SITE PREPARATION
Inspection of site - topographical features.
Markings are made as per the prepared design and bored on ...
POST CASTING
Posts are casted on the marked points for mounting panel structures
Minimum Embedment of poles/posts is nec...
MOUNTING OF PANEL STRUCTURES
Panel structures are mounted on the casted posts
Posts are checked for their right vertical...
STRUCTRE ALIGNMENT AND TORQUING PROCESS
Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket...
Cables, Pipes and Joints
CEMENTED PIPE
For easy travelling of vehicles
Ensures strength of pipe for long run
Minimizes ...
Installation of Junction Box
SEALED CAPS
Protection from rodents/insects
Augment life of cables and wires
Note : All pho...
MODULES CONNECTION AND PLACEMENT
Modules in wooden box/iron boxes are placed in front of structures before placing them o...
First Solar Thin Film
Place: Ujjain, Zone 1
Solar Frontier CIS
Place: Ujjain Zone 2
Polycrystalline,
Canadain Solar
Place:...
Inverter Rooms
Matt- fitted inverter rooms to soak dust and water
Place: Ujjain, M.P., Inside Inverter Room
Tier 1 Inverte...
PV Switchgear and Substation
Lightening Conductor
Prevention from lighting
SEARCH PROTECTION DEVICE FITTED COMBINER BOX
Tier 1 Supplier: AEG/Skytron
Detects output of each panel
Locates any fault...
WEEKLY MAINTENANCE OF INVERTERS
Specialised vacuum cleaners for inverter rooms
 Regular cleaning increases life of invert...
Yes, the life of a solar park is minimum 25 years…
provided we follow systematic, meticulous
procedures during installatio...
Locations & Contact Details
Web: www.vivaansolar.com | Mail: info@vivaansolar.com
Instant Helpline: (91) 9999055452
Corpor...
Upcoming SlideShare
Loading in …5
×

Steps for conceptualization of a solar power plant vivaan solar v2

851 views

Published on

Steps for Conceptualization of Solar Park by Vivaan Solar

Published in: Engineering
  • Be the first to comment

Steps for conceptualization of a solar power plant vivaan solar v2

  1. 1. Steps of Installation| Vivaan Solar Private Limited Harnessing the power of Sun to Energy
  2. 2. Steps of installation of solar power plant Note : All photos used in the presentation are actual site photographs.
  3. 3. SITE PREPARATION Inspection of site - topographical features. Markings are made as per the prepared design and bored on particular points In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground. Site Preparation, Levelling and Boring Disk and Roll Technique Note : All photos used in the presentation are actual site photographs.
  4. 4. POST CASTING Posts are casted on the marked points for mounting panel structures Minimum Embedment of poles/posts is necessary:1 m Embedment depends on Soil Strata( after soil testing) 1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil Right Entrenchment provides strength to overall structure during heavy wind flow Width of post : Width: 1 50 mm- 200mm Initial Post Casting at Site Ground Level Min Embedment: 1 m Width : 150-200 mm Note : All photos used in the presentation are actual site photographs.
  5. 5. MOUNTING OF PANEL STRUCTURES Panel structures are mounted on the casted posts Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method) Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures Mounting of panel structures Note : All photos used in the presentation are actual site photographs.
  6. 6. STRUCTRE ALIGNMENT AND TORQUING PROCESS Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts Structure alignment Bolt Tightening Technique Note : All photos used in the presentation are actual site photographs.
  7. 7. Cables, Pipes and Joints CEMENTED PIPE For easy travelling of vehicles Ensures strength of pipe for long run Minimizes losses due to breakage of pipes DWC PIPE Minimizes wear and tear of pipe due to sun exposure Augment life of cables and wires Thus, increasing life-span of park T-JOINTS +DWC PIPES Protection of cables @ detailed level Enhances longevity of plant Boost strength of overall structure Note : All photos used in the presentation are actual site photographs.
  8. 8. Installation of Junction Box SEALED CAPS Protection from rodents/insects Augment life of cables and wires Note : All photos used in the presentation are actual site photographs.
  9. 9. MODULES CONNECTION AND PLACEMENT Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked. Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once first comes out Safety Gloves and helmets are used for electrical connections of panels Placement of Modules Note : All photos used in the presentation are actual site photographs.
  10. 10. First Solar Thin Film Place: Ujjain, Zone 1 Solar Frontier CIS Place: Ujjain Zone 2 Polycrystalline, Canadain Solar Place: Uttarakhand Note : All photos used in the presentation are actual site photographs. We researched thoroughly across the globe for the panels to use of best technology available Polycrystalline(Candian Solar) Thin Fim Techonology (First Solar, US) CIS Frontier (Solar Frontier, Japan)
  11. 11. Inverter Rooms Matt- fitted inverter rooms to soak dust and water Place: Ujjain, M.P., Inside Inverter Room Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan) Enhances longevity of plant Reduces maintenance work Proper Ventilation in Inverter rooms Net covering provides protection from rodents/insects Ventilation maintains temperature of inverter rooms Note : All photos used in the presentation are actual site photographs.
  12. 12. PV Switchgear and Substation Lightening Conductor Prevention from lighting
  13. 13. SEARCH PROTECTION DEVICE FITTED COMBINER BOX Tier 1 Supplier: AEG/Skytron Detects output of each panel Locates any faulty panel Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
  14. 14. WEEKLY MAINTENANCE OF INVERTERS Specialised vacuum cleaners for inverter rooms  Regular cleaning increases life of inverters  Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
  15. 15. Yes, the life of a solar park is minimum 25 years… provided we follow systematic, meticulous procedures during installation!!
  16. 16. Locations & Contact Details Web: www.vivaansolar.com | Mail: info@vivaansolar.com Instant Helpline: (91) 9999055452 Corporate Office- Haridwar Second Floor, Heera Complex Ranipur Modh, Haridwar – 249403 p: +91-133-4265178| f: +91-133-4265179 Registered Office- Gwalior Bansal Office, Nehru colony Thatipur, Gwalior- 474011 p: +91-751-2341195, f: +91-751-4014414 Get Social:

×