LCW Conceptual Restoration Workshop #3

P u b lic In v o lv e m e n t W o r k s h o p
           M a y 10 t h , 2 0 12
Public Involvement Workshop #3
                         Theme: Water
                Mascot: Pacific Green Sea Turtle
                          Color: Blue
• Workshop Goal:
 Initiate development of Conceptual Restoration Alternative
 Designs


• Workshop Objectives:
  – Update on Conceptual Restoration Plan’s progress
  – Introduce Conceptual Restoration Alternative design
    process
  – Perform workshop activity to initiate discussion of
    potential restoration alternatives


• Workshop Groundrules
Public Involvement Workshop #3

 Workshop      Outline
• Summary of Previous Workshops
• Conceptual Restoration Plan Progress Update
  - Overview of Conceptual Restoration Plan scope and progress
   – Review of opportunities and constraints
   – Discussion of alternative design conceptualization process
3. Public Feedback Activity
• Participants develop restoration “bubble diagrams” indicating
   areas needing:
   – Lots of restoration attention
   – Less restoration attention
   – Little restoration attention
4. Next Steps
   -Review of workshop
   -Next workshop topics, time, and location
Public Involvement RIVER Trail
                   Road Map
Summary of Public Involvement Workshop #1
                               Theme: Spirit
                     Mascot: Wandering Skipper butterfly
                               Color: Yellow

• Workshop Goal was: Introduce the project to the community
  and receive initial feedback on public interests and concerns

• Workshop Objectives were:
   –   Discuss Los Cerritos Wetlands’ natural history
   –   Introduce the LCWA and consulting team members
   –   Introduced preliminary project goals and objectives
   –   Exhibit a road-map for Public Involvement Plan
   –   Perform activity to collect feedback on community values and vision
   –   Introduce stakeholder email database and project website
   –   Inform participants of next workshop date
• Workshop Activity Results were…
Workshop Activity Results

                • 40/75 attendees completed the workshop
                  questionnaire
                • 38% of participants live less than 1 mile away

• 51% live 1-5 miles away
• 61% had visited LCW through the LCWA’s stewardship
  program
• 51% enjoy hiking or walking around the wetlands
• 52% value the natural and open space of the wetlands
• 35% would like to see increased tidal influence to the site
• 88% have visited Bolsa Chica Wetlands
LCW Conceptual Restoration Workshop #3
LCW Conceptual Restoration Workshop #3
Summary of Public Involvement Workshop #2
                            Theme: Earth
                       Mascot: Southern Tarplant
                             Color: Green


• Workshop Goal was:
  1) Review the Los Cerritos Wetlands baseline data collected

• Workshop Objectives were:
   – Present findings from Hydrology Report, Watersheds Report, and
     Habitat Assessment Report
   – Discuss the urban setting of Los Cerritos Wetlands and the
     Opportunities and Constraints to Restoration and Public Access
   – Launch LCW Conceptual Restoration Plan Website
   – Perform activity to collect community feedback on baseline data


• Workshop Feedback Activity results were…
LCW Conceptual Restoration Workshop #3
Workshop Activity Results
            Overall Responses to Feedback Activity for Workshop #2
              General Ranking                   Raw Numbers   Raw numbers/Total
    Wow! This station’s information is
comprehensive and it is exciting to see this
data finally compiled. My comments reflect          70              82%
   what I liked most about this station.

Interesting! This station’s information is
excellent, but there are a couple
shortcomings that could be investigated             13              15%
further. My comments express the data gaps
that I observed.
Unimpressed! The information displayed at
this station is not complete and there remain
noticeable opportunities for growth. In my           2               2%
comments I have described the areas that
could be improved upon.

