Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Bim & järnväg i belgien

348 views

Published on

Presentation från Novapoint Användarträff 2014

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

Bim & järnväg i belgien

  1. 1. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober BIM & Railwayin Belgium Customer case Benjamin Van Daele, Managing Director Vianova Systems BeneluxBVBA
  2. 2. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober About Belgium Some figuresand background information •Area: 30,528km2 •Population: 11 Million •Density: 363.6/km2 (17x more than Sweden 21.5/km2 ) •Languages (3): NL, FR, DE Map of Belgium By Provinces
  3. 3. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Chocolates Football EU Head Quarters Magritte Historical Monuments Diamants Beers Fries Manneke Pis The Atomium Eddy Merckx
  4. 4. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober About the Belgian Railways Some figures and background information Map of the Belgian Railway Network •Infrabel (Infrastructure owner) •3595 km lines •12609 bridges, tunnels, etc. •1 Billion €investments (2013)
  5. 5. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Customer Case -TUCRAIL
  6. 6. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Project management, design and execution of rail infrastructure projects. •Subsidiary of the Belgian national railway company (Infrabel) •Employs over 1000 people •Turnover ~100 Million €(2013)
  7. 7. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Design Department 7 different dicsiplines (~250 engineers) 10 Software 3D Design since 2007 BIM since 2012
  8. 8. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Disciplines were collaborating but sequentially Building combined 3D model = very time consuming and already out-of-date once produced Project’s info still in multiple files and formats Why BIM? Data loss & risk of exchanging wrong information
  9. 9. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober BIM Solution Architecture QuadriDCM& Novapoint 19DCMBase
  10. 10. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Gather all data into one LIVE engineering model Easy to use (downsize implementation impact) Strong visualization & data analyses Handle a process with many disciplines Real multi-user environment on objects level Objectives
  11. 11. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Design Modules for Designing Infrastructure BIM CLIENT for Modelling and Analyzing Infrastructure BIM SERVER for Model-based Collaboration in a Private Cloud Desktop (local) Server (private or public cloud) Solution Architecture
  12. 12. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober BIM SERVERQuadriDCMBIM CLIENTNovapointDCM Base 19OTHER DBASES & APPS... Connection to 3rdparty apps & dbases trough API Dataflow controlled by user management (roles), processes & tasks... Native data is upgraded to “intelligent features” Internet/Intranet (private) cloudDESIGN MODULES
  13. 13. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Workflow –Integrated BIM Other... Survey & Terrain Buildings Used Design Software: •Novapoint Railway •Novapoint Road Design •Novapoint Survey •AutoCAD •AutoCAD Civil 3D •Autodesk Revit •Autodesk Inventor •Solidworks •InfoWorks •... QuadriDCM
  14. 14. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober •Centralized multidisciplinary data, singel point of truth •Accessible for everyone at any time (user roles) •Userfriendly interface •Object level (geometry + information) •One live engineering model Benefits of integrated BIM with QuadriDCM Save time Reduce errors Improve collaboration
  15. 15. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Example Project Mobility Masterplan 2020, Cit of Antwerp
  16. 16. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Promote “environmental friendly” transportation of commercial goods Improvement of the residential liveability
  17. 17. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober •Widen channel to 63 meters •Heigten vertical clearance to 9,1 meters Project Description
  18. 18. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober •Replace (3) railbridges -modified clearance zone •Heighten longitudinal profile of the lines •Adjustments to railtracks, overhead lines & signalisation •Repare and rebuild nearby road infrastructures •Build new embankment •Budget of 20 Million € •Duration 2,5 years Work overview –Project 048
  19. 19. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober City of AntwerpRailbridge 1Railbridge 2Railbridge 3
  20. 20. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Getting the job done on time and on budget Handling a project’s complexity while meeting the safety requirements Managing multiple design changes & phases Coordinating & collaboration between many dicsiplines Some challanges...
  21. 21. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober How did QuadriDCMhelp? Some examples...
  22. 22. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Detect design errors, ajust and communicate instantly
  23. 23. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Detect design errors, ajust and communicate instantly
  24. 24. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Integrated process & task model = full project phase control
  25. 25. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Handling large & compelex datasets
  26. 26. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober All accurate data is available for anyone at any time
  27. 27. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Real-time, multi- disciplinary cross section views & analyses
  28. 28. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Visualization & analyses
  29. 29. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Building 3D combined model while designing it = “live model”
  30. 30. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Customer Quote Vincent De Breuck ICT Development Project Manager at TucRail "TUC Rail has with QuadriDCMfound the perfect match for optimizing the level of collaboration between our services."
  31. 31. NOVAPOINT ANVÄNDARTRÄFF 2014 │Göteborg 23-24 oktober Thank you

×