SlideShare a Scribd company logo
1 of 1
Download to read offline
Your Values Errors and Notes
VCAP MAX (V) 2.65
VCAP MIN (V) 1.55
tBU (s) 9.48
VSYS (V) 3.04
ISYS_LOAD (A) 0.2
Efficiency η (%) 92
ELOAD (J) 5.76384
Supercap (F) 2.71214003
Input
VCAP MAX (V)
VCAP MIN (V)
tBU (s)
Back UpTime
VSYS (V)
VSYS (V)
ISYS_LOAD (A)
Efficiency
η (%)
Energy supplied to the system load during backup
Perhaps round to nearest standard value
Reserve Power Calculator
Welcome to the Maxim Integrated Reserve Power Calculator. To calculate:
1. Enter your values in the green boxes.
2. Click "Check Values" to ensure they are valid.
3. If there are no comments in the "Errors and Notes" column, click "Calculate" to
get your final value.
If you are still having trouble with number assignments, please refer to the Number Entry Guide
below.
Note: Check values and correct errors before calculating.
2.5V to 5.0V range,100mV resolution
Boost phase target voltage, 80% duty cycle limitation during boosting,100mV resolution
Calculations are based on following values with 5% regulation:
1. Inductor value= 1uH( As per EVK)
2. Ton time= 320 ns (Minimum value as per datasheet)
3. Ipeak current = 2A (Minimum value as per datasheet)
Isys_load value will vary based on efficiency. Please refer to TOC#9 in datasheet.
Please refer to TOC#9 in datasheet to deternimine efficiency value for
corrosponding output volatge and load current
Number Entry Guide
Explanation
2.7V maximum super capacitor rating, 4.5V device maximum; must be below 90% of VSYS,100mV
resolution
0.8V to VCAP max range,100mV resolution
1ms to 10s range

More Related Content

What's hot (13)

Class 34 advanced control strategies – feedforward control
Class 34   advanced control strategies – feedforward controlClass 34   advanced control strategies – feedforward control
Class 34 advanced control strategies – feedforward control
 
Lecture 28 pneumatic control devices
Lecture 28   pneumatic control devicesLecture 28   pneumatic control devices
Lecture 28 pneumatic control devices
 
Decentralized reactive power control for distribution automation (2)
Decentralized reactive power control for distribution automation  (2)Decentralized reactive power control for distribution automation  (2)
Decentralized reactive power control for distribution automation (2)
 
Class 33 advanced control strategies - cascade control
Class 33   advanced control strategies - cascade controlClass 33   advanced control strategies - cascade control
Class 33 advanced control strategies - cascade control
 
Class 15 control action and controllers
Class 15   control action and controllersClass 15   control action and controllers
Class 15 control action and controllers
 
Presentation1
Presentation1Presentation1
Presentation1
 
Inverters
InvertersInverters
Inverters
 
Class 29 pi, pd and pid pneumatic controllers
Class 29   pi, pd and pid pneumatic controllersClass 29   pi, pd and pid pneumatic controllers
Class 29 pi, pd and pid pneumatic controllers
 
Class 39 final control elements - actuators
Class 39   final control elements - actuatorsClass 39   final control elements - actuators
Class 39 final control elements - actuators
 
Lecture 17 actuation systems
Lecture 17   actuation systemsLecture 17   actuation systems
Lecture 17 actuation systems
 
Lecture 19 mathematical modeling of pneumatic and hydraulic systems
Lecture 19   mathematical modeling of pneumatic and hydraulic systemsLecture 19   mathematical modeling of pneumatic and hydraulic systems
Lecture 19 mathematical modeling of pneumatic and hydraulic systems
 
Lecture 26 control valves
Lecture 26   control valvesLecture 26   control valves
Lecture 26 control valves
 
Energy meter presentation
Energy meter presentationEnergy meter presentation
Energy meter presentation
 

Similar to Super capacitor-calculator

Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docx
Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docxWeek 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docx
Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docxdannies7qbuggie
 