                                   Any Questions?
Los Cerritos Wetlands Authority
In February of 2006, a joint powers agreement was
                adopted among the:
Rivers & Mountains Conservancy, State Coastal Conservancy,
           & Cities of Long Beach & Seal Beach




                         =

These agencies comprise the project’s Steering Committee
Natural History of Los Cerritos Wetlands
Los Cerritos Wetlands
                     Exisiting Conditions
 • Historically over 2400 acres of coastal wetlands
 • Currently around 500 undeveloped acres remain
     – Only ~50 acres of full tidal coastal salt marsh habitat
     – Highly degraded upland, marine, transition, brackish & salt
       marsh habitats
     – Large invasive exotic weed infestations
     – Impacted by industrial, commercial & residential land
       uses
     – Serves as refuge for migratory & special status species
       specialsouthern brown pelican
                concern
               tarplant
                                    least
                                    terns

    Belding’s
                                            mudflat tiger beetles wandering skipper
savannah sparrow
Project Site
Project Scope
•   Develop conceptual restoration plan for Los Cerritos Wetlands
•   2 year long project
•   6 public involvement workshops through Spring 2013
•   6 meetings with the project’s Technical Advisory Committee
Project Organization Chart
    Los Cerritos Wetlands Authority:
            Project Manager

           Steering Committee:
       RMC, Coastal Conservancy,
      Cities of Seal and Long Beach


 Community              Technical Advisory
Stakeholders               Committee

   Public                  Staff from
Involvement             Applicable Public
    Plan                   Agencies



           Consulting Team



     Any Questions?
Conceptual Restoration Alterative Design Process

• Collect data on existing conditions
• Compile and analyze opportunities and constraints to
  restoration
• Meet with the Public to brainstorm potential restoration
  alternatives
• Determine preliminary restoration alternatives
• Meet with Technical Advisory Committee and Public to
  identify final alternatives
• Analyze each of the final restoration alternatives
• Work with all stakeholders to determine the preferred
  restoration alternative
Opportunities
• Topography / Landforms / Soils
   –   Existing ground elevations suitable for coastal wetlands
   –   Existing landforms can be used to control water
   –   Existing roads can provide high tide refugia
   –   Soils suitable for wetlands and uplands habitat cover
   –   Site location provides opportunities for soil disposal
   –   Site size provides opportunities for onsite remediation
   –   Presence of earthquake fault may be deterrent to other development
• Tidal Exchange / Local Watersheds / Hydrology
   –   Site Location Provides Tidal Exchange Enhancement Opportunities
   –   Site Location Provides Freshwater Enhancement Opportunities
   –   Altered Geomorphology Minimizes Sedimentation-Related Maintenance
   –   Watershed Activities will Provide Improved Water Quality
Opportunities (cont.)
• Ecology
  –   Already Existing Ecologically-Valuable Areas
  –   Habitat Potential for Degraded Land Areas
  –   Already Existing Special Status Species
  –   Adjacency to Wildlife Corridors and Connectedness
  –   Potential for Freshwater Habitat
  –   Conversion of Upland Areas to Wetlands Habitat Area


• Climate Change
  –   Utilization of Sea Level Rise (SLR) for Tidal Influence
  –   Existing Hellman Topography Provides for Habitat Adjustment
  –   Potential to Restore Natural Sedimentation
  –   Potential to Accommodate Upslope Transgression of Habitats
  –   Potential to Increase Flood Protection
Opportunities (cont.)
• Infrastructure
   – Lease Agreements Include Reconfiguration of Oil Infrastructure
   – LCWA-Owned Property Includes the San Gabriel River Levees
• Human Interaction
   –   Public Access to Large Open Space Area
   –   Synergy with LCW Stewardship Program
   –   Active Local Stakeholders
   –   Cooperative Efforts with Local University
   –   Adjacent Existing Public Use Areas
   –   Limited Visibility from Housing Developments
   –   Already Existing Infrastructure for Public Interpretation
• Regulatory / Implementation
   – Potential for Additional Land Acquisition
   – Potential Funding Opportunities
   – Potential for Agency Coordination
Constraints

• Topography / Landforms / Soils
   –   Historical Land Uses have Altered Natural Topography
   –   Landform Changes Limit Natural Processes
   –   Existing Soil Quality Limits Restoration Success
   –   Earthquake Fault may Constrain Oil Infrastructure Reconfiguration
       and/or Cause Damage to the Wetlands



• Tidal Exchange / Local Watersheds / Hydrology
   –   Human Disturbance has Altered Tidal Exchange
   –   Human Disturbance has Altered Freshwater Hydrologic Functioning
   –   Human Disturbance has Altered Geomorphology
   –   Poor Water Quality can Impair Restoration Success
Constraints (cont.)

