Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Rushing Integrated Design

71 views

Published on

Slides

Published in: Engineering
  • Be the first to comment

  • Be the first to like this

Rushing Integrated Design

  1. 1. Engineering| Essentials| Delivery
  2. 2. Engineering| Essentials| Delivery Integrated Design @ Rushing
  3. 3. A Vision for you… Rushing 1. Mechanical 2. Electrical 3. Plumbing 4. Energy 5. Lighting 6. Sustainability 7. Commissioning
  4. 4. What is Integrated Design? https://youtu.be/5eYVKNX37lk
  5. 5. Lack of clear understanding of clear and shared understanding of project goals during conceptual and schematic design Poor communication resulting in extension construction administration A heightened degree of mystery between disciplines Silos – Decision making happens without collaboration between disciplines An abyss exists between design and construction professionals You feel your work (discipline) is ignored and under valued, you become unmotivated and relationship currency is eroded Identifying a Dis-Integrated Process
  6. 6. What Sets Rushing Apart?
  7. 7. https://youtu.be/cRFs0F4SCiE Smart Collaboration (De-Siloing) @ Rushing A Business Model Integrated Design requires: Social Capital, Smart Collaboration Find answers fast results in higher success Capitalize on opportunities: business, engineering solutions; Professional Development
  8. 8. Smart Collaboration Tools: • Email management: heavy CC and search • Revit/NavisWorks/BIM Plans/BIM 360 • Sharepoint (or other sites) • Smartsheet/one note • Specifications • Integrated tools: Revit, IES, Asana, Newforma (etc.) • Deltek Vision financial and client management • Sponsorship/mentoring: cross training • Relationship currency: solve problems, responsiveness
  9. 9. Why Smart Collaboration? • Cross training (individual success/company success). Training connection network expand experience through connection more opportunity for more work when more people involved • Optimize client experience and product delivered • Optimizing Overhead • Template efficiency • Lower risk due to overlap of skills and QC tackle more sophisticated problems with broader solutions • Lower client risk due to single point of contact. Lower consultant risk due to ability to share information and resources. • Information sharing yields broader solutions Lessons learned Value add business intelligence • Commoditization creates price wars: Amazon
  10. 10. • Duplication rework • Conflicting data • “too” much collaboration: Slack; email overload • De-siloing may create feelings of inequity due to equalization of discipline value Smart Collaboration: Cons
  11. 11. ENERGY MODELLING
  12. 12. LIGHTING
  13. 13. SUSTAINABILITY
  14. 14. COMMISSIONING
  15. 15. Design/Bid/Build (Plan & Spec) ConstructionProgram Schematic Design Move In Construction Documents Design Development Commis- sioning Architect M/E/P Engineers M/E/P Contractors Bid
  16. 16. Design/Build ConstructionProgram Schematic Design Move In Construction Documents Design Development Commis- sioning Architect M/E/P Contractors Bid
  17. 17. Design Assist ConstructionProgram Schematic Design Move In Construction Documents Design Development Commis- sioning Architect M/E/P Engineers M/E/P Contractors Bid
  18. 18. Integration: A Building Owner Perspective
  19. 19. 1. Professional Ethics 2. Informed (Expert) Consulting 3. Courageous Transparency 4. Team Building Community: Respectful Language and Conduct 5. Curious Problem Solving 6. Open Minded Learning 7. Focused Actions 8. Patient Resolve Shared Values

×