Chapter two Part two.pptx
Chapter two Part two.pptxChapter two Part two.pptx
Chapter two Part two.pptxAbdalleAidrous
 
Wireless data monitoring of hybrid powered street light
Wireless data monitoring of hybrid    powered street lightWireless data monitoring of hybrid    powered street light
Wireless data monitoring of hybrid powered street lightNasir Abbas
 
Wireless data monitoring of hybrid powered street light system
Wireless data monitoring of hybrid powered street light systemWireless data monitoring of hybrid powered street light system
Wireless data monitoring of hybrid powered street light systemNasir Abbas
 
AVReporter Schneider Electric M221 plc impulse counter
AVReporter Schneider Electric M221 plc impulse counterAVReporter Schneider Electric M221 plc impulse counter
AVReporter Schneider Electric M221 plc impulse counterAvreporter KONsys
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Marlon Torres
 
Multi measuring instrument super-s series dienhathe.vn
Multi measuring instrument super-s series dienhathe.vnMulti measuring instrument super-s series dienhathe.vn
Multi measuring instrument super-s series dienhathe.vnDien Ha The
 
ME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportKristopher Saladin
 
PLS 2016: Important ELEXON update: implementation of generic LED charge codes
PLS 2016: Important ELEXON update: implementation of generic LED charge codesPLS 2016: Important ELEXON update: implementation of generic LED charge codes
PLS 2016: Important ELEXON update: implementation of generic LED charge codesInstitution of Lighting Professionals
 
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docx
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docxExercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docx
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docxnealwaters20034
 
Sudarshana Hore_2015 Intern MISO
Sudarshana Hore_2015 Intern MISOSudarshana Hore_2015 Intern MISO
Sudarshana Hore_2015 Intern MISOSudarshana Hore
 
EEP301: Ca06 sample
EEP301: Ca06 sampleEEP301: Ca06 sample
EEP301: Ca06 sampleUmang Gupta
 
To Study and Implement Power Quality Improvement Technique using VSC Based DS...
To Study and Implement Power Quality Improvement Technique using VSC Based DS...To Study and Implement Power Quality Improvement Technique using VSC Based DS...
To Study and Implement Power Quality Improvement Technique using VSC Based DS...ijtsrd
 
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docx
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docxBUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docx
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docxfelicidaddinwoodie
 

Similar to Super capacitor-calculator (20)

Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docx
Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docxWeek 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docx
Week 2 Lab - Digital Signal Conditioning LabInstrumentation Measur.docx
 
Chapter two Part two.pptx
Chapter two Part two.pptxChapter two Part two.pptx
Chapter two Part two.pptx
 
Wireless data monitoring of hybrid powered street light
Wireless data monitoring of hybrid    powered street lightWireless data monitoring of hybrid    powered street light
Wireless data monitoring of hybrid powered street light
 
Wireless data monitoring of hybrid powered street light system
Wireless data monitoring of hybrid powered street light systemWireless data monitoring of hybrid powered street light system
Wireless data monitoring of hybrid powered street light system
 
AVReporter Schneider Electric M221 plc impulse counter
AVReporter Schneider Electric M221 plc impulse counterAVReporter Schneider Electric M221 plc impulse counter
AVReporter Schneider Electric M221 plc impulse counter
 
Diodes
DiodesDiodes
Diodes
 
Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones Hoja de datos lm 555 y configuraciones
Hoja de datos lm 555 y configuraciones
 
Multi measuring instrument super-s series dienhathe.vn
Multi measuring instrument super-s series dienhathe.vnMulti measuring instrument super-s series dienhathe.vn
Multi measuring instrument super-s series dienhathe.vn
 
lesson2.ppsx
lesson2.ppsxlesson2.ppsx
lesson2.ppsx
 
ME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportME401 Experimental Design Lab Report
ME401 Experimental Design Lab Report
 