• Ecology
   – Protection of Existing Sensitive Habitat Resources
   – Simplified Food Webs
• Climate Change
   –   SLR will Modify Habitat Proportions
   –   Steep Perimeters will Only Support Narrow Habitat Bands
   –   Natural Sediment Supply is Limited
   –   Limited Areas for Upslope Transgression of Habitats
   –   SLR and Flooding Risk
• Infrastructure
   –   Incorporation of Existing and Future-Remaining Oil Infrastructure
   –   Fragmentation and Encroachment by Roadways
   –   Protection of Existing Flood Control Systems
   –   Fragmentation and Encroachment by Utilities
Constraints (cont.)
• Human Interaction
   –   Habitat Sensitivity to Urban Surroundings
   –   Onsite Homeless Encampments
   –   Maintaining Positive Public Perception
   –   Potential Impacts to Surrounding Neighborhoods
   –   Archaeological Resource Protection
• Regulatory / Implementation
   –   Land Ownership by Other Entities
   –   Easements by Other Entities
   –   Limited Funding
   –   Compensatory Mitigation Restrictions
   –   Permitting and Environmental Reviews
   –   Compliance with the City of Long Beach Local Coastal Program
       and General Plan
Workshop Activity
    Now we want to work on developing preliminary concepts for
                restoration alternatives with you

   We encourage you to use the maps in front of you and:

5. Use the Green Marker to outline areas you think need
        Lots of Restoration Attention
6. Use the Blue Marker to outline areas you think need
        Less Restoration Attention
7.Use the Red Marker to outline areas you think need
        Little Restoration Attention


   Use the pens on the table to explain the
  “bubbles” you have created and describe
             what your vision is.
Public Involvement:
      Tentative Workshop Schedule
#   Date                          Location
1   November 10th, 2011    Seal Beach Senior Center
2   March 8th, 2012        Aquarium of the Pacific
3   May 10th, 2012         Seal Beach Senior Center
4   September 20th, 2012   Aquarium of the Pacific
5   January 31st, 2013     Seal Beach Senior Center
6   April 18th, 2013       Aquarium of the Pacific
Next Steps


• Continue Process of Identifying Potential
  Restoration Design Alternatives
• Determine Preliminary Restoration Design
  Alternatives
• Conduct the 4th Public Workshop
Closing / Leave Behind
Final Questions?
Final Questions?




         Contact:
 info@tidalinfluence.com
1 of 28

Recommended

LCW Conceptual Restoration Workshop #2 by
LCW Conceptual Restoration Workshop #2LCW Conceptual Restoration Workshop #2
LCW Conceptual Restoration Workshop #2TidalInlfluence
6.6K views42 slides
LCW Conceptual Restoration Workshop #6 by
LCW Conceptual Restoration Workshop #6LCW Conceptual Restoration Workshop #6
LCW Conceptual Restoration Workshop #6TidalInlfluence
4.3K views88 slides
LCW Conceptual Restoration Workshop #4 by
LCW Conceptual Restoration Workshop #4LCW Conceptual Restoration Workshop #4
LCW Conceptual Restoration Workshop #4TidalInlfluence
5.5K views35 slides
LCW Public Presentation Workshop #5 by
LCW Public Presentation Workshop #5LCW Public Presentation Workshop #5
LCW Public Presentation Workshop #5TidalInlfluence
5.6K views36 slides
LCW Conceptual Restoration Workshop #1 by
LCW Conceptual Restoration Workshop #1LCW Conceptual Restoration Workshop #1
LCW Conceptual Restoration Workshop #1TidalInlfluence
5K views29 slides
LCW Restoration Plan & EIR- Public Workshop #2 by
LCW Restoration Plan & EIR- Public Workshop #2LCW Restoration Plan & EIR- Public Workshop #2
LCW Restoration Plan & EIR- Public Workshop #2TidalInlfluence
131 views41 slides

