3rd Annual UKTI Civil Nuclear Export Showcase 2014

L&T’s Contribution : Indian
Nuclear Industry
Mr. Philippe TOLLINI
Head...
Power Scenario in India
New Installations - 12th Five Year
Plan (2012 – 2017)
Planned
Achieved

Installed capacity in GW
1...
Indian Nuclear Power Program –
Trend and Plan
0.18

275000
15%

0.16
0.14

17% 250000

0.12

200000
9%

0.1
0.08
0.04
600
...
The Indian Nuclear Power Road Map
AHWR Critical
Facility

STAGE 3
PFBR – 500 MWe
FBTR - 40 MWe

STAGE 2

1000 MWe

KK 1 & ...
Nuclear industry in Indian : Moving forward
Present

Proposed

Source: Nuclear Power Corporation of India (Ltd)

On Januar...
BWR
TAPS 1 & 2
• Initial 2 reactors (1969)
• Imported technology &
equipment

6 of 38
Stage 1 : PHWR – Indigenous Capability Dev.
Equipment
Calandria
End Shield
Steam Generator

Heat Exchangers
Construction
E...
Foreign PWRs - Faster Capacity Augmentation
VVER (Rosatom)
2 Final stages of
construction
4 planned – Tamil Nadu
4 planned...
Stage 2 – FBR 500 MW
Reactor Safety Vessel
Reactor Main Vessel
Reactor Roof Slab
Steam Generator
Decay Heat Exch.

Sodium ...
Kalpakkam large FBR vessel installation

10 of 38
Larsen & Toubro
Founded
1938
Number of Emp.
54,000+

Sales ($ Bn)
7.4

11.7

12.8 14.0

9.8

8.5

5.0

Market Cap
USD 13.8...
Independent Verticals & Subsidiaries
Infrastructure

Hydrocarbon

Heavy Engineering

Power

Metal & Material
Handling

Mac...
Nuclear Accreditations

Construction of NPP Safety Related Components in accordance with:
• ASME NQA-1

• 10 CFR Part 50 A...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

Steam Generato...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

Forgings

Pipi...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Critical Eqpt. Supply since late 60s

Con...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

Steam Generato...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

TAPP 3 & 4 built in...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

Industrial Val...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

LV switchgear
...
Capabilities
Design &
Engg.

Raw
Material

Equipment
Mfg.

Construction

Valves

Control &
Automation

EPC

Engineering
Pr...
Global Participation – a New Frontier
To
Switzerland

To USA

Overpack
Casks

To USA

Canisters

Casks

Casks
22 of 38
Participation in ITER fusion reactor - France
Cryostat

Top Lid

29 m

Upper
Cyl.

Lower
Cyl.

Base
Section

Installation ...
ITER Cryostat - Site Workshop
60 % work completed; Expected readiness by Aug’14

As of January 12, 2014
24 of 38
L& T Facilities
Integrated Manufacturing Complex at Hazira











Heavy Engineering
Heavy Steel Forgings
Ship...
Latest investment for nuclear power industry
L&T Special Steels & Heavy Forgings

India’s largest integrated facility for ...
L&T Special Steels & Heavy Forgings
Steel Melting with 100 T EAF
India’s Biggest Open Die Hydraulic Press
(9.000 T) and 15...
Summary
is moving forward on its large nuclear program
Will continue to develop in-house PHWR & FBR Rx
is partner to India...
L&T looks forward to participate in a bigger way in this truly
international effort for the betterment of Mankind
Upcoming SlideShare
Loading in …5
×

