsd.org
  22. 22. euclidcreek.blogspot.comNext MeetingTuesday, June 18, 20136:00 p.m.Cleveland Public Library,Memorial-Nottingham BranchSave the Date!July 16August 20September 17

×