More Related Content

What's hot

SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011 by
SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011
SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011Erin Vieira
307 views45 slides
Slipp shoreline care qep outreach meeting 23 november-2011 by
Slipp shoreline care qep outreach meeting 23 november-2011Slipp shoreline care qep outreach meeting 23 november-2011
Slipp shoreline care qep outreach meeting 23 november-2011Erin Vieira
322 views74 slides
Sweetwater Reservoir Habitat Recovery Plan Risk Assessment by
Sweetwater Reservoir Habitat Recovery Plan Risk AssessmentSweetwater Reservoir Habitat Recovery Plan Risk Assessment
Sweetwater Reservoir Habitat Recovery Plan Risk Assessmentmsweesy
683 views26 slides
Planning for Watershed Restoration by Neil Stichert by
Planning for Watershed Restoration by Neil StichertPlanning for Watershed Restoration by Neil Stichert
Planning for Watershed Restoration by Neil StichertSoutheast Alaska Watershed Coalition
678 views36 slides
Kestrel pres feb 13, 13 by
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Lake Superior Binational Forum
597 views22 slides
Pimple dimples eureka2013 by
Pimple dimples eureka2013Pimple dimples eureka2013
Pimple dimples eureka2013Greg Gearheart
471 views73 slides

What's hot(20)

SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011 by Erin Vieira
SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011
SLIPP Shoreline Care Contractors Outreach Meeting 24 November 2011
Erin Vieira307 views
Slipp shoreline care qep outreach meeting 23 november-2011 by Erin Vieira
Slipp shoreline care qep outreach meeting 23 november-2011Slipp shoreline care qep outreach meeting 23 november-2011
Slipp shoreline care qep outreach meeting 23 november-2011
Erin Vieira322 views
Sweetwater Reservoir Habitat Recovery Plan Risk Assessment by msweesy
Sweetwater Reservoir Habitat Recovery Plan Risk AssessmentSweetwater Reservoir Habitat Recovery Plan Risk Assessment
Sweetwater Reservoir Habitat Recovery Plan Risk Assessment
msweesy683 views
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun... by WaterCap
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
WaterCap1.4K views
Rapid Sustainability Assessment Tool-RSAT by CPWF Mekong
Rapid Sustainability Assessment Tool-RSATRapid Sustainability Assessment Tool-RSAT
Rapid Sustainability Assessment Tool-RSAT
CPWF Mekong2.3K views
The se san and nam theun nam kading hydropower dam cascades by CPWF Mekong
The se san and nam theun nam kading hydropower dam cascadesThe se san and nam theun nam kading hydropower dam cascades
The se san and nam theun nam kading hydropower dam cascades
CPWF Mekong1K views
Overview of regional programmes by NAP Events
Overview of regional programmesOverview of regional programmes
Overview of regional programmes
NAP Events34 views
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015 by Fairfax County
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Fairfax County1.1K views
Environmental Flows in the Indian Context - Challenges and Potential by Latha Anantha
Environmental Flows in the Indian Context - Challenges and Potential Environmental Flows in the Indian Context - Challenges and Potential
Environmental Flows in the Indian Context - Challenges and Potential
Latha Anantha1K views
Harford Community Stream Restoration 2013 by Fairfax County
Harford Community Stream Restoration 2013Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013
Fairfax County1.8K views
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities by ecowatchers
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ecowatchers535 views
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho... by Ekonnect
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Ekonnect7K views

Similar to LCW Conceptual Restoration Workshop #3

Aligning Watershed and Habitat Protection for Conservation Success in the Rac... by
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...rshimoda2014
672 views29 slides
Making land-use climate resilient: A participatory watershed management appr... by
Making land-use climate resilient: A participatory watershed management appr...Making land-use climate resilient: A participatory watershed management appr...
Making land-use climate resilient: A participatory watershed management appr...Global Landscapes Forum (GLF)
108 views10 slides
An Integrated Approach to Foster Science-Based Management of Agricultural Dra... by
An Integrated Approach to Foster Science-Based Management of Agricultural Dra...An Integrated Approach to Foster Science-Based Management of Agricultural Dra...
An Integrated Approach to Foster Science-Based Management of Agricultural Dra...National Institute of Food and Agriculture
953 views25 slides
The Watershed Approach by Matthew Lacroix by
The Watershed Approach by Matthew Lacroix The Watershed Approach by Matthew Lacroix
The Watershed Approach by Matthew Lacroix Southeast Alaska Watershed Coalition
1.1K views29 slides
Rccas presentation gm 11_14_13sm by
Rccas presentation gm 11_14_13smRccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13smgreenbelt82
332 views35 slides

Similar to LCW Conceptual Restoration Workshop #3(20)

