UC Ref Group Nov08 Part 2

357 views

Published on

Published in: Education, Spiritual
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
357
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

UC Ref Group Nov08 Part 2

  1. 1. Optus Coverage Remediation
  2. 2. <ul><li>Optus Coverage Remediation </li></ul><ul><li>Optus commissioned testing of the network in all campuses of the university and at other locations identified by IS (for example the major teaching hospitals) </li></ul><ul><li>Several areas were identified that required coverage enhancement including the Parkville & VCA campuses of the university. </li></ul><ul><li>Site design visits were conducted on 6 th and 7 th November: </li></ul><ul><ul><li>Optus Project Manager </li></ul></ul><ul><ul><li>Construction Engineers x3 </li></ul></ul><ul><ul><li>RF Engineer </li></ul></ul><ul><ul><li>Heritage Consultant </li></ul></ul><ul><ul><li>Property Acquisition Consultant (LegalCommercial) </li></ul></ul><ul><li>Optus have committed to resolving all coverage issues as expeditiously as possible and have set aside circa $3 million dollars to acquire and construct new mobile base stations within the University grounds </li></ul>
  3. 3. Outcomes of initial Optus assessment <ul><li>At a high level Optus identified the following areas for mobile facilities that would meet the optimum coverage objectives for the campuses: </li></ul><ul><ul><li>a new mobile site in the North East corner of the Parkville campus </li></ul></ul><ul><ul><li>a new mobile site in the South East area of the Parkville campus </li></ul></ul><ul><ul><li>a new mobile site in the North West corner of the Parkville campus </li></ul></ul><ul><ul><li>a new mobile site in the middle of the VCA </li></ul></ul><ul><ul><li>a new mobile site on the David Pennington building </li></ul></ul><ul><ul><li>a new mobile site at St Vincents Hospital </li></ul></ul>
  4. 15. Timing & Prioritisation <ul><li>Optus is totally committed to this project, and to that end the intention is to deploy the sites as quickly as possible </li></ul><ul><li>A initial project plan was produced which is copied below for your reference, however it’s fair to say that the intention is to better this by many months. </li></ul><ul><li>At this point in time Optus have effectively completed process step 2 of 7 and now seek your authorisation to move forward </li></ul>

×