How To Use This Form:
The Property and Facility Survey should be conducted on a weekly basis. Facilitators should start at the lobby, from the first floor, and survey in a clockwise direction. The interior should be done first, then the exterior of the facility. Use a different form for programs with more than one facility. After putting a check or circle around the appropriate color that identifies your general judgment of the items in each category, record location and other identifying notes in the section for other pieces of information. Submit additional copies of this page as needed.
Are you stuck with management problems? #powerofnext We implement quality management systems.
Take our "10 Core Challenge" https://goo.gl/forms/Qi3mz1yfXIXCpTAr2
Download 10 Core Assessments: http://www.urbanetek2.com/#!resources
Share your results, join the discussion, download resources, and listen to podcast using the following links:
http://www.urbanetek2.com/
http://www.blogtalkradio.com/macproductions
https://www.meetup.com/BOMAQ-Building-Owner-Manager-Administrator-Quality-SA/
https://www.facebook.com/thebomaqcompanies
https://twitter.com/bomaqcompanies
Interested in the 10 Core Challenge? Subscribe for more videos here: https://www.youtube.com/Urbanetectonics.