Aligning Watershed and Habitat Protection for Conservation Success in the Rac... by rshimoda2014
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
Aligning Watershed and Habitat Protection for Conservation Success in the Rac...
rshimoda2014672 views
Rccas presentation gm 11_14_13sm by greenbelt82
Rccas presentation gm 11_14_13smRccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13sm
greenbelt82332 views
LCW Restoration Plan & EIR - Public Workshop #1 by TidalInlfluence
LCW Restoration Plan & EIR - Public Workshop #1 LCW Restoration Plan & EIR - Public Workshop #1
LCW Restoration Plan & EIR - Public Workshop #1
TidalInlfluence374 views
Mitigation symposium - Andre Corbould by YourAlberta
Mitigation symposium - Andre CorbouldMitigation symposium - Andre Corbould
Mitigation symposium - Andre Corbould
YourAlberta7.2K views
Water sector challenges in South Africa by Collin Manickum
Water sector challenges in South AfricaWater sector challenges in South Africa
Water sector challenges in South Africa
Collin Manickum1.6K views
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector by Ethical Sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
Ethical Sector850 views
Dead Run Segments 2/3 Stream Restoration Project Public Meeting by Fairfax County
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Fairfax County724 views
Dead Run Stream Restoration Public Meeting June 9, 2015 by Fairfax County
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
Fairfax County1.8K views
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re... by riseagrant
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
Bruce Carlisle Massachusetts Ocean Management: Implementation Progress and Re...
riseagrant1.2K views

Recently uploaded

Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava... by
Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...
Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...ShapeBlue
48 views17 slides
Digital Personal Data Protection (DPDP) Practical Approach For CISOs by
Digital Personal Data Protection (DPDP) Practical Approach For CISOsDigital Personal Data Protection (DPDP) Practical Approach For CISOs
Digital Personal Data Protection (DPDP) Practical Approach For CISOsPriyanka Aash
81 views59 slides
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ... by
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...ShapeBlue
77 views12 slides
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O... by
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...ShapeBlue
42 views13 slides
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or... by
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...ShapeBlue
88 views20 slides
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f... by
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...TrustArc
77 views29 slides

Recently uploaded(20)

Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava... by ShapeBlue
Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...
Centralized Logging Feature in CloudStack using ELK and Grafana - Kiran Chava...
ShapeBlue48 views
Digital Personal Data Protection (DPDP) Practical Approach For CISOs by Priyanka Aash
Digital Personal Data Protection (DPDP) Practical Approach For CISOsDigital Personal Data Protection (DPDP) Practical Approach For CISOs
Digital Personal Data Protection (DPDP) Practical Approach For CISOs
Priyanka Aash81 views
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ... by ShapeBlue
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...
Backup and Disaster Recovery with CloudStack and StorPool - Workshop - Venko ...
ShapeBlue77 views
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O... by ShapeBlue
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...
Declarative Kubernetes Cluster Deployment with Cloudstack and Cluster API - O...
ShapeBlue42 views
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or... by ShapeBlue
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...
Zero to Cloud Hero: Crafting a Private Cloud from Scratch with XCP-ng, Xen Or...
ShapeBlue88 views
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f... by TrustArc
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...
TrustArc Webinar - Managing Online Tracking Technology Vendors_ A Checklist f...
TrustArc77 views
iSAQB Software Architecture Gathering 2023: How Process Orchestration Increas... by Bernd Ruecker
iSAQB Software Architecture Gathering 2023: How Process Orchestration Increas...iSAQB Software Architecture Gathering 2023: How Process Orchestration Increas...
iSAQB Software Architecture Gathering 2023: How Process Orchestration Increas...
Bernd Ruecker50 views
Transitioning from VMware vCloud to Apache CloudStack: A Path to Profitabilit... by ShapeBlue
Transitioning from VMware vCloud to Apache CloudStack: A Path to Profitabilit...Transitioning from VMware vCloud to Apache CloudStack: A Path to Profitabilit...
Transitioning from VMware vCloud to Apache CloudStack: A Path to Profitabilit...
ShapeBlue57 views
CloudStack Object Storage - An Introduction - Vladimir Petrov - ShapeBlue by ShapeBlue
CloudStack Object Storage - An Introduction - Vladimir Petrov - ShapeBlueCloudStack Object Storage - An Introduction - Vladimir Petrov - ShapeBlue
CloudStack Object Storage - An Introduction - Vladimir Petrov - ShapeBlue
ShapeBlue46 views
Developments to CloudStack’s SDN ecosystem: Integration with VMWare NSX 4 - P... by ShapeBlue
Developments to CloudStack’s SDN ecosystem: Integration with VMWare NSX 4 - P...Developments to CloudStack’s SDN ecosystem: Integration with VMWare NSX 4 - P...
Developments to CloudStack’s SDN ecosystem: Integration with VMWare NSX 4 - P...
ShapeBlue82 views
Mitigating Common CloudStack Instance Deployment Failures - Jithin Raju - Sha... by ShapeBlue
Mitigating Common CloudStack Instance Deployment Failures - Jithin Raju - Sha...Mitigating Common CloudStack Instance Deployment Failures - Jithin Raju - Sha...
Mitigating Common CloudStack Instance Deployment Failures - Jithin Raju - Sha...
ShapeBlue74 views
Setting Up Your First CloudStack Environment with Beginners Challenges - MD R... by ShapeBlue
Setting Up Your First CloudStack Environment with Beginners Challenges - MD R...Setting Up Your First CloudStack Environment with Beginners Challenges - MD R...
Setting Up Your First CloudStack Environment with Beginners Challenges - MD R...
ShapeBlue54 views
How to Re-use Old Hardware with CloudStack. Saving Money and the Environment ... by ShapeBlue
How to Re-use Old Hardware with CloudStack. Saving Money and the Environment ...How to Re-use Old Hardware with CloudStack. Saving Money and the Environment ...
How to Re-use Old Hardware with CloudStack. Saving Money and the Environment ...
ShapeBlue65 views
CloudStack and GitOps at Enterprise Scale - Alex Dometrius, Rene Glover - AT&T by ShapeBlue
CloudStack and GitOps at Enterprise Scale - Alex Dometrius, Rene Glover - AT&TCloudStack and GitOps at Enterprise Scale - Alex Dometrius, Rene Glover - AT&T
CloudStack and GitOps at Enterprise Scale - Alex Dometrius, Rene Glover - AT&T
ShapeBlue56 views
KVM Security Groups Under the Hood - Wido den Hollander - Your.Online by ShapeBlue
KVM Security Groups Under the Hood - Wido den Hollander - Your.OnlineKVM Security Groups Under the Hood - Wido den Hollander - Your.Online
KVM Security Groups Under the Hood - Wido den Hollander - Your.Online
ShapeBlue102 views
Extending KVM Host HA for Non-NFS Storage - Alex Ivanov - StorPool by ShapeBlue
Extending KVM Host HA for Non-NFS Storage -  Alex Ivanov - StorPoolExtending KVM Host HA for Non-NFS Storage -  Alex Ivanov - StorPool
Extending KVM Host HA for Non-NFS Storage - Alex Ivanov - StorPool
ShapeBlue40 views
Webinar : Desperately Seeking Transformation - Part 2: Insights from leading... by The Digital Insurer
Webinar : Desperately Seeking Transformation - Part 2:  Insights from leading...Webinar : Desperately Seeking Transformation - Part 2:  Insights from leading...
Webinar : Desperately Seeking Transformation - Part 2: Insights from leading...

