  1. 1. JI POA: LUMMAX CFL DISTRIBUTION PROGRAMME CME: “PRIMLIGHT LTD” PDD DEVELOPER: GFA ENVEST, SEC BIOMASS Valeriia Leznova SEC Biomass, Consultant Workshop on Programme of Activities, Cologne May 25, 2010
  2. 2. Lummax CFL Distribution Programme Programme objective Replace up to 2 million ICLs with high efficient Lummax CFLs in the buildings of Ministry of Education of Ukraine: I STAGE: replacement of 150 000 ICLs with CFLs II STAGE: distribution of 185 000 CFLs Geographical scope: Kiev Region, Ukraine Applicable methodology JI specific approach Target group Buildings constructed in the 50ies and 60ies Large persistence of ICLs in the baseline case Energy saving up to 260 GWh/year Expected ERUs 230 th.t CO2eq/year Participants Primlight - Coordinating entity GFA ENVEST, SEC Biomass – PDD developer Ministry of Education of Ukraine – objects owner JI PoA status PIN is developed, LoE is obtained (15.12.2009) , pre- feasibility study.
  3. 3. Background: Lummax CFL Distribution Programme Type of Working range, Working hours Working days Working hours organization hours per day per year per year Kindergartens 8.00-19.00 9,9 250 2475 School – 1st shift 8.30 – 4.0 3,85 200 770 School – 2nd 8.30-9.00 9,45 200 890 shift Universities* 8.00-21.30 10,8 220 2376 Administrations 8.00-7.00 8,1 255 2065,5 Outpatient 8.00-20.00 10 26 260 department Hospitals 24 hours 6,5 365 6022,5 Industrial 8.00-7.00 8,1 255 2065,5 enterprises *According to energy audits carried out in the university buildings. Will be used for baseline setting.
  4. 4. Programme concept. Financing Sources of financing Distribute CFLs Financing, % Electricity 22% Financing of CFL Programme CO2 Emission Own funds Credit Generation of ERUs. funds ERUs sale 78%
  5. 5. Proposed programme set-up CFLs Programme CFLs LUMMAX Coordinator (CFL producer) (Primlight LTD) € Buildings ERUs under the authority of € Ministry of ERUs Education Carbon buyer
  6. 6. Challenges for JI PoA and JI projects in Ukraine JI PoA T2: to become operational adoption of amendments to order #206 (Ukrainian JI procedure) is needed. JI project are treated by AIEs as CDM projects during determination/verification: adoption of JI PoA procedure for T1, DVM for T1, local accreditation procedure of AIEs is needed. Lack of available AIEs for JI – strong competition with CDM projects. Nature of ERU: difficult to deal with taxation authorities in terms of revenues from ERUs sale. Legal uncertainties: rights and responsibilities of Coordinating entity, ownership of ERUs.
  7. 7. Potential PoA project “Regional rehabilitation of district heating system” (on the basis of real JI project “Rehabilitation of DH systems in the Crimea” – registered under Track 1) Type of implemented equipment Number of CO2 Total JPA types units emission invest- reduction ments, ths. t/year mln Euro New gas-fired boilers for heat generation 176 6,2 Type A: Rehabilitation 78 of boiler equipment New economizers 122 1, 45 Type B: Installation of Cogeneration plant 1 10 1,5 cogeneration plant Type C: Insulation of Insulated pipelines 516 km 14 3,46 pipelines Type D: Utilization of Landfill gas capture and utilization system 1 53 1 landfill gas TOTAL : - 155 13,6
  8. 8. Potential PoA project “Implementation of bioenergy activities in Ukraine” Type of equipment Ukrainian Installed CO2 Total Possible types market capacity emission invest- of JPAs volume reduction ments, MWth MWel million mln Euro t/year Wood-fired boilers for heat generation, 1-10 MW 1000 500 - 0,56 22,5 Type A: Wood- Wood-fired boilers for industry, 0.1-5 MW 500 350 - 0,53 15,8 fired boilers for heat production Wood-fired boilers for households, 10-50 kW 53000 1590 - 1,78 55,7 Straw-fired boilers, 0.1-1 MW 16000 3200 - 3,71 224 Type B: Straw- Straw-fired boilers, 1-10 MW 1400 2800 - 3,25 168 fired boilers for heat production Peat-fired boilers, 0.5-1 MW 1000 750 - 0,84 26,3 Type C: LFG usage for heat 60 90 60 2,4 30 Landfill gas and power production Small biogas installations (200-600 m3) 1200 86 54 0,44 237 Type D: Energy Farm biogas installations (600-3000 m3) 1600 434 276 1,08 1130 utilization of biogas from Large biogas installations (>3000 m3 ) 40 36 23 0,03 74,4 manure TOTAL: 75800 9836 413 14,62 1983,7
  9. 9. Thank you for attention! Valeriia Leznova SEC “Biomass”, Consultant tel: 0038(044) 456 94 62 e-mail: leznova@biomass.kiev.ua www.biomass.kiev.ua

×