India presentation 2

836 views

Published on

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

India presentation 2

  1. 1. 3rd Annual UKTI Civil Nuclear Export Showcase 2014 L&T’s Contribution : Indian Nuclear Industry Mr. Philippe TOLLINI Head of business Development - Europe January 27, 2014 1 of 38
  2. 2. Power Scenario in India New Installations - 12th Five Year Plan (2012 – 2017) Planned Achieved Installed capacity in GW 156.4 88.4 72.3 39.8 28.1 10.8 4.8 Thermal Hydro Nuclear Renew. 26.1 25.1 Thermal 1 Hydro 5.3 0 Nuclear Total  Total Installed Capacity – 229 GW  2.3% peak supply deficit (~ 3 GW) Source – CEA Report, Oct’13 2 of 38
  3. 3. Indian Nuclear Power Program – Trend and Plan 0.18 275000 15% 0.16 0.14 17% 250000 0.12 200000 9% 0.1 0.08 0.04 600 950 1.8% 2750 100000 63000 3% 4780 150000 104000 6% 0.06 0.02 300000 50000 20000 0 0 1980 1990 2000 2010 % of total electricty Source – DAE site 2020 2030 2040 2050 MW Capacity 3 of 38
  4. 4. The Indian Nuclear Power Road Map AHWR Critical Facility STAGE 3 PFBR – 500 MWe FBTR - 40 MWe STAGE 2 1000 MWe KK 1 & 2 700 MWe Under Const. 540 MWe KAPS 3 & 4 TAPS 3 & 4 MAPS 1 & 2 KAPS 1 & 2 KGS 1 & 2 KGS 3 & 4 NAPS 1 & 2 RAPS 3 & 4 RAPS 5 & 6 220 MWe RAPS 1 & 2 160 MWe RAPS 7 & 8 STAGE 1 TAPS 1 & 2 1970 1980 1990 PWR PHWR 2000 2010 2020 4 of 38
  5. 5. Nuclear industry in Indian : Moving forward Present Proposed Source: Nuclear Power Corporation of India (Ltd) On January 2014, Prime minister of India, Manmohan Singh, laid foundation stone of country's largest nuclear power plant (4 units of 700 MWs each) in Haryana, north of India 5 of 38
  6. 6. BWR TAPS 1 & 2 • Initial 2 reactors (1969) • Imported technology & equipment 6 of 38
  7. 7. Stage 1 : PHWR – Indigenous Capability Dev. Equipment Calandria End Shield Steam Generator Heat Exchangers Construction EPC Control & Automation RAPS 1 to 6 MAPS 1 & 2 NAPS 1 & 2 KAPS 1 & 2 KGS 1 & 4 TAPS 3 & 4 Rajasthan 7&8 Kakrapar 3&4 Valves Under Const. 7 of 38
  8. 8. Foreign PWRs - Faster Capacity Augmentation VVER (Rosatom) 2 Final stages of construction 4 planned – Tamil Nadu 4 planned – West Bengal EPR (AREVA) 6 planned – Maharashtra AP1000 (WEC) 6 planned – Gujarat ESBWR (GEH) 6 planned – Andhra Pradesh 8 of 38
  9. 9. Stage 2 – FBR 500 MW Reactor Safety Vessel Reactor Main Vessel Reactor Roof Slab Steam Generator Decay Heat Exch. Sodium Air Heat Exch. Dummy Fuel Assembly Thermal Insul. Panels 9 of 38
  10. 10. Kalpakkam large FBR vessel installation 10 of 38
  11. 11. Larsen & Toubro Founded 1938 Number of Emp. 54,000+ Sales ($ Bn) 7.4 11.7 12.8 14.0 9.8 8.5 5.0 Market Cap USD 13.8 Bn 06-07 07-08 08-09 09-10 10-11 11-12 12-13 Share holders Others 14% Employees 12% Gov. & Pvt. Financial Institutions 31% Major Shareholders LIC of India (16%) Employee Welfare Foundation (12%) FIIs 18% General Public, 25% Unit Trust of India (8%) AAA Rating with Stable outlook from CRISIL & AAA from ICRA of 38 11
  12. 12. Independent Verticals & Subsidiaries Infrastructure Hydrocarbon Heavy Engineering Power Metal & Material Handling Machinery & Industrial Products Electrical & Automation Buildings & Factories Heavy Civil Infra Power T&D Others Transportation Major Subsidiaries • Shipbuilding • Shipbuilding Water & Ren. Energy • IES • Infra. Dev. Pvt. Ltd. • L&T Finance • Sp. Steels & Heavy • Hyd. Metro Forgings • Realty • L&T Infotech 12 of 38
  13. 13. Nuclear Accreditations Construction of NPP Safety Related Components in accordance with: • ASME NQA-1 • 10 CFR Part 50 Appendix B 13 of 38
  14. 14. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC Steam Generator 3D Model Stress Analysis Plant Model 14 of 38
  15. 15. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC Forgings Piping Castings 15 of 38
  16. 16. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Critical Eqpt. Supply since late 60s Control & Automation EPC 16 of 38
  17. 17. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC Steam Generators for PHWR Steam Generators for PFBR Special Steels & Heavy Forgings Control Rod Drive mechanism17 of 38
  18. 18. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation TAPP 3 & 4 built in record time of 60 months EPC 18 of 38
  19. 19. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC Industrial Valves – For Nuclear Application & BOP 19 of 38
  20. 20. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC LV switchgear sophistication and range to meet global benchmarks Teaming with Rolls-Royce 20 of 38
  21. 21. Capabilities Design & Engg. Raw Material Equipment Mfg. Construction Valves Control & Automation EPC Engineering Procurement Quality Systems Project Management 21 of 38
  22. 22. Global Participation – a New Frontier To Switzerland To USA Overpack Casks To USA Canisters Casks Casks 22 of 38
  23. 23. Participation in ITER fusion reactor - France Cryostat Top Lid 29 m Upper Cyl. Lower Cyl. Base Section Installation at site Cadarache in France Ø 29.4 m 23 of 38
  24. 24. ITER Cryostat - Site Workshop 60 % work completed; Expected readiness by Aug’14 As of January 12, 2014 24 of 38
  25. 25. L& T Facilities Integrated Manufacturing Complex at Hazira          Heavy Engineering Heavy Steel Forgings Ship Building E&C - Hydrocarbon Turbine JV Boiler JV HP Piping Casting ESP Howden 25 of 38
  26. 26. Latest investment for nuclear power industry L&T Special Steels & Heavy Forgings India’s largest integrated facility for heavy forgings – 300 MT ingot, 120 MT forgings 26 of 38
  27. 27. L&T Special Steels & Heavy Forgings Steel Melting with 100 T EAF India’s Biggest Open Die Hydraulic Press (9.000 T) and 150MT Manipulator 27 of 38
  28. 28. Summary is moving forward on its large nuclear program Will continue to develop in-house PHWR & FBR Rx is partner to India’s Nuclear Power Growth Story has proven Capabilities covering entire Value Chain is a global supplier of Critical Equipment & Services 28 of 38
  29. 29. L&T looks forward to participate in a bigger way in this truly international effort for the betterment of Mankind

×