LCW Conceptual Restoration Workshop #3

  • 1. P u b lic In v o lv e m e n t W o r k s h o p M a y 10 t h , 2 0 12
  • 2. Public Involvement Workshop #3 Theme: Water Mascot: Pacific Green Sea Turtle Color: Blue • Workshop Goal: Initiate development of Conceptual Restoration Alternative Designs • Workshop Objectives: – Update on Conceptual Restoration Plan’s progress – Introduce Conceptual Restoration Alternative design process – Perform workshop activity to initiate discussion of potential restoration alternatives • Workshop Groundrules
  • 3. Public Involvement Workshop #3  Workshop Outline • Summary of Previous Workshops • Conceptual Restoration Plan Progress Update - Overview of Conceptual Restoration Plan scope and progress – Review of opportunities and constraints – Discussion of alternative design conceptualization process 3. Public Feedback Activity • Participants develop restoration “bubble diagrams” indicating areas needing: – Lots of restoration attention – Less restoration attention – Little restoration attention 4. Next Steps -Review of workshop -Next workshop topics, time, and location
  • 4. Public Involvement RIVER Trail Road Map
  • 5. Summary of Public Involvement Workshop #1 Theme: Spirit Mascot: Wandering Skipper butterfly Color: Yellow • Workshop Goal was: Introduce the project to the community and receive initial feedback on public interests and concerns • Workshop Objectives were: – Discuss Los Cerritos Wetlands’ natural history – Introduce the LCWA and consulting team members – Introduced preliminary project goals and objectives – Exhibit a road-map for Public Involvement Plan – Perform activity to collect feedback on community values and vision – Introduce stakeholder email database and project website – Inform participants of next workshop date • Workshop Activity Results were…
  • 6. Workshop Activity Results • 40/75 attendees completed the workshop questionnaire • 38% of participants live less than 1 mile away • 51% live 1-5 miles away • 61% had visited LCW through the LCWA’s stewardship program • 51% enjoy hiking or walking around the wetlands • 52% value the natural and open space of the wetlands • 35% would like to see increased tidal influence to the site • 88% have visited Bolsa Chica Wetlands
  • 9. Summary of Public Involvement Workshop #2 Theme: Earth Mascot: Southern Tarplant Color: Green • Workshop Goal was: 1) Review the Los Cerritos Wetlands baseline data collected • Workshop Objectives were: – Present findings from Hydrology Report, Watersheds Report, and Habitat Assessment Report – Discuss the urban setting of Los Cerritos Wetlands and the Opportunities and Constraints to Restoration and Public Access – Launch LCW Conceptual Restoration Plan Website – Perform activity to collect community feedback on baseline data • Workshop Feedback Activity results were…
  • 11. Workshop Activity Results Overall Responses to Feedback Activity for Workshop #2 General Ranking Raw Numbers Raw numbers/Total Wow! This station’s information is comprehensive and it is exciting to see this data finally compiled. My comments reflect 70 82% what I liked most about this station. Interesting! This station’s information is excellent, but there are a couple shortcomings that could be investigated 13 15% further. My comments express the data gaps that I observed. Unimpressed! The information displayed at this station is not complete and there remain noticeable opportunities for growth. In my 2 2% comments I have described the areas that could be improved upon. Any Questions?
  • 12. Los Cerritos Wetlands Authority In February of 2006, a joint powers agreement was adopted among the: Rivers & Mountains Conservancy, State Coastal Conservancy, & Cities of Long Beach & Seal Beach = These agencies comprise the project’s Steering Committee
  • 13. Natural History of Los Cerritos Wetlands
  • 14. Los Cerritos Wetlands Exisiting Conditions • Historically over 2400 acres of coastal wetlands • Currently around 500 undeveloped acres remain – Only ~50 acres of full tidal coastal salt marsh habitat – Highly degraded upland, marine, transition, brackish & salt marsh habitats – Large invasive exotic weed infestations – Impacted by industrial, commercial & residential land uses – Serves as refuge for migratory & special status species specialsouthern brown pelican concern tarplant least terns Belding’s mudflat tiger beetles wandering skipper savannah sparrow
  • 16. Project Scope • Develop conceptual restoration plan for Los Cerritos Wetlands • 2 year long project • 6 public involvement workshops through Spring 2013 • 6 meetings with the project’s Technical Advisory Committee
  • 17. Project Organization Chart Los Cerritos Wetlands Authority: Project Manager Steering Committee: RMC, Coastal Conservancy, Cities of Seal and Long Beach Community Technical Advisory Stakeholders Committee Public Staff from Involvement Applicable Public Plan Agencies Consulting Team Any Questions?