PLS 2016: Important ELEXON update: implementation of generic LED charge codes
PLS 2016: Important ELEXON update: implementation of generic LED charge codesPLS 2016: Important ELEXON update: implementation of generic LED charge codes
PLS 2016: Important ELEXON update: implementation of generic LED charge codes
 
lm555.pdf
lm555.pdflm555.pdf
lm555.pdf
 
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docx
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docxExercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docx
Exercise 1 – DOL Starters and Soft Starters  Procedure Outlin.docx
 
Altivar 28 users_manual
Altivar 28 users_manualAltivar 28 users_manual
Altivar 28 users_manual
 
Altivar 28 users_manual
Altivar 28 users_manualAltivar 28 users_manual
Altivar 28 users_manual
 
Sudarshana Hore_2015 Intern MISO
Sudarshana Hore_2015 Intern MISOSudarshana Hore_2015 Intern MISO
Sudarshana Hore_2015 Intern MISO
 
63610-80-20 CalibrationTC
63610-80-20 CalibrationTC63610-80-20 CalibrationTC
63610-80-20 CalibrationTC
 
EEP301: Ca06 sample
EEP301: Ca06 sampleEEP301: Ca06 sample
EEP301: Ca06 sample
 
To Study and Implement Power Quality Improvement Technique using VSC Based DS...
To Study and Implement Power Quality Improvement Technique using VSC Based DS...To Study and Implement Power Quality Improvement Technique using VSC Based DS...
To Study and Implement Power Quality Improvement Technique using VSC Based DS...
 
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docx
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docxBUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docx
BUSA 2185 BUSINESS RESEARCHFall 2018Assignment 9 Excel.docx
 

More from Tsuyoshi Horigome

Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)
Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)
Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)Tsuyoshi Horigome
 
SPICE PARK APR2024 ( 6,747 SPICE Models )
SPICE PARK APR2024 ( 6,747 SPICE Models )SPICE PARK APR2024 ( 6,747 SPICE Models )
SPICE PARK APR2024 ( 6,747 SPICE Models )Tsuyoshi Horigome
 
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)Update 31 models(Diode/General ) in SPICE PARK(MAR2024)
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)Tsuyoshi Horigome
 
SPICE PARK MAR2024 ( 6,725 SPICE Models )
SPICE PARK MAR2024 ( 6,725 SPICE Models )SPICE PARK MAR2024 ( 6,725 SPICE Models )
SPICE PARK MAR2024 ( 6,725 SPICE Models )Tsuyoshi Horigome
 
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Tsuyoshi Horigome
 
SPICE PARK FEB2024 ( 6,694 SPICE Models )
SPICE PARK FEB2024 ( 6,694 SPICE Models )SPICE PARK FEB2024 ( 6,694 SPICE Models )
SPICE PARK FEB2024 ( 6,694 SPICE Models )Tsuyoshi Horigome
 
Circuit simulation using LTspice(Case study)
Circuit simulation using LTspice(Case study)Circuit simulation using LTspice(Case study)
Circuit simulation using LTspice(Case study)Tsuyoshi Horigome
 
Mindmap of Semiconductor sales business(15FEB2024)
Mindmap of Semiconductor sales business(15FEB2024)Mindmap of Semiconductor sales business(15FEB2024)
Mindmap of Semiconductor sales business(15FEB2024)Tsuyoshi Horigome
 
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspiceTsuyoshi Horigome
 
PSpice simulation of power supply for TI is Error
PSpice simulation of power supply  for TI is ErrorPSpice simulation of power supply  for TI is Error
PSpice simulation of power supply for TI is ErrorTsuyoshi Horigome
 
IGBT Simulation of Results from Rgext or Rgint
IGBT Simulation of Results from Rgext or RgintIGBT Simulation of Results from Rgext or Rgint
IGBT Simulation of Results from Rgext or RgintTsuyoshi Horigome
 
Electronic component sales method centered on alternative proposals
Electronic component sales method centered on alternative proposalsElectronic component sales method centered on alternative proposals
Electronic component sales method centered on alternative proposalsTsuyoshi Horigome
 
Electronic component sales method focused on new hires
Electronic component sales method focused on new hiresElectronic component sales method focused on new hires
Electronic component sales method focused on new hiresTsuyoshi Horigome
 
