Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

0

Share

Download to read offline

W.O. Place (CV)

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

W.O. Place (CV)

  1. 1. WO PLACE WORK EXPERIENCE 2014 – 2016 Siemens Energy Inc. 2014 – 2016 Siemens Energy Inc., Site Execution – Mechanical Piping Engineer for EPC, CCPP Responsible for all BOP above ground process piping, including trouble shooting design issues with miss match of equipment connection to process piping, dealing with multiable contractors, Including a Water treatment plant, Tank farm with 4 fuel oil tanks and 2 biodiesel tanks and there distribution pumps. Also responsible for ECC packages to turned over to the commissioning as well as the client at Central Termoelectrica Guillermo Brown in Bahia Blanca, Argentina. 2013 – 2014 Siemens Energy Inc., Site Execution – Mechanical TFA for Installation of KN Steam Turbine and their Auxiliaries including piping at Termozulia lll in Maracaibo Venezuela. 2013 Siemens Energy Inc., Site Execution – Mechanical TFA training on a KN Steam Turbine on new construction with the responsibility of learning and assembling HP Turbine, LP outer casing, LP inner casing with setting the LP Turbine and their Auxiliaries including piping at Panda Temple Power Plant, in Temple TX, USA 2012-2013 Siemens Energy Inc, Site Execution – Mechanical Lead TFA for 2 of 12 W501F (5) with the responsibility of Installation GT/GTG and their Auxiliaries, including piping, working with Samsung LTD at Qurayyah Power Plant (QIPP) in Saudi Arabia. 2012 – Siemens Energy Inc, Site Execution – Mechanical Piping lead TFA for 2 of 12 W501F (5) with the installation responsibility of auxiliaries and the inter connection piping at Raz Al Kahair Power Plant, Saudi Arabia. 2011-2012 Siemens Energy Inc, Site Execution – Mechanical lead TFA with the Responsible for the Installation and cold Commissioning of 2 W501F (4) Gas Turbines including auxiliaries at Termozulia III, Maracaibo, Venezuela. 2010-2011 Siemens Energy Inc, Site Execution – Mechanical lead piping TFA with the Responsible for the installation and commissioning of STG mechanical system including the auxiliaries necessary to operate the ST at Longview Power plant in West Virginia USA 2010 Siemens Energy Inc, Site Execution – Mechanical installation of piping on 2 W501 gas turbines and responsible for installation and commissioning of all the CTG mechanical systems including the auxiliaries to operate the CT, at Posco Power, in Seoul, South Korea. 2009-2010 - Siemens Energy, Inc, Site Execution - Mechanical Installation of 2 CMI, HRSG’s and all auxiliary provided by Siemens, Also Chemical cleaning and steam blows and commissioning of full combine cycle plant at Termoelectrica, Manuel Belgrano. Buenos Aires, Argentina. 2008-2009 – Siemens Energy, Inc., Site Execution – Mechanical Installation of 2 W501F gas turbines, Responsible for the installation and commissioning of all the CTG mechanical systems including the auxiliaries necessary to operate the CT at Termozulia II, Maracaibo, Venezuela. 2002 to 2008 – Teton Industrial Construction:
  2. 2. 2007-2008- Piping Superintendent on FGD Project Plant Bowen installation of process pipe for emission of coal powered plant and commissioning of auxiliaries systems, in Cartersville GA, USA 2005-2007-Piping foreman on installation of two Siemens 501F gas turbines, mechanical lead supervisor responsible for the installation and commissioning of all the CTG mechanical systems including the auxiliaries necessaries to operate the CT and HRSG’s and reverse osmosis water treatment plant at Lakeside Power Plant for Pacific Corp, in Orem UT, USA 2004-2005- Piping foreman on installation of two GE gas turbines and mechanical lead foreman on start-up and commissioning of turbines, HRSG’s and Toshiba steam turbine at Mona, Utah for Pacific Corp, USA. 2004- Piping foreman on installation of three GE gas turbines and mechanical lead foreman on start-up and commissioning of turbines and reverse osmosis water treatment plant at Marsh Run Generation Plant, Remington, VA, USA. 2003 - Piping foreman on installation of two GE gas turbines and all associated ancillary equipment and start-up and commissioning duties at Stanton Energy Plant, Orlando FL, USA 2002- Piping foreman on installation of six GE gas turbines, HRSG’s and all associated ancillary equipment and start-up and commissioning duties at Forney Power plant for Florida Power and Light, Forney, TX, USA. 2000-2002 – Brown & Root. Maintenance technician for PPG Fine Chemicals, La-porte TX (Hyd pumps, motors, chiller units, low pressure HVAC systems) 1988-2000- General machinist for Massey Grinding Services (Precision grinding and CNC machinist, manual machinist and shop floor supervisor) EDUCATION 2013 OSHA 30hr course holding OSHA 30 Card 2001-2002 PPG Fine Chemicals, Laport TX 713 928 5281 Refrigerant Transition and Recovery Program, Qualified HVAC Technician, Holding a Universal License, 2000-2001 Baytown Lee College, Baytown TX Millwrights 1,2,3,4 and Pipe class 1 and 2 Holding NCCO cards [ Need to complete College English for Associates Degree ] 1983-1986 Channelview High School - General Studies

Views

Total views

101

On Slideshare

0

From embeds

0

Number of embeds

20

Actions

Downloads

2

Shares

0

Comments

0

Likes

0

×