  • 18. Conceptual Restoration Alterative Design Process • Collect data on existing conditions • Compile and analyze opportunities and constraints to restoration • Meet with the Public to brainstorm potential restoration alternatives • Determine preliminary restoration alternatives • Meet with Technical Advisory Committee and Public to identify final alternatives • Analyze each of the final restoration alternatives • Work with all stakeholders to determine the preferred restoration alternative
  • 19. Opportunities • Topography / Landforms / Soils – Existing ground elevations suitable for coastal wetlands – Existing landforms can be used to control water – Existing roads can provide high tide refugia – Soils suitable for wetlands and uplands habitat cover – Site location provides opportunities for soil disposal – Site size provides opportunities for onsite remediation – Presence of earthquake fault may be deterrent to other development • Tidal Exchange / Local Watersheds / Hydrology – Site Location Provides Tidal Exchange Enhancement Opportunities – Site Location Provides Freshwater Enhancement Opportunities – Altered Geomorphology Minimizes Sedimentation-Related Maintenance – Watershed Activities will Provide Improved Water Quality
  • 20. Opportunities (cont.) • Ecology – Already Existing Ecologically-Valuable Areas – Habitat Potential for Degraded Land Areas – Already Existing Special Status Species – Adjacency to Wildlife Corridors and Connectedness – Potential for Freshwater Habitat – Conversion of Upland Areas to Wetlands Habitat Area • Climate Change – Utilization of Sea Level Rise (SLR) for Tidal Influence – Existing Hellman Topography Provides for Habitat Adjustment – Potential to Restore Natural Sedimentation – Potential to Accommodate Upslope Transgression of Habitats – Potential to Increase Flood Protection
  • 21. Opportunities (cont.) • Infrastructure – Lease Agreements Include Reconfiguration of Oil Infrastructure – LCWA-Owned Property Includes the San Gabriel River Levees • Human Interaction – Public Access to Large Open Space Area – Synergy with LCW Stewardship Program – Active Local Stakeholders – Cooperative Efforts with Local University – Adjacent Existing Public Use Areas – Limited Visibility from Housing Developments – Already Existing Infrastructure for Public Interpretation • Regulatory / Implementation – Potential for Additional Land Acquisition – Potential Funding Opportunities – Potential for Agency Coordination
  • 22. Constraints • Topography / Landforms / Soils – Historical Land Uses have Altered Natural Topography – Landform Changes Limit Natural Processes – Existing Soil Quality Limits Restoration Success – Earthquake Fault may Constrain Oil Infrastructure Reconfiguration and/or Cause Damage to the Wetlands • Tidal Exchange / Local Watersheds / Hydrology – Human Disturbance has Altered Tidal Exchange – Human Disturbance has Altered Freshwater Hydrologic Functioning – Human Disturbance has Altered Geomorphology – Poor Water Quality can Impair Restoration Success
  • 23. Constraints (cont.) • Ecology – Protection of Existing Sensitive Habitat Resources – Simplified Food Webs • Climate Change – SLR will Modify Habitat Proportions – Steep Perimeters will Only Support Narrow Habitat Bands – Natural Sediment Supply is Limited – Limited Areas for Upslope Transgression of Habitats – SLR and Flooding Risk • Infrastructure – Incorporation of Existing and Future-Remaining Oil Infrastructure – Fragmentation and Encroachment by Roadways – Protection of Existing Flood Control Systems – Fragmentation and Encroachment by Utilities
  • 24. Constraints (cont.) • Human Interaction – Habitat Sensitivity to Urban Surroundings – Onsite Homeless Encampments – Maintaining Positive Public Perception – Potential Impacts to Surrounding Neighborhoods – Archaeological Resource Protection • Regulatory / Implementation – Land Ownership by Other Entities – Easements by Other Entities – Limited Funding – Compensatory Mitigation Restrictions – Permitting and Environmental Reviews – Compliance with the City of Long Beach Local Coastal Program and General Plan
  • 25. Workshop Activity Now we want to work on developing preliminary concepts for restoration alternatives with you We encourage you to use the maps in front of you and: 5. Use the Green Marker to outline areas you think need Lots of Restoration Attention 6. Use the Blue Marker to outline areas you think need Less Restoration Attention 7.Use the Red Marker to outline areas you think need Little Restoration Attention Use the pens on the table to explain the “bubbles” you have created and describe what your vision is.
  • 26. Public Involvement: Tentative Workshop Schedule # Date Location 1 November 10th, 2011 Seal Beach Senior Center 2 March 8th, 2012 Aquarium of the Pacific 3 May 10th, 2012 Seal Beach Senior Center 4 September 20th, 2012 Aquarium of the Pacific 5 January 31st, 2013 Seal Beach Senior Center 6 April 18th, 2013 Aquarium of the Pacific
  • 27. Next Steps • Continue Process of Identifying Potential Restoration Design Alternatives • Determine Preliminary Restoration Design Alternatives • Conduct the 4th Public Workshop
  • 28. Closing / Leave Behind Final Questions? Final Questions? Contact: info@tidalinfluence.com

Editor's Notes

  1. Insert Green Sea Turtle and Workshop color
  2. Insert Green Sea Turtle and Workshop color