Mindmap(electronics parts sales visions)
Mindmap(electronics parts sales visions)Mindmap(electronics parts sales visions)
Mindmap(electronics parts sales visions)Tsuyoshi Horigome
 
Chat GPTによる伝達関数の導出
Chat GPTによる伝達関数の導出Chat GPTによる伝達関数の導出
Chat GPTによる伝達関数の導出Tsuyoshi Horigome
 
伝達関数の理解(Chatgpt)
伝達関数の理解(Chatgpt)伝達関数の理解(Chatgpt)
伝達関数の理解(Chatgpt)Tsuyoshi Horigome
 
DXセミナー(2024年1月17日開催)のメモ
DXセミナー(2024年1月17日開催)のメモDXセミナー(2024年1月17日開催)のメモ
DXセミナー(2024年1月17日開催)のメモTsuyoshi Horigome
 
0Ω抵抗を評価ボードで採用する理由は何ですか?
0Ω抵抗を評価ボードで採用する理由は何ですか?0Ω抵抗を評価ボードで採用する理由は何ですか?
0Ω抵抗を評価ボードで採用する理由は何ですか?Tsuyoshi Horigome
 
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)Tsuyoshi Horigome
 
SPICE PARK JAN2024 (6,665 SPICE Models)
SPICE PARK JAN2024 (6,665 SPICE Models)SPICE PARK JAN2024 (6,665 SPICE Models)
SPICE PARK JAN2024 (6,665 SPICE Models)Tsuyoshi Horigome
 

More from Tsuyoshi Horigome (20)

Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)
Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)
Update 22 models(Schottky Rectifier ) in SPICE PARK(APR2024)
 
SPICE PARK APR2024 ( 6,747 SPICE Models )
SPICE PARK APR2024 ( 6,747 SPICE Models )SPICE PARK APR2024 ( 6,747 SPICE Models )
SPICE PARK APR2024 ( 6,747 SPICE Models )
 
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)Update 31 models(Diode/General ) in SPICE PARK(MAR2024)
Update 31 models(Diode/General ) in SPICE PARK(MAR2024)
 
SPICE PARK MAR2024 ( 6,725 SPICE Models )
SPICE PARK MAR2024 ( 6,725 SPICE Models )SPICE PARK MAR2024 ( 6,725 SPICE Models )
SPICE PARK MAR2024 ( 6,725 SPICE Models )
 
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
 
SPICE PARK FEB2024 ( 6,694 SPICE Models )
SPICE PARK FEB2024 ( 6,694 SPICE Models )SPICE PARK FEB2024 ( 6,694 SPICE Models )
SPICE PARK FEB2024 ( 6,694 SPICE Models )
 
Circuit simulation using LTspice(Case study)
Circuit simulation using LTspice(Case study)Circuit simulation using LTspice(Case study)
Circuit simulation using LTspice(Case study)
 
Mindmap of Semiconductor sales business(15FEB2024)
Mindmap of Semiconductor sales business(15FEB2024)Mindmap of Semiconductor sales business(15FEB2024)
Mindmap of Semiconductor sales business(15FEB2024)
 
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice
2-STAGE COCKCROFT-WALTON [SCHEMATIC] using LTspice
 
PSpice simulation of power supply for TI is Error
PSpice simulation of power supply  for TI is ErrorPSpice simulation of power supply  for TI is Error
PSpice simulation of power supply for TI is Error
 
IGBT Simulation of Results from Rgext or Rgint
IGBT Simulation of Results from Rgext or RgintIGBT Simulation of Results from Rgext or Rgint
IGBT Simulation of Results from Rgext or Rgint
 
Electronic component sales method centered on alternative proposals
Electronic component sales method centered on alternative proposalsElectronic component sales method centered on alternative proposals
Electronic component sales method centered on alternative proposals
 
Electronic component sales method focused on new hires
Electronic component sales method focused on new hiresElectronic component sales method focused on new hires
Electronic component sales method focused on new hires
 
