Leuze Web Design Project

567 views

Published on

Mock presentation for Project Management class. Worked as a group to propose solutions for a start-up web designs company. I was Assistant PM. We made little and gigatanic mistakes, but still got a good grade.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
567
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Good Afternoon, Thank you for meeting with us today, we appreciate your consideration in hiring our company to service your networking needs. In the hopes you choose us, we have prepared a presentation outlining the tasks that we will execute if selected. The initial planning is subject to change and we are eager to meet with your IT staff to discuss setup and revisions.We are Project Solutions; allow me to introduce my team: Stephanie Wilks (Vice President, coordinator) Christian Beck (Research, Sales & Marketing) Michael Brittain (Risk Management, Sales & Marketing) Susan Parks (Human Relations, Network Design/engineer) Michael Gilkey (PC Network/Cisco Engineer) Company history, staff certifications, companies we work with, number of customers served, and percent success rate. Important to build trust and earn customers interest in choosing us. Introduce staff member and their departments of expertise.
  • State assumptions clearly
  • Weekly description,
  • Switches, routers, wireless devices, and cabling. Talk about redundancy.
  • Define technical terms, a visual will help customer with understanding. Allow customer to ask questions for clear understanding of this particular task.
  • After surveying the new building and assuming that the computers are set up in the offices exactly how the customer wants it. Still using your imagination. Reminder: mention docking stations for laptop employees
  • Factor in extra OS and Software licensesSystem requirements
  • Suggest Blackberry, International Plan for PDA, BlackBerry, or iPhone $64.994, 11, 14 Includes Corporate , Personal Email,Internet Browsing,Internet Access, Text MessagingStaff training of devices and software.
  • Include man hours of customers ppl and our IT staff. Set hours per workday. No weekends
  • Leuze Web Design Project

    1. 1. Leuze Web Design Project<br />Prospective overview by: <br />
    2. 2. Since its creation in 2003, Project Solutions’ key goal has been to provide the best service possible to our client base and to spread that passion for network design and implementation.<br /><ul><li>Certified Staff
    3. 3. High success rate
    4. 4. Prompt Completion
    5. 5. Lasting Relationships</li></ul>Project Solutions<br />
    6. 6. Perform site survey<br />Design a network that meets/exceeds requirements<br />Select appropriate network devices<br />Install requested software<br />Test connectivity, troubleshoot<br />Complete promptly<br />Maintain an open line of communication<br />Optional Add-ons<br />Objectives<br />
    7. 7. Schedule<br />Microsoft Office Project 2003<br />
    8. 8. Distribution-<br />Cisco WS-C3750-48PS-S Catalyst 3750-48PS <br />Cisco SGE2010 48-port Gigabit Switch<br />Linksys SRW 2008P 8-port<br />Access-<br />Cisco Catalyst 3560-48TS 48-Port<br />Cisco 2960 48-port switch<br />Cisco SLM2048 48-port Gigabit Smart Switch<br />Network Devices -Switches<br />
    9. 9. Wired – <br />Cisco 2821 Sec/k9<br />Cisco 2811<br />Cisco - 1811 - CISCO1811/K9 <br />Wireless – <br />Linksys WRT160N Ultra RangePlus Wireless N Router <br />Cisco WRT160NL Wireless-N Broadband Router <br />Linksys WRT610N Wireless N Router <br />Network Devices- Routers<br />
    10. 10. 500ft UTP Cat5e cabling <br />Cables To Go 25-Foot Cat5e Crossover Patch Cable<br />Cables To Go 100-Foot Cat5e Assembled Patch Cable<br />Network Devices- Cabling<br />
    11. 11. A VLAN is a Virtual Local Area Network<br />Configure a network for basic roles<br />Ports cannot communicate with each other<br />VLANs allow us to divide a network without the use of more equipment<br />To make ports communicate between VLANs they need to be routed with a router.<br />What is a VLAN?<br />
    12. 12. VLAN Assignments<br />VLAN 34 Sales<br />VLAN 58 Development<br />VLAN 67 Marketing<br />VLAN 78 Administration<br />VLAN 1-1001 Management (Network)<br />
    13. 13. Logical Topology<br />
    14. 14. Acquire Software<br />Vista OS<br />MS Office Standard 2007<br />Adobe ACS4<br />Install and Image Laptop<br />Connect to PCs<br />Daisy Chain 10 PCs then Remaining 75<br />Connect to Laptops<br />Daisy Chain 10 Laptops then Remaining 40<br />Test Software<br />Operating System & Software<br />
    15. 15. 50 Blackberry Phones<br />Purchased with service contract<br />Leased with Support Included<br />Adobe ASC4<br />Support<br />Additional Training<br />Optional Services<br />
    16. 16. Hacking & Other Security Breaches<br />Network Failure<br />Faulty Equipment<br />Location of Network Equipment<br />Client Hardware<br />Early Close Out<br />Risk Analysis<br />
    17. 17.
    18. 18.  <br />WEEK 1 Begin LWD Project<br /> Research and obtain OS and software licenses<br /> Arrival and Installation of hardware<br />WEEK 2 Network Preparation and Configuration<br /> Our IT staff will configure network devices based on department <br /> needs <br />WEEK 3 Diagnostics/Installation of Software<br /> Troubleshooting (if needed)<br /> Using a common practiced system to install software on all PC’s <br /> and Laptops<br />WEEK 4 Walkthrough/meet with existent IT staff/Close Out<br /> Walkthrough with LWD IT Team, discuss changes if needed, revise<br /> When the entire network is working, software is installed properly<br />Schedule<br />
    19. 19. Monday through Friday<br />9pm to 5 pm<br />No weekends<br />Equipment fees based on our suggestions<br />Budget<br />
    20. 20. 2550 Langdon Ave<br />Detroit, MI 48978<br />Office: 313.867.5309<br />Fax: 313.867.5310<br />Visit us online at: www.itprosolutions.com<br />Contact Us<br />

    ×