Connecting Lakewood Station

712 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
712
On SlideShare
0
From Embeds
0
Number of Embeds
79
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • RDI scores can be at the parcel level, which allows scores to be related to land use information. In other words, a transportation-land use nexus.
  • Connecting Lakewood Station

    1. 1. LAKEWOOD SOUND TRANSIT SOUNDER STATIONYou Can’t Get There From Here<br />Washington APA Conference<br />October 4-6, 2010<br />Dan Penrose, AICP<br />Senior Planner, City of Lakewood<br />
    2. 2.
    3. 3. Station District<br />
    4. 4. Overlay Method for Site Analysis<br />
    5. 5.
    6. 6.
    7. 7.
    8. 8.
    9. 9.
    10. 10.
    11. 11.
    12. 12.
    13. 13.
    14. 14.
    15. 15.
    16. 16.
    17. 17.
    18. 18.
    19. 19.
    20. 20.
    21. 21. Bicycle<br />
    22. 22.
    23. 23. Bike Composite Accessibility Index <br />
    24. 24. What is the Route Directness Index?<br />
    25. 25. RDI thresholds<br />
    26. 26. Lakeview Ave.<br />St Claire Hospital<br />Bridgeport Way<br />115th Street<br />
    27. 27. RR Over-crossing<br />I-5 Over-crossing<br />Making the Pedestrian-Bike Connection<br />
    28. 28. Baseline<br />with Pedestrian Overpass<br />Using Route Directness Index<br />
    29. 29. Before<br />After<br />taller parcels = higher land use density (address points per acre)<br />Land Use Density and RDI<br />
    30. 30. THANK YOU<br />APA Washington Conference<br />October 4-6, 2010<br />Dan Penrose, AICP<br />Senior Planner, City of Lakewood<br />

    ×