Mindmap(electronics parts sales visions)
Mindmap(electronics parts sales visions)Mindmap(electronics parts sales visions)
Mindmap(electronics parts sales visions)
 
Chat GPTによる伝達関数の導出
Chat GPTによる伝達関数の導出Chat GPTによる伝達関数の導出
Chat GPTによる伝達関数の導出
 
伝達関数の理解(Chatgpt)
伝達関数の理解(Chatgpt)伝達関数の理解(Chatgpt)
伝達関数の理解(Chatgpt)
 
DXセミナー(2024年1月17日開催)のメモ
DXセミナー(2024年1月17日開催)のメモDXセミナー(2024年1月17日開催)のメモ
DXセミナー(2024年1月17日開催)のメモ
 
0Ω抵抗を評価ボードで採用する理由は何ですか?
0Ω抵抗を評価ボードで採用する理由は何ですか?0Ω抵抗を評価ボードで採用する理由は何ですか?
0Ω抵抗を評価ボードで採用する理由は何ですか?
 
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)
Update 40 models(Schottky Rectifier ) in SPICE PARK(JAN2024)
 
SPICE PARK JAN2024 (6,665 SPICE Models)
SPICE PARK JAN2024 (6,665 SPICE Models)SPICE PARK JAN2024 (6,665 SPICE Models)
SPICE PARK JAN2024 (6,665 SPICE Models)
 

Recently uploaded

Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptxSaiGouthamSunkara
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvementVijayMuni2
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxjasonsedano2
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical SensorTanvir Moin
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingMarian Marinov
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxYogeshKumarKJMIT
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderjuancarlos286641
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxJoseeMusabyimana
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabusViolet Violet
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesDIPIKA83
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Amil baba
 

Recently uploaded (20)

Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptx
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvement
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptx
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical Sensor
 
Dev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & LoggingDev.bg DevOps March 2024 Monitoring & Logging
Dev.bg DevOps March 2024 Monitoring & Logging
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptx
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Lecture 2 .pptx
Lecture 2                            .pptxLecture 2                            .pptx
Lecture 2 .pptx
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entender
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptx
 
cloud computing notes for anna university syllabus
cloud computing notes for anna university syllabuscloud computing notes for anna university syllabus
cloud computing notes for anna university syllabus
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display Devices
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
 

Super capacitor-calculator

  • 1. Your Values Errors and Notes VCAP MAX (V) 2.65 VCAP MIN (V) 1.55 tBU (s) 9.48 VSYS (V) 3.04 ISYS_LOAD (A) 0.2 Efficiency η (%) 92 ELOAD (J) 5.76384 Supercap (F) 2.71214003 Input VCAP MAX (V) VCAP MIN (V) tBU (s) Back UpTime VSYS (V) VSYS (V) ISYS_LOAD (A) Efficiency η (%) Energy supplied to the system load during backup Perhaps round to nearest standard value Reserve Power Calculator Welcome to the Maxim Integrated Reserve Power Calculator. To calculate: 1. Enter your values in the green boxes. 2. Click "Check Values" to ensure they are valid. 3. If there are no comments in the "Errors and Notes" column, click "Calculate" to get your final value. If you are still having trouble with number assignments, please refer to the Number Entry Guide below. Note: Check values and correct errors before calculating. 2.5V to 5.0V range,100mV resolution Boost phase target voltage, 80% duty cycle limitation during boosting,100mV resolution Calculations are based on following values with 5% regulation: 1. Inductor value= 1uH( As per EVK) 2. Ton time= 320 ns (Minimum value as per datasheet) 3. Ipeak current = 2A (Minimum value as per datasheet) Isys_load value will vary based on efficiency. Please refer to TOC#9 in datasheet. Please refer to TOC#9 in datasheet to deternimine efficiency value for corrosponding output volatge and load current Number Entry Guide Explanation 2.7V maximum super capacitor rating, 4.5V device maximum; must be below 90% of VSYS,100mV resolution 0.8V to VCAP max range,100mV resolution 1ms to 10s range