 1.1. Patio slabs, porch slabs, walks, and  driveways sloped ≥ 0.25 in. per ft. away  from home to edge of surface or 10 ...
It makes sense, start by keeping the water away from the building          Two Trails, Inc. – Green Building Consulting ww...
≥ 6 mil polyethylene sheeting, lapped 6-12 inTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com               ...
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Finish with damp-proofing coatingTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www....
Sump pump covers mechanically attached with full                 gasket seal    Two Trails, Inc. – Green Building Consulti...
 2.1 Flashing at bottom of exterior walls with  weep holes included for masonry veneer  and weep screed for stucco claddi...
Satisfactory Drainage SystemTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slide...
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Caulk Windows and Apply Damp ProofingTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com                       ...
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Our Climate Zone only at Valleys and Roof Penetrations      Two Trails, Inc. – Green Building Consulting www.TwoTrails.com...
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Moisture Content of the Framing is below theRecommended 18%.       Two Trails, Inc. – Green Building Consulting www.TwoTra...
Two Trails, Inc. – Green Building Consulting www.TwoTrails.com                       www.slideshare.net/TwoTrails
Upcoming SlideShare
Loading in …5
×

Energy Star v3.1 | Waste Management System Builder Checklist - Eric Gimson

295 views

Published on

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
295
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Footnotes:1. The specifications in this checklist are designed to help improve moisture control in new homes compared with homes built to minimum code. However, these features alone cannot prevent all moisture problems. For example, leaky pipes or overflowing sinks or baths can lead to moisture issues and negatively impact the performance of this checklist’s specified features. 2. This checklist shall be provided by the Rater to the Builder who shall complete the checklist. Upon completion, the Builder shall return the checklist to the Rater for review. If desired by the Builder, the Rater may verify any item on this checklist. When this occurs, the Rater shall check the box of the verified items in the Rater Verified column. The Rater is only responsible for ensuring that the Builder has completed the Builder checklist in its entirety and for the items that are checked in the Rater Verified column (if any). The Rater is not responsible for assessing the accuracy of the field verifications for items in this checklist that are not checked in the Rater Verified column. Instead, it is the builder’s exclusive responsibility to ensure the design and installation comply with the Builder checklist.3. A completed and signed Indoor airPLUS Verification Checklist may be submitted in lieu of the Water Management System Builder checklist. For more information, see www.epa.gov/indoorairplus
  • Critical Point: Summary:Construction Phase:Inspection:Footnotes:9. Include pan flashing at sills, side flashing that extends over pan flashing, and top flashing that extends over side flashing.
  • Energy Star v3.1 | Waste Management System Builder Checklist - Eric Gimson

    1. 1. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    2. 2.  Section 1. Water-Managed Site and Foundation Section 2. Water-Managed Wall Assembly Section 3. Water-Managed Roof Assembly Section 4. Water-managed Building Materials Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    3. 3.  1.1. Patio slabs, porch slabs, walks, and driveways sloped ≥ 0.25 in. per ft. away from home to edge of surface or 10 ft., whichever is less 4 1.2. Back-fill has been tamped and final grade sloped ≥ 0.5 in. per ft. away from home for ≥ 10 ft. See footnote for alternatives Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    4. 4. It makes sense, start by keeping the water away from the building Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    5. 5. ≥ 6 mil polyethylene sheeting, lapped 6-12 inTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    6. 6. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    7. 7. Finish with damp-proofing coatingTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    8. 8. Sump pump covers mechanically attached with full gasket seal Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    9. 9.  2.1 Flashing at bottom of exterior walls with weep holes included for masonry veneer and weep screed for stucco cladding systems, or equivalent drainage system 2.2 Fully sealed continuous drainage plane behind exterior cladding that laps over flashing in Section 2.1. Additional bond-break drainage plane layer provided behind all stucco and non-structural masonry cladding wall assemblies Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    10. 10. Satisfactory Drainage SystemTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    11. 11. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    12. 12. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    13. 13. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    14. 14. Caulk Windows and Apply Damp ProofingTwo Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    15. 15. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    16. 16. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    17. 17. Our Climate Zone only at Valleys and Roof Penetrations Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    18. 18. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    19. 19. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    20. 20. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    21. 21. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    22. 22. Moisture Content of the Framing is below theRecommended 18%. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails
    23. 23. Two Trails, Inc. – Green Building Consulting www.TwoTrails.com www.slideshare.net/TwoTrails

    ×